A tabu search algorithm for solving economic lot scheduling problem
暂无分享,去创建一个
[1] Bret J. Wagner,et al. A search heuristic for the sequence-dependent economic lot scheduling problem , 2002, Eur. J. Oper. Res..
[2] Mohamed Ben-Daya,et al. A tabu search approach for the flow shop scheduling problem , 1998, Eur. J. Oper. Res..
[3] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[4] Haldun Aytug,et al. Use of genetic algorithms to solve production and operations management problems: A review , 2003 .
[5] Edward A. Silver,et al. Modelling in Support of Continuous Improvements Towards Achieving World Class Operations , 1993 .
[6] Ilkyeong Moon,et al. The Effect of Externalizing Setups in the Economic Lot Scheduling Problem , 1992, Oper. Res..
[7] KARLA E. BOURLAND,et al. A comparison of solution approaches for the fixed-sequence economic lot scheduling problem , 1997 .
[8] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[9] Edward A. Silver,et al. Hybrid genetic algorithm for the economic lot-scheduling problem , 2002 .
[10] R Mallya. Multi-product scheduling on a single machine: A case study , 1992 .
[11] C L Doll,et al. AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .
[12] Guillermo Gallego. Reduced production rates in the economic lot scheduling problem , 1993 .
[13] Guillermo Gallego. An Extension to the Class of Easy Economic Lot Scheduling Problems , 1990 .
[14] Moutaz Khouja,et al. The scheduling of economic lot sizes on volume flexible production systems , 1997 .
[15] Dong X. Shaw,et al. Complexity of the ELSP with general cyclic schedules , 1997 .
[16] G. Gallego,et al. The economic lot scheduling problem with finite backorder costs , 1992 .
[17] Dug Hee Moon,et al. Determination of optimal production rates on a single facility with dependent mold lifespan , 1998 .
[18] J. Ouenniche,et al. SEQUENCING, LOT SIZING AND SCHEDULING OF SEVERAL PRODUCTS IN JOB SHOPS : THE COMMON CYCLE APPROACH , 1998 .
[19] É. Taillard. Some efficient heuristic methods for the flow shop sequencing problem , 1990 .
[20] Robin O. Roundy,et al. Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .
[21] Zbigniew Michalewicz,et al. The use of genetic algorithms to solve the economic lot size scheduling problem , 1998, Eur. J. Oper. Res..
[22] E. Silver. Deliberately slowing down output in a family production context , 1990 .
[23] D. Simchi-Levi,et al. Controllable production rates in a family production context , 1991 .
[24] I. Moon. Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions , 1994 .
[25] Gregory Dobson. The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..
[26] Edward A. Silver. Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate , 1995 .
[27] Gregory Dobson,et al. The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..
[28] S. Viswanathan,et al. Optimal cycle time and production rate in a family production context with shelf life considerations , 1997 .
[29] L. J. Thomas,et al. Lot Sizing and Sequencing for N Products on One Facility , 1977 .
[30] William L. Maxwell,et al. The scheduling of economic lot sizes , 1964 .
[31] Fred Glover,et al. Tabu Search - Part II , 1989, INFORMS J. Comput..
[32] Chul Lee,et al. The effect of the stabilization period on the economic lot scheduling problem , 1998 .
[33] Paul H. Zipkin. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..
[34] Hark Hwang,et al. Multiproduct economic lot size models with investment costs for setup reduction and quality improvement , 1993 .
[35] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[36] Ilkyeong Moon,et al. Scheduling economic lot sizes in deteriorating production systems , 2003 .
[37] Ilkyeong Moon,et al. Economic lot scheduling problem with imperfect production processes and setup times , 2002, J. Oper. Res. Soc..
[38] E. A. Silver,et al. An overview of heuristic solution methods , 2004, J. Oper. Res. Soc..
[39] Antonio Arreola-Risa,et al. Economic lot scheduling with lost sales and setup times , 2004 .
[40] Colin Lewis,et al. Operations Research in Production Planning and Control , 1994 .
[41] S. Eilon. Economic Batch-Size Determination for Multi-Product Scheduling , 1959 .
[42] W. Hsu. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .
[43] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .
[44] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .
[45] P. C. Jones,et al. When Is The Economic Lot Scheduling Problem Easy , 1989 .