Seismic review of the Oyster Creek Nuclear Power Plant as part of the Systematic Evaluation Program
暂无分享,去创建一个
A limited seismic reassessment of Oyster Creek Nuclear Power Plant was performed by the Lawrence Livermore National Laboratory (LLNL) for the US Nuclear Regulatory Commission (NRC) as part of the Systematic Evaluation Program (SEP). The reassessment focused generally on the reactor coolant pressure boundary and on those systems and components necessary to shut down the reactor safety and to maintain it in a safe shutdown condition following a postulated earthquake characterized by a peak horizontal ground acceleration of 0.22 g. Unlike a comprehensive design analysis, the reassessment was limited to structures and components deemed representative of generic classes. Conclusions and recommendations about the ability of selected structures, equipment, and piping to withstand the postulated earthquake are presented. 86 refs., 44 figs., 19 tabs.