BRIDGE MANAGEMENT SYSTEM WITH BRIDGE MANAGEMENT SYSTEM WITH BRIDGE MANAGEMENT SYSTEM WITH BRIDGE MANAGEMENT SYSTEM WITH INTEGRATED LIFE CYCLE COST OPTIMIZATION INTEGRATED LIFE CYCLE COST OPTIMIZATION INTEGRATED LIFE CYCLE COST OPTIMIZATION INTEGRATED LIFE CYCLE COST OPTIMIZATION
暂无分享,去创建一个
[1] Paul D. Thompson. Decision Support Analysis in Ontario's New Bridge Management System , 2001 .
[2] E Czepiel. BRIDGE MANAGEMENT SYSTEMS LITERATURE REVIEW AND SEARCH , 1995 .
[3] Saad H.S. Al-Jibouri,et al. Proposed genetic algorithms for construction site layout , 2003 .
[4] R B Testa,et al. LIFE CYCLE PERFORMANCE OF BRIDGE COMPONENTS IN NEW YORK CITY , 1999 .
[5] Dan M. Frangopol,et al. Balancing Connectivity of Deteriorating Bridge Networks and Long-Term Maintenance Cost through Optimization , 2005 .
[6] George Morcous. Case-based reasoning for modeling bridge deterioration , 2000 .
[7] Dan M. Frangopol,et al. Bridge Annual Maintenance Prioritization under Uncertainty by Multiobjective Combinatorial Optimization , 2005 .
[8] Dana J. Vanier. ASSET MANAGEMENT: "A" TO "Z" , 2001 .
[9] Susan L. Tighe,et al. SIMPLIFIED USER DELAY COST MODEL FOR PAVEMENT AND BRIDGE LIFE CYCLE ANALYSIS , 2000 .
[10] Allen R. Marshall,et al. The PONTIS bridge management system , 1998 .
[11] George Morcous,et al. Identification of environmental categories for Markovian deterioration models of bridge decks , 2003 .
[12] Yi Jiang,et al. BRIDGE SERVICE LIFE PREDICTION MODEL USING THE MARKOV CHAIN , 1989 .
[13] Erik H. Vanmarcke,et al. Modeling Bridge Deterioration with Markov Chains , 1992 .
[14] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[15] Barry L. Nelson,et al. A framework for simulation-optimization software , 2003 .
[16] R. Frank Carmichael,et al. Microcomputer Bridge Management System , 1993 .
[17] Jamshid Mohammadi,et al. Prediction of Highway Bridge Performance by Artificial Neural Networks and Genetic Algorithms , 2000 .
[18] Donald E. Grierson,et al. Evolutionary Algorithms for Optimizing Bridge Deck Rehabilitation , 2005 .
[19] Ralph Haas,et al. OPAC 2000: A NEW PAVEMENT DESIGN SYSTEM , 1996 .
[20] John O Sobanjo,et al. FLORIDA DOT PROJECT-LEVEL BRIDGE MANAGEMENT MODELS , 2003 .
[21] Hosny Abbas Hosny Mohamed. Development of optimal strategies for Bridge Management Systems. , 1995 .
[22] Mostafa A. Hassanain,et al. Cost optimization of concrete bridge infrastructure , 2003 .
[23] T. Ross. Fuzzy Logic with Engineering Applications , 1994 .
[24] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[25] Riccardo Poli,et al. Particle swarm optimization , 1995, Swarm Intelligence.
[26] Cong Chen. BRIDGE MANAGEMENT UNDER A LEVEL OF SERVICE CONCEPT PROVIDING OPTIMUM IMPROVEMENT ACTION, TIME, AND BUDGET PREDICTION , 1987 .
[27] Chin-Teng Lin,et al. Neural fuzzy systems , 1994 .
[28] Yue Shi,et al. A modified particle swarm optimizer , 1998, 1998 IEEE International Conference on Evolutionary Computation Proceedings. IEEE World Congress on Computational Intelligence (Cat. No.98TH8360).
[29] Marco Dorigo,et al. Ant system: optimization by a colony of cooperating agents , 1996, IEEE Trans. Syst. Man Cybern. Part B.
