A tabu search algorithm for solving economic lot scheduling problem

The economic lot scheduling problem has driven considerable amount of research. The problem is NP-hard and recent research is focused on finding heuristic solutions rather than searching for optimal solutions. This paper introduces a heuristic method using a tabu search algorithm to solve the economic lot scheduling problem. Diversification and intensification schemes are employed to improve the efficiency of the proposed Tabu search algorithm. Experimental design is conducted to determine the best operating parameters for the Tabu search. Results show that the tabu search algorithm proposed in this paper outperforms two well known benchmark algorithms.

[1]  Bret J. Wagner,et al.  A search heuristic for the sequence-dependent economic lot scheduling problem , 2002, Eur. J. Oper. Res..

[2]  Mohamed Ben-Daya,et al.  A tabu search approach for the flow shop scheduling problem , 1998, Eur. J. Oper. Res..

[3]  G. Rand Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .

[4]  Haldun Aytug,et al.  Use of genetic algorithms to solve production and operations management problems: A review , 2003 .

[5]  Edward A. Silver,et al.  Modelling in Support of Continuous Improvements Towards Achieving World Class Operations , 1993 .

[6]  Ilkyeong Moon,et al.  The Effect of Externalizing Setups in the Economic Lot Scheduling Problem , 1992, Oper. Res..

[7]  KARLA E. BOURLAND,et al.  A comparison of solution approaches for the fixed-sequence economic lot scheduling problem , 1997 .

[8]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[9]  Edward A. Silver,et al.  Hybrid genetic algorithm for the economic lot-scheduling problem , 2002 .

[10]  R Mallya Multi-product scheduling on a single machine: A case study , 1992 .

[11]  C L Doll,et al.  AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .

[12]  Guillermo Gallego Reduced production rates in the economic lot scheduling problem , 1993 .

[13]  Guillermo Gallego An Extension to the Class of Easy Economic Lot Scheduling Problems , 1990 .

[14]  Moutaz Khouja,et al.  The scheduling of economic lot sizes on volume flexible production systems , 1997 .

[15]  Dong X. Shaw,et al.  Complexity of the ELSP with general cyclic schedules , 1997 .

[16]  G. Gallego,et al.  The economic lot scheduling problem with finite backorder costs , 1992 .

[17]  Dug Hee Moon,et al.  Determination of optimal production rates on a single facility with dependent mold lifespan , 1998 .

[18]  J. Ouenniche,et al.  SEQUENCING, LOT SIZING AND SCHEDULING OF SEVERAL PRODUCTS IN JOB SHOPS : THE COMMON CYCLE APPROACH , 1998 .

[19]  É. Taillard Some efficient heuristic methods for the flow shop sequencing problem , 1990 .

[20]  Robin O. Roundy,et al.  Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .

[21]  Zbigniew Michalewicz,et al.  The use of genetic algorithms to solve the economic lot size scheduling problem , 1998, Eur. J. Oper. Res..

[22]  E. Silver Deliberately slowing down output in a family production context , 1990 .

[23]  D. Simchi-Levi,et al.  Controllable production rates in a family production context , 1991 .

[24]  I. Moon Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions , 1994 .

[25]  Gregory Dobson The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..

[26]  Edward A. Silver Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate , 1995 .

[27]  Gregory Dobson,et al.  The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..

[28]  S. Viswanathan,et al.  Optimal cycle time and production rate in a family production context with shelf life considerations , 1997 .

[29]  L. J. Thomas,et al.  Lot Sizing and Sequencing for N Products on One Facility , 1977 .

[30]  William L. Maxwell,et al.  The scheduling of economic lot sizes , 1964 .

[31]  Fred Glover,et al.  Tabu Search - Part II , 1989, INFORMS J. Comput..

[32]  Chul Lee,et al.  The effect of the stabilization period on the economic lot scheduling problem , 1998 .

[33]  Paul H. Zipkin Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..

[34]  Hark Hwang,et al.  Multiproduct economic lot size models with investment costs for setup reduction and quality improvement , 1993 .

[35]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[36]  Ilkyeong Moon,et al.  Scheduling economic lot sizes in deteriorating production systems , 2003 .

[37]  Ilkyeong Moon,et al.  Economic lot scheduling problem with imperfect production processes and setup times , 2002, J. Oper. Res. Soc..

[38]  E. A. Silver,et al.  An overview of heuristic solution methods , 2004, J. Oper. Res. Soc..

[39]  Antonio Arreola-Risa,et al.  Economic lot scheduling with lost sales and setup times , 2004 .

[40]  Colin Lewis,et al.  Operations Research in Production Planning and Control , 1994 .

[41]  S. Eilon Economic Batch-Size Determination for Multi-Product Scheduling , 1959 .

[42]  W. Hsu On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .

[43]  Earl E. Bomberger,et al.  A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .

[44]  Jack D. Rogers A Computational Approach to the Economic Lot Scheduling Problem , 1958 .

[45]  P. C. Jones,et al.  When Is The Economic Lot Scheduling Problem Easy , 1989 .