Influence of Organizational Learning and Firm Size on Risk Management Maturity

[1]  Amy Javernick‐Will Motivating Knowledge Sharing in Engineering and Construction Organizations: Power of Social Motivations , 2012 .

[2]  Ricardo de Almeida Falbo,et al.  Learning How to Manage Risks Using Organizational Knowledge , 2004, LSO.

[3]  Jeremy Busby,et al.  Measurement of organisational maturity in designing safe offshore installations , 2002 .

[4]  Abdullah J. Al-Shehab,et al.  Facilitating Organisational Learning Through Causal Mapping Techniques in IS/IT Project Risk Management , 2005, Wissensmanagement.

[5]  G. Day Continuous Learning about Markets , 1994 .

[6]  Zhen Chen,et al.  Measuring the maturity of risk management in large-scale construction projects , 2013 .

[7]  Joseph F. Hair,et al.  On the Emancipation of PLS-SEM: A Commentary on Rigdon (2012) , 2014 .

[8]  Leslie Godfrey,et al.  Some results on the Glejser and Koenker tests for heteroskedasticity , 1996 .

[9]  M. Amorena,et al.  Sheep milk as a potential indicator of environmental exposure to dioxin-like polychlorinated biphenyls (dl-PCBs) , 2012 .

[10]  C. William Ibbs,et al.  PROJECT MANAGEMENT PROCESS MATURITY (PM)2 MODEL , 2002 .

[11]  B. Hoof Organizational learning in cleaner production among Mexican supply networks , 2014 .

[12]  D Parker,et al.  Safety culture assessment in community pharmacy: development, face validity, and feasibility of the Manchester Patient Safety Assessment Framework , 2005, Quality and Safety in Health Care.

[13]  Simon J. T. Pollard,et al.  Risk Analysis and Management in the Water Utility Sector: A Review of Drivers, Tools and Techniques , 2004 .

[14]  A. Akintoye,et al.  Risk analysis and management in construction , 1997 .

[15]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[16]  P. Bentler,et al.  Fit indices in covariance structure modeling : Sensitivity to underparameterized model misspecification , 1998 .

[17]  Susana Pérez López,et al.  Human Resource Management as a Determining Factor in Organizational Learning , 2006 .

[18]  K. T. Yeo,et al.  Risk management capability maturity model for complex product systems (CoPS) projects , 2009 .

[19]  Alfredo del Caño,et al.  Integrated Methodology for Project Risk Management , 2002 .

[20]  E. Nevis,et al.  Understanding Organizational Learning Capability , 1996 .

[21]  D. A. Kenny,et al.  The moderator-mediator variable distinction in social psychological research: conceptual, strategic, and statistical considerations. , 1986, Journal of personality and social psychology.

[22]  Roger Koenker,et al.  A note on studentizing a test for heteroscedasticity , 1981 .

[23]  Kevin P. Grant,et al.  Project management maturity: an assessment of project management capabilities among and between selected industries , 2006, IEEE Transactions on Engineering Management.

[24]  María Leticia Santos-Vijande,et al.  How organizational learning affects a firm's flexibility, competitive strategy, and performance☆ , 2012 .

[25]  Christopher J. Willis,et al.  The construction industry macro maturity model (CIM3): theoretical underpinnings , 2012 .

[26]  Patrick X.W. Zou,et al.  Understanding and Improving Your Risk Management Capability: Assessment Model for Construction Organizations , 2010 .

[27]  Jörg Henseler,et al.  A New and Simple Approach to Multi-Group Analysis in Partial Least Squares Path Modeling , 2007 .

[28]  Malcolm Patterson,et al.  Managing People to Promote Innovation , 2005 .

[29]  Marko Sarstedt,et al.  Multigroup Analysis in Partial Least Squares (PLS) Path Modeling: Alternative Methods and Empirical Results , 2011 .

[30]  Michael L. Tushman,et al.  Information Processing as an Integrating Concept in Organizational Design. , 1978 .

[31]  G. Huber Organizational Learning: The Contributing Processes and the Literatures , 1991 .

[32]  Ghassan Aouad,et al.  Learning from risks: A tool for post-project risk assessment , 2008 .

[33]  C. Davis,et al.  Business Capabilities of Small Entrepreneurial Media Firms: Independent Production of Children’s Television in Canada , 2008 .

[34]  Martin J. Eppler,et al.  Harvesting project knowledge: a review of project learning methods and success factors , 2003 .

[35]  Sui Pheng Low,et al.  Developing an organizational learning‐based model for risk management in Chinese construction firms , 2009 .

[36]  Steve Rowlinson,et al.  Capturing Safety Knowledge Using Design-for-Safety-Process Tool , 2004 .

[37]  J E Strutt,et al.  Capability maturity models for offshore organisational management. , 2006, Environment international.

[38]  Hamzah Abdul-Rahman,et al.  Aspects of project learning in construction: a socio-technical model , 2014 .

[39]  Marko Sarstedt,et al.  Goodness-of-fit indices for partial least squares path modeling , 2013, Comput. Stat..