Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers
暂无分享,去创建一个
[2] Kevin Taaffe,et al. Healthcare Facility Evacuations: Lessons Learned, Research Activity, and the Need for Engineering Contributions , 2010 .
[3] H. Gantt. Work, Wages, and Profits , 1973 .
[4] F. Brian Talbot,et al. Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .
[5] J. H. Patterson,et al. An Algorithm for a general class of precedence and resource constrained scheduling problems , 1989 .
[6] Rainer E. Burkard,et al. The quickest flow problem , 1993, ZOR Methods Model. Oper. Res..
[7] Arno Sprecher,et al. An exact algorithm for project scheduling with multiple modes , 1997 .
[8] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[9] Christian Artigues,et al. Resource-Constrained Project Scheduling , 2008 .
[10] Grzegorz Waligóra,et al. Modelling Setup Times in Project Scheduling , 2006 .
[11] Rema Padman,et al. An integrated survey of deterministic project scheduling , 2001 .
[12] Dario Pacciarelli,et al. Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..
[13] Sönke Hartmann,et al. A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[14] Stephen Warshall,et al. A Theorem on Boolean Matrices , 1962, JACM.
[15] Peter Brucker,et al. A linear programming and constraint propagation-based lower bound for the RCPSP , 2000, Eur. J. Oper. Res..
[16] RAINER KOLISCH,et al. Local search for nonpreemptive multi-mode resource-constrained project scheduling , 1997 .
[17] Richard L. Francis,et al. Network models for building evacuation , 1982 .
[18] Rainer Kolisch. Resource-Constrained Project Scheduling with Setup-Times , 1993 .
[19] Arno Sprecher,et al. Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm , 1998, Eur. J. Oper. Res..
[20] David Gale,et al. Transient flows in networks. , 1959 .
[21] Desiree Steinmann,et al. Improving Hospital Evacuation Planning using Simulation , 2006, Proceedings of the 2006 Winter Simulation Conference.
[22] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[23] Rainer Kolisch,et al. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem , 1995 .
[24] Toshihide Ibaraki,et al. Formulation and Tabu Search Algorithm for the Resource Constrained Project Scheduling Problem , 2002 .
[25] E. Nowicki,et al. A Fast Taboo Search Algorithm for the Job Shop Problem , 1996 .
[26] Kincho H. Law,et al. A multi-agent based framework for the simulation of human and social behaviors during emergency evacuations , 2007, AI & SOCIETY.
[27] Christian Artigues,et al. Insertion techniques for static and dynamic resource-constrained project scheduling , 2003, Eur. J. Oper. Res..
[28] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[29] Mario Vanhoucke. Setup times and fast tracking in resource-constrained project scheduling , 2008, Comput. Ind. Eng..
[30] Robert J Willis,et al. An iterative scheduling technique for resource-constrained project scheduling , 1992 .
[31] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[32] Stevanus Adrianto Tjandra. Dynamic network optimization with application to the evacuation problem , 2003 .
[33] Dario Pacciarelli,et al. Machine Scheduling via Alternative Graphs , 2000 .
[34] Gilbert Laporte,et al. Dynamic transportation of patients in hospitals , 2010, OR Spectr..
[35] Armin Scholl,et al. Managing and modelling general resource transfers in (multi-)project scheduling , 2010, OR Spectr..
[36] David K. Smith. Network Flows: Theory, Algorithms, and Applications , 1994 .
[37] Douglas R. Bish,et al. Decision support for hospital evacuation and emergency response , 2014, Ann. Oper. Res..
[38] V. Maniezzo,et al. An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation , 1998 .
[39] Christian Artigues,et al. Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem , 2005, INFORMS J. Comput..
[40] Rainer Kolisch,et al. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem , 2000, Eur. J. Oper. Res..
[41] E. H. Bowman. THE SCHEDULE-SEQUENCING PROBLEM* , 1959 .
[42] Francisco Ballestín,et al. A hybrid genetic algorithm for the resource-constrained project scheduling problem , 2008, Eur. J. Oper. Res..
