CPS1 Compliance-Constrained AGC Gain Determination for a Single-Balancing Authority
暂无分享,去创建一个
[1] Hector Chavez,et al. Regulation Adequacy Analysis Under High Wind Penetration Scenarios in ERCOT Nodal , 2012, IEEE Transactions on Sustainable Energy.
[2] E. Ela,et al. Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service , 2012 .
[3] D. Muthumuni,et al. Method for studying and mitigating the effects of wind variability on frequency regulation , 2009, 2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System.
[4] J. Gabriel. The Defense , 2013 .
[5] Le-Ren Chang-Chien,et al. Redesign of frequency controls for CPS evaluations in an isolated power system , 2010, IEEE PES General Meeting.
[6] James D. McCalley,et al. Impact of wind power on control performance standards , 2013 .
[7] R. Blohm. Discussion of: "Statistical and dynamic analysis of generation control performance standards" , 2003 .
[8] Rob J Hyndman,et al. Another look at measures of forecast accuracy , 2006 .
[9] A. Feliachi,et al. Fuzzy rule based load frequency control in compliance with NERC's standards , 2002, IEEE Power Engineering Society Summer Meeting,.
[10] Joseph H. Eto,et al. Analysis of Wind Power and Load Data at Multiple Time Scales , 2011 .
[11] J. Nanda,et al. Some new findings on automatic generation control of an interconnected hydrothermal system with conventional controllers , 2006, IEEE Transactions on Energy Conversion.
[12] Mark O'Malley,et al. Evolution of operating reserve determination in wind power integration studies , 2010, IEEE PES General Meeting.
[13] Anil K. Jain,et al. Algorithms for Clustering Data , 1988 .