An analytical algorithm for the pylon saddle pushing stage and distance during the suspension bridge construction

During the construction of suspension bridges, the stress state of the pylon (tower) is improved by pushing the pylon saddle by an appropriate distance at the proper time. An analytical algorithm for the assessment of the required timing and displacements for the pylon saddle pushing at particular construction stages is proposed and verified in this study. The timing calculation is based on the assessment of current hanger tensile forces at each construction stage and the pylon stress state, while the pushing distance/displacement is derived from the conditions of elevation difference closure and the conservation of unstrained length of the main cable segments. This algorithm was successfully applied during the construction of a particular suspension bridge in China with a main span of 730 m. The results obtained strongly indicate that the bending moment in the pylon bottom is contributed by both horizontal and vertical forces of the main cable. The horizontal constituent is dominant and its share gradually increases in the bridge construction process. In a suspension bridge with side spans of various lengths, the stresses in the pylon bottom on the side with a larger side span is more likely to exceed the limit. Therefore, the respective strength criterion controls the pylon saddle-pushing schedule. The proposed analytical algorithm is quite straightforward and is recommended for wider application.

[1]  Myung-Rag Jung,et al.  Simplified Analytical Method for Optimized Initial Shape Analysis of Self-Anchored Suspension Bridges and Its Verification , 2015 .

[2]  Leon S. Lasdon,et al.  Design and Testing of a Generalized Reduced Gradient Code for Nonlinear Programming , 1978, TOMS.

[3]  Ki-Seok Kim,et al.  Analysis of target configurations under dead loads for cable-supported bridges , 2001 .

[4]  Xu Xing Frequent short steps saddle pushing principle in suspension bridge construction , 2007 .

[5]  W. Terence O'Brien,et al.  Cable Movements Under Two-Dimensional Loads , 1964 .

[6]  Anton Petersen,et al.  Erection of suspension bridges , 1994 .

[7]  Zhixiang Zhou,et al.  New Method for Calculating the Preoffsetting Value of the Saddle on Suspension Bridges Considering the Influence of More Parameters , 2016 .

[8]  Heungbae Gil,et al.  CABLE ERECTION TEST AT PYLON SADDLE FOR SPATIAL SUSPENSION BRIDGE , 2001 .

[9]  Myung-Rag Jung,et al.  Nonlinear analysis methods based on the unstrained element length for determining initial shaping of suspension bridges under dead loads , 2013 .

[10]  Wenmin Zhang,et al.  Methods to correct unstrained hanger lengths and cable clamps' installation positions in suspension bridges , 2018, Engineering Structures.

[11]  Koei Takena,et al.  SLIP BEHAVIOR OF CABLE AGAINST SADDLE IN SUSPENSION BRIDGES , 1992 .

[12]  Jindong Bridge: Suspension Bridge with Steel Truss Girder and Prefabricated RC Deck Slabs in China , 2019 .

[13]  Hongping Zhu,et al.  An Iterative Calculation Method for Suspension Bridge's Cable System Based on Exact Catenary Theory , 2013 .

[14]  Leon S. Lasdon,et al.  Nonlinear optimization using the generalized reduced gradient method , 1974 .

[15]  Huu-Tai Thai,et al.  Advanced analysis of multi-span suspension bridges , 2013 .

[16]  Koei Takena,et al.  Frictional Resistance between Cable and Saddle Equipped with Friction Plate , 1995 .

[17]  Raid Karoumi,et al.  Some modeling aspects in the nonlinear finite element analysis of cable supported bridges , 1999 .