[43] Rainer Kolisch,et al. PSPLIB - a project scheduling problem library , 1996 .
[44] Elise Miller-Hooks,et al. The building evacuation problem with shared information , 2008 .
[45] P. Brucker,et al. Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem , 1999 .
[46] Sönke Hartmann,et al. A competitive genetic algorithm for resource-constrained project scheduling , 1998 .
[47] Peter Brucker,et al. A branch and bound algorithm for the resource-constrained project scheduling problem , 1998, Eur. J. Oper. Res..
[48] Erik Demeulemeester,et al. Project scheduling : a research handbook , 2002 .
[49] Éva Tardos,et al. “The quickest transshipment problem” , 1995, SODA '95.
[50] Sönke Hartmann,et al. Project scheduling with multiple modes: A comparison of exact algorithms , 1998, Networks.
[51] Andreas Schadschneider,et al. Simulation of evacuation processes using a bionics-inspired cellular automaton model for pedestrian dynamics , 2002 .
[52] Delbert L. Kimbler,et al. Hospital evacuation: issues and complexities , 2005, Proceedings of the Winter Simulation Conference, 2005..
[53] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[54] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[55] W. Dick,et al. Planung deutscher Krankenhäuser für Großschadensfälle , 1998, Notfall & Rettungsmedizin.
[56] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..
[57] Alf Kimms,et al. Optimization and simulation of traffic flows in the case of evacuating urban areas , 2011, OR Spectr..
[58] Rainer Kolisch,et al. Benchmark instances for project scheduling problems , 1999 .
[59] David D. Bedworth,et al. Integrated Production, Control Systems: Management, Analysis, and Design , 1982 .
[60] B. Roy,et al. Les Problemes d'Ordonnancement , 1967 .
[61] E. W. Davis,et al. Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .
[62] Rainer Kolisch,et al. Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .
[63] Jerome D. Wiest. Some Properties of Schedules for Large Projects with Limited Resources , 1964 .
[64] Andreas Drexl,et al. Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application , 1997 .
[65] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[66] Fred W. Glover,et al. Tabu Search - Part I , 1989, INFORMS J. Comput..
[67] Y. Kochetov,et al. Evolutionary Local Search with Variable Neighborhood for the Resource Constrained Project Scheduling Problem , 2003 .
[68] Kevin Taaffe,et al. Allocation of resources for hospital evacuations via simulation , 2007, 2007 Winter Simulation Conference.
[69] Sarah Bretschneider. Mathematical Models for Evacuation Planning in Urban Areas , 2012 .
[70] Martin Skutella,et al. Time-Expanded Graphs for Flow-Dependent Transit Times , 2002, ESA.
[71] Kevin Taaffe,et al. A model for allocating resources during hospital evacuations , 2009, Comput. Ind. Eng..
[72] Erik Demeulemeester,et al. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .
[73] Bradford H. Gray,et al. Hospitals in Hurricane Katrina: Challenges Facing Custodial Institutions in a Disaster , 2007, Journal of health care for the poor and underserved.
[74] Professor Dr. Klaus Neumann,et al. Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.
[75] Bert De Reyck,et al. A hybrid scatter search/electromagnetism meta-heuristic for project scheduling , 2006, Eur. J. Oper. Res..
[76] Thorsten Koch,et al. Rapid mathematical programming , 2005 .
[77] Rainer Kolisch,et al. Adaptive search for solving hard project scheduling problems , 1996 .
[78] H. W. Hamacher,et al. Mathematical Modelling of Evacuation Problems: A State of Art , 2001 .
[79] D. R. Fulkerson,et al. Constructing Maximal Dynamic Flows from Static Flows , 1958 .
[80] Erik Demeulemeester,et al. New Benchmark Results for the Resource-Constrained Project Scheduling Problem , 1997 .
[81] J W Fondahl,et al. A non-computer approach to the critical path method , 1962 .
[82] Peter J. Stuckey,et al. Why Cumulative Decomposition Is Not as Bad as It Sounds , 2009, CP.
