Comprehensive review of delays in power transmission projects

The power transmission (PT) system is at the very heart of the power industry and which is vital to the development of a country. Delays in PT projects have a significant adverse effect on the economic development of a country and although billions of dollars are invested globally in PT projects, costly delays are common. Despite the critical nature of PT, the literature relating to the causes of delays is embryonic, with no theoretical or empirical studies yet conducted to establish the factors involved. This study presents a first step in rectifying this situation. A total of 74 published articles are reviewed that are most closely related to PT projects in order to identify their likely causes of delay. As a result, 82 potential causes of delay are identified and classified into nine major groups. The causes are then ranked in terms of their frequency of occurrence in the literature. Finally, conclusions are drawn concerning the extent to which this review and analysis may form a theoretical framework that can be tested empirically, as well as providing crucial information with recommendation to PT project stakeholders to achieve their key targets including the realisation of the benefits involved.

[1]  Dean Kashiwagi,et al.  Owners’ Perspective of Factors Contributing to Project Delay: Case Studies of Road and Bridge Projects in Saudi Arabia☆ , 2016 .

[2]  Sandra Davis,et al.  Renewable Electricity Generation and Transmission Expansion: A Federal, State or Regional Approach? , 2015 .

[3]  Hamdi A. Bashir,et al.  Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study , 2015 .

[4]  Ibrahim Mahamid,et al.  Risk Matrix for Delay Causes in Construction Projects in Saudi Arabia , 2015 .

[5]  Huiru Zhao,et al.  Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability , 2015 .

[6]  Samuel Famiyeh,et al.  Analysing delay causes and effects in Ghanaian state housing construction projects , 2015 .

[7]  M. Hassanain,et al.  Causes of Delay in Construction Projects in Bangladesh , 2015 .

[8]  Ghanim A. Bekr Causes of Delay in Public Construction Projects in Iraq , 2015 .

[9]  Chidambaram Ramanathan,et al.  A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects , 2014, 2014 IEEE International Conference on Industrial Engineering and Engineering Management.

[10]  C. Aigbavboa,et al.  Construction Project delays in Lusaka, Zambia: Causes and Effects , 2014 .

[11]  Alexander Q. Gilbert,et al.  Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses , 2014 .

[12]  Linh Hong Pham,et al.  Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam , 2014 .

[13]  Performance-Based Models to Address Utility Challenges , 2014 .

[14]  Jimmie Hinze,et al.  Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines , 2014 .

[15]  Ismail Abdul Rahman,et al.  Significant Factors Causing Time Overrun in Construction Projects of Peninsular Malaysia , 2014 .

[16]  Joseph,et al.  Delays to Large Construction Projects in Ghana: A Risk Overview , 2014 .

[17]  Jie Liu,et al.  A Posteriori Error Estimates with Computable Upper Bound for the Nonconforming Rotated Q 1 Finite Element Approximation of the Eigenvalue Problems , 2014 .

[18]  Huiru Zhao,et al.  Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method , 2014 .

[19]  Mohamed M. Marzouk,et al.  Analyzing delay causes in Egyptian construction projects , 2013, Journal of advanced research.

[20]  Wan Hamidon Wan Badaruzzaman,et al.  A Pilot Survey on Causes of Delay in Malaysian Construction Project , 2014 .

[21]  Keith R. Molenaar,et al.  Analysis of Causes of Delay and Time Performance in Construction Projects , 2014 .

[22]  Dongxiao Niu,et al.  The energy supply and demand pattern of China: A review of evolution and sustainable development , 2013 .

[23]  Eefje Cuppen,et al.  The role of dialogue in fostering acceptance of transmission lines: the case of a France–Spain interconnection project , 2013 .

[24]  Remon F. Aziz,et al.  Ranking of delay factors in construction projects after Egyptian revolution , 2013 .

[25]  Hani M. Gharaibeh,et al.  Managing the Cost of Power Transmission Projects: Lessons Learned , 2013 .

[26]  Fiona Lamari,et al.  Public sector project delay: The Malaysian perspective and the way forward , 2013 .

