Multicriteria selection in concept design of a divertor remote maintenance port in the EU DEMO reactor using an AHP participative approach
暂无分享,去创建一个
Timo Määttä | Kalevi Huhtala | D. Carfora | Gianpiero Esposito | Rocco Mozzillo | G. Di Gironimo | Harri Mäkinen | Gioacchino Miccichè | G. Gironimo | K. Huhtala | R. Mozzillo | G. Esposito | T. Määttä | H. Mäkinen | G. Miccichè | D. Carfora
[1] Antonio Lanzotti,et al. Design Progress of the DEMO Divertor Locking System According to IPADeP Methodology , 2015 .
[2] Christian Bachmann,et al. Development of a master model concept for DEMO vacuum vessel , 2016 .
[3] Mikko Siuko,et al. Improving concept design of divertor support system for FAST tokamak using TRIZ theory and AHP approach , 2013 .
[4] T. Saaty. How to Make a Decision: The Analytic Hierarchy Process , 1990 .
[5] T. Saaty,et al. Why the magic number seven plus or minus two , 2003 .
[6] Alexander Kossiakoff,et al. Systems Engineering Principles and Practice , 2020 .
[7] G. Federici,et al. Conceptual design studies for the European DEMO divertor: Rationale and first results , 2016 .
[8] L. V. Boccaccini,et al. Objectives and status of EUROfusion DEMO blanket studies , 2016 .
[9] Mikko Siuko,et al. Concept design of the DEMO divertor cassette-to-vacuum vessel locking system adopting a systems engineering approach , 2015 .
[10] Timo Määttä,et al. Preliminary concept design of the divertor remote handling system for DEMO power plant , 2014 .
[11] J. Thomas,et al. Pre-conceptual design assessment of DEMO remote maintenance , 2013, 1309.7194.
[12] Thomas L. Saaty,et al. DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .