Contractor Selection Using Fuzzy Hybrid AHP-VIKOR

In recent years, contractors play a major role in construction projects of buildings, roads, or waterworks under supervision of project owners or employers of these projects. So, that is why contractor selection is an important decision for employers. Contractor selection is a multicriterion decision problem and resolving the problem of evaluation and although ranking the candidate contractors has become a key factor for firms and enterprises. In this article, the proposed a new hybrid AHP and VIKOR methodology is applied to select the best contractor. Because of dealing with uncertain values for the criteria, fuzzy logic is used to solve this problem and the evaluation data for the alternatives have been expressed in linguistic terms. So, both AHP and VIKOR methods are performed under fuzzy environment. The fuzzy AHP is applied to form the structure of the contractor selection problem and also to obtain weights of the evaluation criteria, and fuzzy VIKOR method is used to determine final ranking. A numerical example is proposed to illustrate an application of the proposed method that demonstrates the effectiveness of the proposed model.

[1]  Jeffrey S. Russell,et al.  Contractor prequalification data for construction owners , 1992 .

[2]  Heng Li,et al.  Contractor selection using the analytic network process , 2004 .

[3]  Gwo-Hshiung Tzeng,et al.  Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..

[4]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[5]  D. K. H. Chua,et al.  Key Factors in Bid Reasoning Model , 2000 .

[6]  Deng Yong Plant location selection based on fuzzy TOPSIS , 2006 .

[7]  Ekambaram Palaneeswaran,et al.  A support vector machine model for contractor prequalification , 2009 .

[8]  Cengiz Kahraman,et al.  Fuzzy multiple criteria forestry decision making based on an integrated VIKOR and AHP approach , 2011, Expert Syst. Appl..

[9]  Y. Ilker Topcu,et al.  A decision model proposal for construction contractor selection in Turkey , 2004 .

[10]  Zedan Hatush,et al.  Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .

[11]  Piotr Jaskowski,et al.  Multicriteria construction project scheduling method using evolutionary algorithm , 2006, Oper. Res..

[12]  James J. Buckley,et al.  Fuzzy hierarchical analysis: the Lambda-Max method , 2001, Fuzzy Sets Syst..

[13]  Daniel Castro-Lacouture,et al.  Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach , 2009 .

[14]  Gin-Shuh Liang,et al.  Combining VIKOR with GRA techniques to evaluate service quality of airports under fuzzy environment , 2011, Expert Syst. Appl..

[15]  Selim Zaim,et al.  Analyzing business competition by using fuzzy TOPSIS method: An example of Turkish domestic airline industry , 2011, Expert Syst. Appl..

[16]  Filippo Emanuele Ciarapica,et al.  A FUZZY-QFD APPROACH TO SUPPLIER SELECTION , 2006 .

[17]  Gwo-Hshiung Tzeng,et al.  Fuzzy MCDM approach for planning and design tenders selection in public office buildings , 2004 .

[18]  D. Chang Applications of the extent analysis method on fuzzy AHP , 1996 .

[19]  Robert L. K. Tiong,et al.  Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners , 2006 .

[20]  Richard Bellman,et al.  Decision-making in fuzzy environment , 2012 .

[21]  Oleg Kapliński,et al.  Three phases of multifactor modelling of construction processes , 2006 .

[22]  Anna Sobotka,et al.  Multi‐attribute analysis for the eco‐energetic assessment of the building life cycle , 2009 .

[23]  Ludmil Mikhailov,et al.  Deriving priorities from fuzzy pairwise comparison judgements , 2003, Fuzzy Sets Syst..

[24]  Mohammad Jafar Tarokh,et al.  A fuzzy VIKOR method for supplier selection based on entropy measure for objective weighting , 2011, Expert Syst. Appl..

[25]  J. Buckley,et al.  Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[26]  Ka Chi Lam,et al.  Using the principal component analysis method as a tool in contractor pre‐qualification , 2005 .

[27]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[28]  Jeffrey S. Russell,et al.  Risk analysis approach to selection of contractor evaluation method , 1992 .

[29]  Piotr Jaśkowski Designing the structure of a construction project operating system using evolutionary algorithm , 2008 .

[30]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[31]  Donn E. Hancher,et al.  Evaluation of Competitive Bids , 1995 .

[32]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[33]  Abdullah M. Alsugair Framework for Evaluating Bids of Construction Contractors , 1999 .

[34]  Dariusz Skorupka,et al.  The method of identification and quantification of construction projects risk , 2005 .

[35]  Kavita Devi,et al.  Extension of VIKOR method in intuitionistic fuzzy environment for robot selection , 2011, Expert Syst. Appl..

[36]  Konstantinos P. Anagnostopoulos,et al.  An AHP model for construction contractor prequalification , 2006, Oper. Res..

[37]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[38]  Siamak Haji Yakhchali,et al.  Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods , 2012 .

[39]  Gwo-Hshiung Tzeng,et al.  Multicriteria Planning of Post‐Earthquake Sustainable Reconstruction , 2002 .

[40]  Mohan M. Kumaraswamy,et al.  Contractor evaluation and selection: a Hong Kong perspective , 1996 .

[41]  Zenonas Turskis,et al.  Multi‐attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique , 2008 .

[42]  David S. Cottrell,et al.  Contractor Process Improvement for Enhancing Construction Productivity , 2006 .

[43]  Miroslaw J. Skibniewski,et al.  Qualifier-2: Knowledge-Based System for Contractor Prequalification , 1990 .

[44]  Tien-Chin Wang,et al.  Multi-Criteria Decision Analysis by Using Fuzzy VIKOR , 2006, 2006 International Conference on Service Systems and Service Management.