[30] Cheng Zhang,et al. Mobile Model‐Based Bridge Lifecycle Management System , 2006, Comput. Aided Civ. Infrastructure Eng..
[31] K. C. Chan,et al. A study of genetic crossover operations on the facilities layout problem , 1994 .
[32] Hojjat Adeli,et al. DISCRETE COST OPTIMIZATION OF COMPOSITE FLOORS USING A FLOATING-POINT GENETIC ALGORITHM , 2001 .
[33] R S Reel,et al. PROJECT BRIDGE MANAGEMENT IN ONTARIO , 1993 .
[34] David W Johnston,et al. LEVEL-OF-SERVICE SYSTEM FOR BRIDGE EVALUATION , 1984 .
[35] Yi Jiang,et al. The development of performance prediction and optimization models for bridge management systems , 1990 .
[36] Yi Jiang,et al. BRIDGE PERFORMANCE PREDICTION MODEL USING THE MARKOV CHAIN , 1988 .
[37] John O Sobanjo. A DECISION SUPPORT METHODOLOGY FOR THE REHABILITATION AND REPLACEMENT OF HIGHWAY BRIDGES. , 1991 .
[38] Dan M. Frangopol,et al. Probabilistic Lifetime-Oriented Multiobjective Optimization of Bridge Maintenance: Single Maintenance Type , 2006 .
[39] Paul D Thompson,et al. DEVELOPMENT OF PONTIS USER COST MODELS FOR FLORIDA , 1999 .
[40] John O Sobanjo,et al. STUDY FOR A COMPREHENSIVE BRIDGE MANAGEMENT SYSTEM FOR TEXAS. FINAL REPORT. REVISED JULY 1991 , 1990 .
[41] Yoshito Itoh,et al. Multiobjective Optimization of Bridge Deck Rehabilitation Using a Genetic Algorithm , 1997 .
[42] Hitoshi Furuta,et al. Optimal bridge maintenance planning using improved multi-objective genetic algorithm , 2006, Structures and Infrastructure Systems.
[43] Peter E.D. Love,et al. Genetic search for solving construction site-level unequal-area facility layout problems , 2000 .
[44] H Hawk. BRIDGIT: USER FRIENDLY APPROACH TO BRIDGE MANAGEMENT , 1999 .
[45] Jamshid Mohammadi,et al. Deterioration of reconstructed bridge decks , 2006 .
[46] Dan M. Frangopol,et al. Optimal bridge maintenance planning based on probabilistic performance prediction , 2004 .
[47] Ayaho Miyamoto. Development of a Bridge Management System (J-BMS) in Japan , 2001 .
[48] Hugh Hawk,et al. Bridge Life-cycle Cost Analysis , 2003 .
[49] Kiyoko Yokoyama,et al. DEVELOPMENT OF A BRIDGE MANAGEMENT SYSTEM IN JAPAN , 1996 .
[50] R Ellis,et al. THE NEW ONTARIO BRIDGE MANAGEMENT SYSTEM , 1999 .
[51] Marja-Kaarina Söderqvist,et al. FINNISH PROJECT LEVEL BRIDGE MANAGEMENT SYSTEM , 1999 .
[52] J. C. Lessard,et al. Transportation in Canada , 1956 .
[53] Petros P. Xanthakos,et al. Bridge strengthening and rehabilitation , 1995 .
[54] Paul Schonfeld,et al. Work Zone Lengths for a Four-Lane Road with an Alternate Route , 2005 .
[55] Dan M. Frangopol,et al. Probability-Based Bridge Network Performance Evaluation , 2006 .
[56] Stephen R. Petersen,et al. Life-cycle costing manual for the Federal Energy Management Program , 1996 .
[57] Foad Farid,et al. OPTIMIZING SYSTEM-LEVEL BRIDGE MAINTENANCE, REHABILITATION, AND REPLACEMENT DECISIONS. FINAL REPORT , 1989 .
[58] Sou-Sen Leu,et al. RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .
