An Integrated Model of Park-And-Ride Facilities for Sustainable Urban Mobility

The Park and Ride (P&R) System is part of a set of parking policies provided by Sustainable Urban Mobility Plans (SUMPs) that have been used in developing efficient, safe and environmentally friendly solutions to reduce the undesirable effects of private vehicles in Central Business District (CBD). In fact, the P&Rs are allocated near public transportation stations to ease transfer from a private vehicle to a public transportation mode. Therefore, the P&R system is considered as an alternative transport mode in which the location and potential demand of each facility are fundamental components to be evaluated within sustainable urban planning. The paper proposes an integrated model of P&R facilities based on estimate the potential demand through a mathematical model of the seven park-and-ride (P&R) facilities (designated A to G) in Cuenca city, Ecuador. The developed integrated model includes two cost functions: one is the P&R mode, and the second is the private car mode. Additionally, a SUMP is integrated into the model as a data collection source in order to find the required parameters for the cost functions and origin–destination (O-D) matrix of private vehicles. The results showed that three out of the seven P&R facilities (P&R C, P&R G, and P&R A) had the highest demand (70% of the overall demand). Consequently, these three P&R facilities were studied separately using the same developed model, and the demand proved to be the highest for P&R facility “C” (39% out of 70%). In conclusion, SUMPs, as a methodology for data collection and a mathematical model, proved to be an effective integrated method for evaluating the most attractive P&R location based on the potential demand.

[1]  James F. Campbell Hub Location and the p-Hub Median Problem , 1996, Oper. Res..

[2]  Graham. Parkhurst,et al.  Park and ride: Could it lead to an increase in car traffic? , 1995 .

[3]  Yuan Gao,et al.  A chance constrained programming approach for uncertain p-hub center location problem , 2016, Comput. Ind. Eng..

[4]  Jurgita Antuchevičienė,et al.  Ranking conceptual locations for a park-and-ride parking lot using EDAS method , 2018 .

[5]  Juan de Dios Ortúzar On the development of the nested logit model , 2001 .

[6]  Bo Du,et al.  Continuum modeling of park-and-ride services considering travel time reliability and heterogeneous commuters - A linear complementarity system approach , 2014 .

[7]  Xiaoning Zhang,et al.  Continuum modeling of park-and-ride services in a linear monocentric city with deterministic mode choice , 2009 .

[8]  Hironori Kato,et al.  Success factors in the introduction of an intermodal passenger transportation system connecting high-speed rail with intercity bus services , 2019 .

[9]  Alan T. Murray,et al.  A GIS‐Based Approach for Delineating Market Areas for Park and Ride Facilities , 2005, Trans. GIS.

[10]  António Pais Antunes,et al.  Optimization-based study of the location of park-and-ride facilities , 2019, Transportation Planning and Technology.

[11]  Hai Yang,et al.  Locating and pricing park-and-ride facilities in a linear monocentric city with deterministic mode choice , 2004 .

[12]  I. Dickins,et al.  Park and ride facilities on light rail transit systems , 1991 .

[13]  Alan T. Murray,et al.  Siting park-and-ride facilities using a multi-objective spatial optimization model , 2008, Comput. Oper. Res..

[14]  Joana Cavadas,et al.  An optimization model for integrated transit-parking policy planning , 2018, Transportation.

[15]  Vladimir Marianov,et al.  p-Hub approach for the optimal park-and-ride facility location problem , 2013, Eur. J. Oper. Res..

[16]  Kornilia Maria Kotoula,et al.  Travelers-led Innovation in Sustainable Urban Mobility Plans , 2019, Periodica Polytechnica Transportation Engineering.

[17]  Jie Zhang,et al.  Which service is better on a linear travel corridor: Park & ride or on-demand public bus? , 2018, Transportation Research Part A: Policy and Practice.

[18]  F CampbellJames,et al.  Hub Location and the p-Hub Median Problem , 1996 .

[19]  Alan T. Murray,et al.  Distance decay and coverage in facility location planning , 2006 .

[20]  János Tóth,et al.  Simulation of the Daily Activity Plans of Travelers Using the Park-and-Ride System and Autonomous Vehicles: Work and Shopping Trip Purposes , 2020, Applied Sciences.

[21]  Xinyuan Chen,et al.  Modelling Rail-Based Park and Ride with Environmental Constraints in a Multimodal Transport Network , 2018, Journal of Advanced Transportation.

[22]  Mark W. Horner,et al.  A GIS-based planning approach to locating urban rail terminals , 2001 .

[23]  Anning Ni,et al.  Stochastic Traffic Assignment Model Considering Park & Ride Network and Travel Time Reliability , 2016 .

[24]  Alex Pentland,et al.  Mapping Time-Varying Accessibility and Territorial Cohesion With Time-Distorted Maps , 2019, IEEE Access.

[25]  Domokos Esztergár-Kiss,et al.  A Method for the Optimization of Daily Activity Chains Including Electric Vehicles , 2020, Energies.

[26]  Luis Ángel Ruiz Fernández,et al.  Using street based metrics to characterize urban typologies , 2014, Comput. Environ. Urban Syst..

[27]  Kenan Hazirbaba,et al.  Excess pore pressure generation and post-cyclic loading settlement of geofiber-reinforced sand , 2018 .

[28]  Eleftherios Sdoukopoulos,et al.  Parking Policies for Supporting Sustainable Mobility , 2012 .

[29]  Toshiyuki Yamamoto,et al.  A System of Shared Autonomous Vehicles Combined with Park-And-Ride in Residential Areas , 2019, Sustainability.

[30]  Alireza Khani,et al.  Modeling park-and-ride location choice of heterogeneous commuters , 2018 .

[31]  Yi He,et al.  Integrated planning of park-and-ride facilities and transit service , 2017 .

[32]  R Williams OXFORD'S PARK-AND-RIDE SYSTEM. , 1999 .

[33]  Fariborz Jolai,et al.  A new stochastic approach for a reliable p-hub covering location problem , 2015, Comput. Ind. Eng..

[34]  Juan de Dios Ortúzar,et al.  Willingness-to-Pay Estimation with Mixed Logit Models: Some New Evidence , 2005 .