Integrating lean and other strategies for mass customization manufacturing: a case study
暂无分享,去创建一个
[1] R. Strattona,et al. The strategic integration of agile and lean supply , 2022 .
[2] Sheldon Howard Jacobson,et al. The kanban assignment problem in serial just-in-time production systems , 1994 .
[3] Jack P. C. Kleijnen,et al. An evolutionary approach to select a pull system among Kanban, Conwip and Hybrid , 2000, J. Intell. Manuf..
[4] Scott Gallagher,et al. The Toyota Way , 2005, IEEE Transactions on Engineering Management.
[5] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[6] William L. Berry,et al. Approaches to mass customization: configurations and empirical validation , 2000 .
[7] John B. Kidd,et al. Toyota Production System , 1993 .
[8] Glenn Ballard,et al. SLAM — A Case Study in Applying Lean to Job Shops , 2005 .
[9] Denis Royston Towill,et al. Lean, agile or leagile? Matching your supply chain to the marketplace , 2000 .
[10] A. G. U Lso,et al. Reconfigurable manufacturing systems: Key to future manufacturing , 2000 .
[11] K. Narasimhan,et al. The Goal: A Process of Ongoing Improvement , 2005 .
[12] Bengt Klefsjö,et al. The machine that changed the world , 2008 .
[13] Rajan Suri,et al. Quick Response Manufacturing , 1998 .
[14] F. Musharavati. RECONFIGURABLE MANUFACTURING SYSTEMS , 2010 .
[15] Giovani J.C. da Silveira,et al. Mass customization: Literature review and research directions , 2001 .
[16] Karl T. Ulrich,et al. Fundamentals of Product Modularity , 1994 .
[17] Hing Kai Chan,et al. A comprehensive survey and future trend of simulation study on FMS scheduling , 2004, J. Intell. Manuf..
[18] Daisuke Hirotani,et al. Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains , 2005 .
[19] R. Krishnamurthy,et al. Leagile manufacturing: a proposed corporate infrastructure , 2007 .
[20] John Bicheno,et al. The Lean Toolbox , 1999 .
[21] Raj Selladurai,et al. Mass customization in operations management: oxymoron or reality? , 2004 .
[22] Shahin Rahimifard,et al. Distributed scheduling to support mass customization in the shoe industry , 2004, Int. J. Comput. Integr. Manuf..
[23] Dale T. Masel,et al. A modular minicell configuration for mass customisation manufacturing , 2007 .
[24] Gilmore Jh,et al. The four faces of mass customization. , 1997 .
[25] Barry Berman,et al. Should your firm adopt a mass customization strategy , 2002 .
[26] Nuno O. Fernandes,et al. Generic POLCA : a production and materials flow control mechanism for quick response manufacturing , 2006 .
[27] Danny Berry,et al. Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .
[28] R. Rerick,et al. Constraint management through the drum-buffer-rope system , 1996, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings.
[29] Yahaya Yusuf,et al. A comparative study of lean and agile manufacturing with a related survey of current practices in the UK , 2002 .
[30] Nika Matovac,et al. Today and tomorrow , 2012, Croatian medical journal.
[31] S. Kotha. Mass Customization: The New Frontier in Business Competition , 1992 .
[32] Tzu Liang Tseng,et al. A novel approach to lean control , 2005 .
[33] Amrik S. Sohal,et al. Quick Response supply chain alliances in the Australian textiles, clothing and footwear industry , 1999 .
[34] Nitin Nohria,et al. Value Networks -- The Future of the U.S. Electric Utility Industry , 1997 .
[35] Henry Mintzberg,et al. Reflecting on the Strategy Process , 1999 .
[36] Bart Victor,et al. New Competitive Strategies: Challenges to Organizations and Information Technology , 1993, IBM Syst. J..
[37] Shigeo Shingo,et al. Non-Stock Production: The Shingo System for Continuous Improvement , 1988 .
[38] Türkay Dereli,et al. A survey on the methods and tools of concurrent new product development and agile manufacturing , 2004, J. Intell. Manuf..
[39] Jayashankar M. Swaminathan. Enabling Customization Using Standardized Operations , 2001 .
[40] Timothy D. Fry,et al. Comparisons between drum–buffer–rope and material requirements planning: a case study , 2005 .
[41] Paul H. Zipkin,et al. The Limits of Mass Customization , 2001 .
[42] Rajan Suri,et al. Quick Response Manufacturing , 1998 .