Purpose The majority of research on the implementation and use of Building Information Models (BIM) have focused on building design and pre-construction planning. There is only limited research on the usage of BIM in the construction phase, especially by site workers. The purpose of this paper is to analyze the use of BIM by site workers through so-called “BIM-kiosks”. The kiosks allow workers to access BIM models on-site. The aim of this paper is to take a closer look on the introduction of BIM-kiosks and scrutinize how and for what purpose site workers use the kiosks. Design/methodology/approach This is a single case study of an ongoing real-world construction project. The case study is based on qualitative data which stems from observational studies, interviews as well as document studies. Findings Site workers find opportunities for 3D visualization useful and the BIM models are appraised for efficiently handling complex elements. The findings also indicate that the use of BIM-kiosks lead to a greater level of face-to-face collaboration between workers on-site. This may happen because workers meet, both planned and randomly, to discuss in front of the kiosks while using it for visualization. Research limitations/implications The research is limited to a single case. However, some of the recommendations may be relevant to other projects. In addition, the findings demonstrate some of the potential of using BIM on-site in upcoming construction projects. Originality/value Only a few studies have addressed the use of BIM among site workers. Thus, the findings provide practitioners and researchers insight into how current practices may be improved, as well as areas where more research is needed.

[1]  Jean Hartley,et al.  Case study research , 2004 .

[2]  S. Barley,et al.  Bringing Work Back In , 2001 .

[3]  R. Yin Case Study Research: Design and Methods , 1984 .

[4]  S. Kvale,et al.  InterViews: Learning the Craft of Qualitative Research Interviewing , 1996 .

[5]  Xiangyu Wang,et al.  BIM + AR: Onsite information sharing and communication via advanced visualization , 2012, Proceedings of the 2012 IEEE 16th International Conference on Computer Supported Cooperative Work in Design (CSCWD).

[6]  Rafael Sacks,et al.  Requirements for building information modeling based lean production management systems for construction , 2010 .

[7]  Jon Horgen Friberg,et al.  Culture at work: Polish migrants in the ethnic division of labour on Norwegian construction sites , 2012 .

[8]  Bente Halkier,et al.  Methodological Practicalities in Analytical Generalization , 2011 .

[9]  Meng-Han Tsai,et al.  The iHelmet: An AR‐Enhanced Wearable Display for BIM Information , 2012 .

[10]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[11]  Christoph Merschbrock,et al.  BIM Technology acceptance among reinforcement workers - The case of Oslo Airport's terminal 2 , 2016, J. Inf. Technol. Constr..

[12]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[13]  Xiangyu Wang,et al.  Setting new trends of integrated Building Information Modelling (BIM) for construction industry , 2015 .

[14]  B. Flyvbjerg Five Misunderstandings About Case-Study Research , 2006, 1304.1186.

[15]  Ke Chen,et al.  Bridging BIM and building: From a literature review to an integrated conceptual framework , 2015 .

[16]  Chris Harty,et al.  Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project , 2013 .

[17]  Kasun Hewage,et al.  A novel solution for construction on-site communication – the information booth , 2009 .

[18]  Leon A. H. M. van Berlo,et al.  BIM on the construction site: providing hidden information on task specific drawings , 2015, J. Inf. Technol. Constr..

[19]  Xiangyu Wang,et al.  Research trends and opportunities of augmented reality applications in architecture, engineering, and construction , 2013 .

[20]  Timo Hartmann,et al.  Implementing information systems with project teams using ethnographic-action research , 2009, Adv. Eng. Informatics.

[21]  Will Hughes,et al.  Building Design Management , 2001 .

[22]  Ying Wang,et al.  Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry , 2014 .

[23]  Robert K. Merton,et al.  The Focused Interview , 1946, American Journal of Sociology.

[24]  Sara Rankohi,et al.  Review and analysis of augmented reality literature for construction industry , 2013 .

[25]  Per Anker Jensen,et al.  Building information modelling in Denmark and Iceland , 2013 .

[26]  Changyoon Kim,et al.  On-site construction management using mobile computing technology , 2013 .

[27]  Satoru Iwashita,et al.  The application of PDA as mobile computing system on construction management , 2005 .