Last Time Buy and repair decisions for fast moving parts

Spare part availability is essential for advanced capital goods with a long service period. Sourcing becomes challenging once the production of spare parts ceases, while the remaining service period is still long. In this paper, we focus on fast moving parts with repair of failed parts as an alternative supply option. We proceed from the methodology of Behfard et al. (2015) for slow movers, which assumes discrete demand distributions and therefore leads to excessive computation times for fast movers. We find that the use of continuous demand distributions requires significant modifications, both for the approximation of the performance indicators and for the optimization of the repair policy. We develop accurate heuristics to find the near-optimal Last Time Buy (LTB) quantity and the repair policy that we apply for two control policies: pull return - push repair, and push return - pull repair. We show that pull return - push repair is better to follow if return lead times are short and return costs are low. For long return lead times, we find that when the return cost exceeds 35%–40% of the part's value, push return - pull repair becomes more cost efficient. We also show that for relatively high demand of spare parts over the planning period (>300 for a 10 years planning period) the continuous model is a good approximation for the discrete model of Behfard et al. (2015). In addition, the computation time of our method is much lower then.

[1]  Rommert Dekker,et al.  End-of-Life Inventory Decisions for Consumer Electronics Service Parts , 2010 .

[2]  Paul H. Zipkin,et al.  Foundations of Inventory Management , 2000 .

[3]  Sean P. Willems,et al.  Modeling sourcing strategies to mitigate part obsolescence , 2014, Eur. J. Oper. Res..

[4]  Jaekyoung Ahn,et al.  Forecasting service parts demand for a discontinued product , 2008 .

[5]  Leonard Fortuin,et al.  The All‐Time Requirement of Spare Parts for Service After Sales—Theoretical Analysis and Practical Results , 1980 .

[6]  Rommert Dekker,et al.  End-of-life inventory problem with phaseout returns , 2011 .

[7]  Peng Sun,et al.  A Linear Decision-Based Approximation Approach to Stochastic Programming , 2008, Oper. Res..

[8]  Ruud H. Teunter,et al.  Inventory control of service parts in the final phase , 2002, Eur. J. Oper. Res..

[9]  Ruud H. Teunter,et al.  End-of-life service , 1999 .

[10]  W. Zijm,et al.  Computational procedures for stochastic multi-echelon production systems , 1991 .

[11]  E. Ritchie,et al.  Renewal theory forecasting for stock control , 1977 .

[12]  Robin O. Roundy,et al.  Approximation Algorithms for Stochastic Inventory Control Models , 2007, Math. Oper. Res..

[13]  Van-Anh Truong Approximation Algorithm for the Stochastic Multiperiod Inventory Problem via a Look-Ahead Optimization Approach , 2014, Math. Oper. Res..

[14]  Ahmad Al Hanbali,et al.  Last time buy and repair decisions for spare parts , 2015, Eur. J. Oper. Res..

[15]  Harold Krikke,et al.  Last Time Buy and control policies with phase-out returns: a case study in plant control systems , 2009 .

[16]  Ruud H. Teunter,et al.  The 'final orderrs problem , 1998, Eur. J. Oper. Res..

[17]  Gilvan C. Souza,et al.  Good buy? Delaying end-of-life purchases , 2003, Eur. J. Oper. Res..

[18]  Ruud H. Teunter,et al.  Erim Report Series Research in Management Simple Heuristics for Push and Pull Remanufacturing Policies Bibliographic Data and Classifications Simple Heuristics for Push and Pull Remanufacturing Policies , 2022 .

[19]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[20]  Simme Douwe P. Flapper,et al.  Coordination of manufacturing, remanufacturing and returns acceptance in hybrid manufacturing/remanufacturing systems , 2014 .

[21]  Geert-Jan van Houtum,et al.  Spare Parts Inventory Control under System Availability Constraints , 2015 .

[22]  Jr. John R. Moore Forecasting and Scheduling for Past-Model Replacement Parts , 1971 .

[23]  Rainer Kleber,et al.  An Advanced Heuristic for Multiple‐Option Spare Parts Procurement after End‐of‐Production , 2013 .

[24]  T. Tan,et al.  The final order problem for repairable spare parts under condemnation , 2009, J. Oper. Res. Soc..

[25]  Stefan Minner,et al.  Simple expressions for finding recovery system inventory control parameter values , 2003, J. Oper. Res. Soc..

[26]  K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes , 1997 .

[27]  Peter W. Jones,et al.  Stochastic Modelling and Analysis , 1988 .

[28]  David F. Pyke,et al.  Inventory and Production Management in Supply Chains , 2016 .

[29]  Karl Inderfurth,et al.  Decision support for spare parts acquisition in post product life cycle , 2008, Central Eur. J. Oper. Res..

[30]  James R. Bradley,et al.  Lifetime Buy Decisions with Multiple Obsolete Parts , 2009 .