[59] D S Turner,et al. BRIDGE MANAGEMENT SYSTEM DATA NEEDS AND DATA COLLECTION , 1993 .
[60] George Hearn. CONDITION DATA AND BRIDGE MANAGEMENT SYSTEMS , 1998 .
[61] Andrzej S. Nowak,et al. Capacity Loss Due to Corrosion in Steel-Girder Bridges , 1989 .
[62] Kevin E Lansey,et al. Optimization of Water Distribution Network Design Using the Shuffled Frog Leaping Algorithm , 2003 .
[63] Dan M. Frangopol,et al. Probabilistic Lifetime-Oriented Multiobjective Optimization of Bridge Maintenance: Combination of Maintenance Types , 2006 .
[64] Tarek Hegazy,et al. Bridge Deck Management System with Integrated Life-Cycle Cost Optimization , 2004 .
[65] Tarek Hegazy. Optimization of construction time-cost trade-off analysis using genetic algorithms , 1999 .
[66] Ville de Montréal. MUNICIPAL INFRASTRUCTURE INVESTMENT PLANNING: ASSET MANAGEMENT , 1998 .
[67] Dan M. Frangopol,et al. Time-Dependent Bridge Network Reliability: Novel Approach , 2005 .
[68] Dan M. Frangopol,et al. Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost* , 2007 .
[69] R Ellis,et al. IMPLEMENTATION OF ONTARIO BRIDGE MANAGEMENT SYSTEM , 2003 .
[70] M. Y. Shahin,et al. Pavement Management for Airports, Roads, and Parking Lots , 2006 .
[71] Sai On Cheung,et al. Site pre-cast yard layout arrangement through genetic algorithms , 2002 .
[72] J. L. Wilson,et al. Life‐Cycle Engineering of Bridges , 1997 .
[73] Dan M. Frangopol,et al. RELIABILITY-BASED LIFE-CYCLE MANAGEMENT OF HIGHWAY BRIDGES , 2001 .
[74] Onur Behzat Tokdemir,et al. Comparison of Case-Based Reasoning and Artificial Neural Networks , 1999 .
[75] Hesham Osman,et al. A hybrid CAD-based construction site layout planning system using genetic algorithms , 2003 .
[76] Paul D Thompson,et al. User Cost Model for Bridge Management Systems , 2000 .
[77] J. Doob. Stochastic processes , 1953 .
[78] John O Sobanjo. A Neural Network Approach to Modeling Bridge Deterioration , 1997 .
[79] Matthew G. Karlaftis,et al. Probabilistic Infrastructure Deterioration Models with Panel Data , 1997 .
[80] Tarek Hegazy,et al. A Hybrid AL‐Based System for Site Layout Planning in Construction , 2001 .
[81] S Forrest,et al. Genetic algorithms , 1996, CSUR.
[82] Lyndhurst Collins,et al. An introduction to Markov chain analysis , 1975 .
[83] Eul-Bum Lee,et al. Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies , 2005 .
[84] G. Brodsky,et al. Analysis of parameters of structure deterioration models within the Moscow Bridge Management System , 2006 .
[85] David R. Martinelli,et al. Delay estimation and optimal length for four-lane divided freeway workzones , 1996 .
[86] Ayaho Miyamoto,et al. Practical Applications of a Bridge Management System in Japan , 2000 .
[87] Dan M. Frangopol,et al. Optimizing Bridge Network Maintenance Management under Uncertainty with Conflicting Criteria: Life-Cycle Maintenance, Failure, and User Costs , 2006 .
[88] A. Halim Boussabaine,et al. The use of artificial neural networks in construction management: a review , 1996 .
[89] Arthur J. Helmicki,et al. Condition Assessment for Bridge Management , 1996 .
[90] A. G. Razaqpur,et al. USE OF NEURAL NETWORKS IN BRIDGE MANAGEMENT SYSTEMS , 1995 .
[91] Imad J Abed-Al-Rahim,et al. BRIDGE ELEMENT DETERIORATION RATES , 1995 .
[92] Tarek Hegazy,et al. Bridge Management System With Practical Work Zone Planning , 2006 .