[27]  Siddesh K. Pai,et al.  Analysis of Critical Causes of Delays in Indian Infrastructure Projects , 2013 .

[28]  A. Elkamel,et al.  Electricity demand estimation using an adaptive neuro-fuzzy network: A case study from the Ontario province – Canada , 2013 .

[29]  Mohammad Hossein Fallahnejad,et al.  Delay causes in Iran gas pipeline projects , 2013 .

[30]  Olajide Timothy Ibironke,et al.  Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria , 2013 .

[31]  Henry Mwanaki Alinaitwe,et al.  Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects , 2013 .

[32]  Anil Sawhney,et al.  Structural equation model for investigating factors affecting delay in Indian construction projects , 2012 .

[33]  Tong Liu,et al.  Study on Large Power Grid Construction Projects Whole Process Cost Management Modes , 2012 .

[34]  Amund Bruland,et al.  Causes of Delay in Road Construction Projects , 2012 .

[35]  Serdar Ulubeyli,et al.  Causes of delays in construction projects in Turkey , 2012 .

[36]  Nie-Jia Yau,et al.  Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects , 2012 .

[37]  C. Umarani,et al.  Causes of Delay in Indian Construction Industry , 2012 .

[38]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[39]  Abubakar Danladi Isah,et al.  CAUSES OF DELAY IN NIGERIA CONSTRUCTION INDUSTRY , 2012 .

[40]  Norngainy Mohd Tawil,et al.  Cause of construction delay - Theoretical framework , 2011 .

[41]  Chi-Cheng Yang,et al.  Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer model , 2010 .

[42]  Frank Fugar,et al.  Delays in Building Construction Projects in Ghana , 2010 .

[43]  Jyh-Bin Yang,et al.  Causes of Delay in the Planning and Design Phases for Construction Projects , 2010 .

[44]  Omar Osman,et al.  Causes of Delays in Iranian Construction Projects , 2010 .

[45]  Indra Gunawan,et al.  Analysis of cost and schedule performance of international development projects , 2010 .

[46]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[47]  Matthew Gordon-Watt Project management in the powerline construction industry , 2009 .

[48]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[49]  Seung Heon Han,et al.  Analyzing Schedule Delay of Mega Project: Lessons Learned From Korea Train Express , 2009, IEEE Transactions on Engineering Management.

[50]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[51]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[52]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[53]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[54]  Jyh-Bin YangJ.-B. Yang,et al.  Using structural equation modeling to analyze relationships among key causes of delay in construction , 2008 .

[55]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[56]  A Angelidi Delays in construction projects in Greece: Causes, effects and project management tools , 2007 .

[57]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[58]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[59]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[60]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[61]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[62]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[63]  S Meeampol,et al.  Factors affecting cost and time performance on highway construction projects: Evidence from Thailand , 2006 .

[64]  Othman Mohamed,et al.  Delay Mitigation in the Malaysian Construction Industry , 2006 .

[65]  F. Wua,et al.  Transmission investment and expansion planning in a restructured electricity market , 2006 .

[66]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[67]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[68]  Sugiharto Alwi,et al.  Identifying the important causes of delays in bulding construction projects , 2003 .

[69]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[70]  Eric Hirst,et al.  Key Transmission Planning Issues , 2001 .

[71]  K. P. Kannan,et al.  Time and cost over-runs of the power projects in Kerala , 2001 .

[72]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[73]  B. Kirby,et al.  Maintaining Transmission Adequacy in the Future , 1999 .

[74]  Martin Loosemore,et al.  The three ironies of crisis management in construction projects , 1998 .

[75]  T. Mezher,et al.  Causes of delays in the construction industry in Lebanon , 1998 .

[76]  Mohan M. Kumaraswamy,et al.  Contributors to construction delays , 1998 .

[77]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[78]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[79]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[80]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[81]  Francis T. Hartman,et al.  Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .

[82]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[83]  Michael T. Callahan,et al.  Construction Delay Claims , 1992 .

[84]  Sebastian Morris,et al.  Cost and Time Overruns in Public Sector Projects , 2005 .

[85]  R. Gregory,et al.  Public perceptions of electric power transmission lines , 1988 .