Linear $m$ -Consecutive-$k$ , $l$ -Out-of-$n$
暂无分享,去创建一个
[1] Pooja Mohan,et al. GERT Analysis of -Consecutive- -Out-of- Systems , 2007 .
[2] Gregory Levitin,et al. Linear -Consecutive -out-of- -From- Systems , 2011 .
[3] Andreas N. Philippou,et al. On binomial and circular binomial distributions of orderk forl-overlapping success runs of lengthk , 2005 .
[4] Serkan Eryilmaz,et al. Signature based analysis of m‐Consecutive‐k‐out‐of‐n: F systems with exchangeable components , 2011 .
[5] Andreas N. Philippou,et al. Polya, Inverse Polya, and Circular Polya Distributions of Order k for l-Overlapping Success Runs , 2007 .
[6] Amos E. Gera. Combined m1 -Consecutive-kc1 -Out-of-n and m2 -Consecutive-kc2 -Out-of-n Systems , 2011, IEEE Trans. Reliab..
[7] Andreas N. Philippou,et al. Exact reliability formulas for linear and circular m-consecutive-k-out-of-n:F systems , 1996 .
[8] Philip J. Boland,et al. Consecutive k out of n: F systems with Cycle k , 1999 .
[9] S. Papastavridis,et al. m-consecutive-k-out-of-n:F systems , 1990 .
[10] Pooja Mohan,et al. GERT analysis of m-consecutive-k-out-of-n:F system with overlapping runs and (k?1)-step Markov dependence , 2008 .
[11] Serkan Eryilmaz. m-consecutive-k-out-of-n:F system with overlapping runs: signature-based reliability analysis , 2012 .
[12] Philip J. Boland,et al. Signatures of indirect majority systems , 2001, Journal of Applied Probability.
[13] Francisco J. Samaniego,et al. System Signatures and Their Applications in Engineering Reliability , 2007 .
[14] Sigeo Aki,et al. Numbers of Success-Runs of Specified Length Until Certain Stopping Time Rules and Generalized Binomial Distributions of Order k , 2000 .