An Integrated Model of Park-And-Ride Facilities for Sustainable Urban Mobility
暂无分享,去创建一个
Tamás Péter | Sarbast Moslem | János Tóth | Jairo Ortega | Sarbast Moslem | J. Tóth | Tamás Péter | Jairo Ortega
[1] James F. Campbell. Hub Location and the p-Hub Median Problem , 1996, Oper. Res..
[2] Graham. Parkhurst,et al. Park and ride: Could it lead to an increase in car traffic? , 1995 .
[3] Yuan Gao,et al. A chance constrained programming approach for uncertain p-hub center location problem , 2016, Comput. Ind. Eng..
[4] Jurgita Antuchevičienė,et al. Ranking conceptual locations for a park-and-ride parking lot using EDAS method , 2018 .
[5] Juan de Dios Ortúzar. On the development of the nested logit model , 2001 .
[6] Bo Du,et al. Continuum modeling of park-and-ride services considering travel time reliability and heterogeneous commuters - A linear complementarity system approach , 2014 .
[7] Xiaoning Zhang,et al. Continuum modeling of park-and-ride services in a linear monocentric city with deterministic mode choice , 2009 .
[8] Hironori Kato,et al. Success factors in the introduction of an intermodal passenger transportation system connecting high-speed rail with intercity bus services , 2019 .
[9] Alan T. Murray,et al. A GIS‐Based Approach for Delineating Market Areas for Park and Ride Facilities , 2005, Trans. GIS.
[10] António Pais Antunes,et al. Optimization-based study of the location of park-and-ride facilities , 2019, Transportation Planning and Technology.
[11] Hai Yang,et al. Locating and pricing park-and-ride facilities in a linear monocentric city with deterministic mode choice , 2004 .
[12] I. Dickins,et al. Park and ride facilities on light rail transit systems , 1991 .
[13] Alan T. Murray,et al. Siting park-and-ride facilities using a multi-objective spatial optimization model , 2008, Comput. Oper. Res..
[14] Joana Cavadas,et al. An optimization model for integrated transit-parking policy planning , 2018, Transportation.
[15] Vladimir Marianov,et al. p-Hub approach for the optimal park-and-ride facility location problem , 2013, Eur. J. Oper. Res..
[16] Kornilia Maria Kotoula,et al. Travelers-led Innovation in Sustainable Urban Mobility Plans , 2019, Periodica Polytechnica Transportation Engineering.
[17] Jie Zhang,et al. Which service is better on a linear travel corridor: Park & ride or on-demand public bus? , 2018, Transportation Research Part A: Policy and Practice.
[18] F CampbellJames,et al. Hub Location and the p-Hub Median Problem , 1996 .
[19] Alan T. Murray,et al. Distance decay and coverage in facility location planning , 2006 .
[20] János Tóth,et al. Simulation of the Daily Activity Plans of Travelers Using the Park-and-Ride System and Autonomous Vehicles: Work and Shopping Trip Purposes , 2020, Applied Sciences.
[21] Xinyuan Chen,et al. Modelling Rail-Based Park and Ride with Environmental Constraints in a Multimodal Transport Network , 2018, Journal of Advanced Transportation.
[22] Mark W. Horner,et al. A GIS-based planning approach to locating urban rail terminals , 2001 .
[23] Anning Ni,et al. Stochastic Traffic Assignment Model Considering Park & Ride Network and Travel Time Reliability , 2016 .
[24] Alex Pentland,et al. Mapping Time-Varying Accessibility and Territorial Cohesion With Time-Distorted Maps , 2019, IEEE Access.
[25] Domokos Esztergár-Kiss,et al. A Method for the Optimization of Daily Activity Chains Including Electric Vehicles , 2020, Energies.
[26] Luis Ángel Ruiz Fernández,et al. Using street based metrics to characterize urban typologies , 2014, Comput. Environ. Urban Syst..
[27] Kenan Hazirbaba,et al. Excess pore pressure generation and post-cyclic loading settlement of geofiber-reinforced sand , 2018 .
[28] Eleftherios Sdoukopoulos,et al. Parking Policies for Supporting Sustainable Mobility , 2012 .
[29] Toshiyuki Yamamoto,et al. A System of Shared Autonomous Vehicles Combined with Park-And-Ride in Residential Areas , 2019, Sustainability.
[30] Alireza Khani,et al. Modeling park-and-ride location choice of heterogeneous commuters , 2018 .
[31] Yi He,et al. Integrated planning of park-and-ride facilities and transit service , 2017 .
[32] R Williams. OXFORD'S PARK-AND-RIDE SYSTEM. , 1999 .
[33] Fariborz Jolai,et al. A new stochastic approach for a reliable p-hub covering location problem , 2015, Comput. Ind. Eng..
[34] Juan de Dios Ortúzar,et al. Willingness-to-Pay Estimation with Mixed Logit Models: Some New Evidence , 2005 .