[83] Peter Brucker,et al. Complex Scheduling , 2006 .
[84] Gunnar G. Løvs. Models of wayfinding in emergency evacuations , 1998, Eur. J. Oper. Res..
[85] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[86] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[87] Rainer Kolisch,et al. Project Scheduling Under Partially Renewable Resource Constraints , 1999 .
[88] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[89] Rainer Kolisch,et al. Efficient priority rules for the resource-constrained project scheduling problem , 1996 .
[90] Éva Tardos,et al. Polynomial time algorithms for some evacuation problems , 1994, SODA '94.
[91] Armin Scholl,et al. Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling , 1999, Eur. J. Oper. Res..
[92] James H. Patterson,et al. A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .
[93] Sigrid Knust,et al. The bottleneck transportation problem with auxiliary resources , 2015, 4OR.
[94] R. Słowiński. Multiobjective network scheduling with efficient use of renewable and nonrenewable resources , 1981 .
[95] Federico Barber,et al. An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes , 2009 .
[96] Balázs Kotnyek,et al. An annotated overview of dynamic network flows , 2003 .
[97] Xiaoping Zheng,et al. Modeling crowd evacuation of a building based on seven methodological approaches , 2009 .
[98] Madan Lal Mittal. Multi-project Scheduling with resource transfers , 2005 .
[99] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[100] Alain Quilliot,et al. Flow models for Project Scheduling with transfer delays , 2012, 2012 Federated Conference on Computer Science and Information Systems (FedCSIS).
[101] J. M. Tamarit,et al. Project scheduling with resource constraints: A branch and bound approach , 1987 .
[102] Francisco Ballestín,et al. Justification and RCPSP: A technique that pays , 2005, Eur. J. Oper. Res..
[103] Robert E. Tarjan,et al. Improved Time Bounds for the Maximum Flow Problem Improved Time Bounds for the Maximum Flow Problem Improved Time Bounds for the Maximum Flow Problem , 2008 .
[104] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[105] Fred Glover,et al. Tabu Search - Part II , 1989, INFORMS J. Comput..
[106] George C Lee,et al. Counting Crises: US Hospital Evacuations, 1971–1999 , 2004, Prehospital and Disaster Medicine.
[107] F. F. Boctor,et al. Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .
[108] Sönke Hartmann,et al. A self‐adapting genetic algorithm for project scheduling under resource constraints , 2002 .
[109] Xiaoping Zheng,et al. Simulation of evacuation processes in a square with a partition wall using a cellular automaton model for pedestrian dynamics , 2010 .
[110] Thomas Hanne,et al. Bringing Robustness to Patient Flow Management Through Optimized Patient Transports in Hospitals , 2009, Interfaces.
[111] Jan Karel Lenstra,et al. Job Shop Scheduling by Simulated Annealing , 1992, Oper. Res..
[112] Davood Golmohammadi,et al. Estimation of the evacuation time in an emergency situation in hospitals , 2011, Comput. Ind. Eng..
[113] K. Bouleimen,et al. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version , 2003, Eur. J. Oper. Res..
[114] Jerome D Wiest,et al. THE SCHEDULING OF LARGE PROJECTS WITH LIMITED RESOURCES , 1962 .
[115] Armin Scholl,et al. A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times , 2009 .
[116] Robert Klein,et al. Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects , 2000, Eur. J. Oper. Res..
[117] Horst W. Hamacher,et al. Modeling of building evacuation problems by network flows with side constraints , 1988 .
[118] Oliver Rose,et al. Framework for simulation based scheduling of assembly lines , 2010, Proceedings of the 2010 Winter Simulation Conference.
[119] U. Kreimeier,et al. Krankenhaus-Alarm- und Einsatzpläne für externe Schadenslagen an einem Großklinikum , 2006, Notfall + Rettungsmedizin.
[120] Philippe Baptiste,et al. Tight LP bounds for resource constrained project scheduling , 2004, OR Spectr..
[121] Sigrid Knust,et al. A flow-based tabu search algorithm for the RCPSP with transfer times , 2016, OR Spectr..