An optimisation support for the design of hybrid production lines including assembly and disassembly tasks
暂无分享,去创建一个
Eren Özceylan | Olga Battaïa | Zeynel Abidin Çil | Suleyman Mete | Kürşad Ağpak | Suleyman Mete | Eren Özceylan | O. Battaïa | K. Agpak
[1] Turan Paksoy,et al. Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing , 2014 .
[2] F. Tevhide Altekin,et al. Remedial actions for disassembly lines with stochastic task times , 2016, Comput. Ind. Eng..
[3] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[4] Surendra M. Gupta,et al. Ant colony optimization for sequence‐dependent disassembly line balancing problem , 2013 .
[5] Hadi Gökçen,et al. A Network Model for Parallel Line Balancing Problem , 2007 .
[6] Ibrahim Kucukkoc,et al. Mathematical model and agent based solution approach for the simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines , 2014 .
[7] Sami Kara,et al. Design, management and control of demanufacturing and remanufacturing systems , 2017 .
[8] Pedro M. Vilarinho,et al. ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations , 2006 .
[9] Luk N. Van Wassenhove,et al. Closed - Loop Supply Chain Models with Product Remanufacturing , 2004, Manag. Sci..
[10] Joaquín Bautista,et al. Ant algorithms for a time and space constrained assembly line balancing problem , 2007, Eur. J. Oper. Res..
[11] Hadi Gökçen,et al. Balancing of parallel assembly lines , 2006 .
[12] Ibrahim Kucukkoc,et al. Balancing of parallel U-shaped assembly lines , 2015, Comput. Oper. Res..
[13] Hadi Gökçen,et al. Balancing parallel two-sided assembly lines , 2010 .
[14] Huseyin Selcuk Kilic,et al. Reverse logistics system design for the waste of electrical and electronic equipment (WEEE) in Turkey , 2015 .
[15] Ibrahim Kucukkoc,et al. A mathematical model and genetic algorithm-based approach for parallel two-sided assembly line balancing problem , 2015 .
[16] Ihsan Sabuncuoglu,et al. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .
[17] Saeed Zolfaghari,et al. Mathematical models for parallel two-sided assembly line balancing problems and extensions , 2015 .
[18] Alexandre Dolgui,et al. Second order conic approximation for disassembly line design with joint probabilistic constraints , 2015, Eur. J. Oper. Res..
[19] Mark E. Ferguson,et al. PRODUCTION AND OPERATIONS MANAGEMENT , 2008 .
[20] Ayyuce Aydemir-Karadag,et al. Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..
[21] Hadi Gökçen,et al. Balancing parallel assembly lines with precise and fuzzy goals , 2010 .
[22] Eren Özceylan,et al. Resource Constrained Disassembly Line Balancing Problem , 2016 .
[23] Surendra M. Gupta,et al. A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem , 2016, Ann. Oper. Res..
[24] Alexandre Dolgui,et al. A bibliographic review of production line design and balancing under uncertainty , 2015 .
[25] Alexandre Dolgui,et al. Dealing with uncertainty in disassembly line design , 2014 .
[26] Askiner Gungor,et al. A solution approach to the disassembly line balancing problem in the presence of task failures , 2001 .
[27] Gilvan C. Souza,et al. MIXED ASSEMBLY AND DISASSEMBLY OPERATIONS FOR REMANUFACTURING , 2003 .
[28] Eren Özceylan,et al. A solution approach based on beam search algorithm for disassembly line balancing problem , 2016 .
[29] Surendra M. Gupta,et al. Unified assembly- and disassembly-line model formulae , 2015 .
[30] Neslihan Demirel,et al. A mixed integer linear programming model to optimize reverse logistics activities of end-of-life vehicles in Turkey , 2016 .
[31] Zeynel Abidin Çil,et al. A beam search approach for solving type II robotic parallel assembly line balancing problem , 2017, Appl. Soft Comput..
[32] Manoj Kumar Tiwari,et al. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .
[33] Alexandre Dolgui,et al. Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty , 2018, Int. J. Prod. Res..
[34] Nils Boysen,et al. Designing parallel assembly lines with split workplaces: Model and optimization procedure , 2009 .
[35] Surendra M. Gupta,et al. Reverse supply chains: A source of opportunities and challenges , 2015 .
[36] Amaia Lusa,et al. A survey of the literature on the multiple or parallel assembly line balancing problem , 2008 .
[37] Ihsan Sabuncuoglu,et al. Ant colony optimization for the single model U-type assembly line balancing problem , 2009 .
[38] Marco Dorigo,et al. Ant colony optimization theory: A survey , 2005, Theor. Comput. Sci..
[39] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .