Risk-based optimization of pipe inspections in large underground networks with imprecise information

In this paper, we present a novel risk-based methodology for optimizing the inspections of large underground infrastructure networks in the presence of incomplete information about the network features and parameters. The methodology employs Multi Attribute Value Theory to assess the risk of each pipe in the network, whereafter the optimal inspection campaign is built with Portfolio Decision Analysis (PDA). Specifically, Robust Portfolio Modeling (RPM) is employed to identify Pareto-optimal portfolios of pipe inspections. The proposed methodology is illustrated by reporting a real case study on the large-scale maintenance optimization of the sewerage network in Espoo, Finland.

[1]  R Baur,et al.  Selective inspection planning with ageing forecast for sewer types. , 2002, Water science and technology : a journal of the International Association on Water Pollution Research.

[2]  Richard N. Palmer,et al.  Expert System for Prioritizing the Inspection of Sewers: Knowledge Base Formulation and Evaluation , 2002 .

[3]  J Maiti,et al.  Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.

[4]  Raimo P. Hämäläinen,et al.  Preference Assessment by Imprecise Ratio Statements , 1992, Oper. Res..

[5]  W. Edwards,et al.  Decision Analysis and Behavioral Research , 1986 .

[6]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[7]  Terje Aven,et al.  Interpretations of alternative uncertainty representations in a reliability and risk analysis context , 2011, Reliab. Eng. Syst. Saf..

[8]  Gregory Levitin,et al.  RELIABILITY OF MULTI-STATE SYSTEMS: A HISTORICAL OVERVIEW , 2003 .

[9]  R. L. Keeney,et al.  Decisions with Multiple Objectives: Preferences and Value Trade-Offs , 1977, IEEE Transactions on Systems, Man, and Cybernetics.

[10]  Enrico Zio,et al.  Optimization of the inspection intervals of a safety system in a nuclear power plant by Multi-Objective Differential Evolution (MODE) , 2011, Reliab. Eng. Syst. Saf..

[11]  Yacov Y. Haimes,et al.  Hierarchical analyses of water resources systems : modeling and optimization of large-scale systems , 1977 .

[12]  Jeffrey M. Keisler,et al.  Portfolio decision analysis : improved methods for resource allocation , 2011 .

[13]  Peter J. Fleming,et al.  An Overview of Evolutionary Algorithms in Multiobjective Optimization , 1995, Evolutionary Computation.

[14]  W. E. Vesely,et al.  PRA importance measures for maintenance prioritization applications , 1994 .

[15]  Ahti Salo,et al.  Selecting infrastructure maintenance projects with Robust Portfolio Modeling , 2015, Decis. Support Syst..

[16]  Terje Aven,et al.  The risk concept - historical and recent development trends , 2012, Reliab. Eng. Syst. Saf..

[17]  R. K. Ursem Multi-objective Optimization using Evolutionary Algorithms , 2009 .

[18]  David J. Beale,et al.  Risk-based prioritization and its application to inspection of valves in the water sector , 2012, Reliab. Eng. Syst. Saf..

[19]  Ahti Salo,et al.  Combining a Multiattribute Value Function with an Optimization Model: An Application to Dynamic Resource Allocation for Infrastructure Maintenance , 2009, Decis. Anal..

[20]  Z Kapelan,et al.  An effective multi-objective approach to prioritization of sewer pipe inspection. , 2009, Water science and technology : a journal of the International Association on Water Pollution Research.

[21]  S. French,et al.  Decision Theory: An Introduction to the Mathematics of Rationality. , 1988 .

[22]  Jon C. Helton,et al.  An exploration of alternative approaches to the representation of uncertainty in model predictions , 2003, Reliab. Eng. Syst. Saf..

[23]  Ahti Salo,et al.  Preference programming for robust portfolio modeling and project selection , 2007, Eur. J. Oper. Res..

[24]  R. Hämäläinen,et al.  On the measurement of preferences in the analytic hierarchy process , 1997 .

[25]  Ahti Salo,et al.  Rank inclusion in criteria hierarchies , 2005, Eur. J. Oper. Res..

[26]  Ahti Salo,et al.  Multicriteria Portfolio Modeling for the Development of Shared Action Agendas , 2014 .

[27]  Chiara Vianello,et al.  Quantitative risk assessment of the Italian gas distribution network , 2014 .

[28]  Prasanta Kumar Dey,et al.  Analytic Hierarchy Process Analyzes Risk of Operating Cross-Country Petroleum Pipelines in India , 2003 .

[29]  J. Vaurio Optimization of test and maintenance intervals based on risk and cost , 1995 .

[30]  T. Aven,et al.  On risk defined as an event where the outcome is uncertain , 2009 .

[31]  Faisal Khan,et al.  Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning , 2003 .

[32]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[33]  Ahti Salo,et al.  Robust portfolio modeling with incomplete cost information and project interdependencies , 2008, Eur. J. Oper. Res..

[34]  S. Kaplan,et al.  On The Quantitative Definition of Risk , 1981 .

[35]  E Calixto Integrated Asset integrity management: Risk management, human factor, reliability and maintenance integrated methodology applied to subsea case , 2015 .

[36]  K. McConway,et al.  Decision Theory: An Introduction to the Mathematics of Rationality , 1986 .

[37]  Ahti Salo,et al.  Preference Programming with incomplete ordinal information , 2013, Eur. J. Oper. Res..

[38]  Stephen O. Ogunlana,et al.  Risk‐based maintenance model for offshore oil and gas pipelines: a case study , 2004 .

[39]  R. Hämäläinen,et al.  Preference programming through approximate ratio comparisons , 1995 .

[40]  Riku Vahala,et al.  Pipe-specific criticality classification as a tool for managing risks related to water and wastewater systems , 2015 .

[41]  Mohammad Modarres Risk Analysis in Engineering : Techniques, Tools, and Trends , 2016 .

[42]  Shinsuke Sakai Risk-Based Maintenance , 2010 .

[43]  Faisal Khan,et al.  Risk based asset integrity indicators , 2012 .