The Non-Piled Foundation Systems of the Snorre Field

A new milestone has been passed in offshore development with the completion of the Snorre (Phase I) field installations this summer. The installation are located in more than 300m water depth supported on very soft soil. The foundation systems represent a major breakthrough for their simplicity, cost-effectiveness, and technical reliability.