PLANNING AND SCHEDULING MODELS FOR REFINERY OPERATIONS

[1]  R. Sargent,et al.  The optimal operation of mixed production facilities—a general formulation and some approaches for the solution , 1996 .

[2]  G. Maddala,et al.  The Pooling Problem , 1996 .

[3]  J. M. Pinto,et al.  Mixed-Integer Linear Programming Model for Refinery Short-Term Scheduling of Crude Oil Unloading with Inventory Management , 1996 .

[4]  R. Sargent,et al.  A general algorithm for short-term scheduling of batch operations */I , 1993 .

[5]  J. M. Pinto,et al.  Optimal cyclic scheduling of multistage continuous multiproduct plants , 1994 .

[6]  Jose M. Pinto,et al.  A mixed integer model for LPG scheduling , 2000 .

[7]  Rajan Suri,et al.  From CAN-Q to MPX: Evolution of Queuing Software for Manufacturing , 1995 .

[8]  Ignacio E. Grossmann,et al.  Assignment and sequencing models for thescheduling of process systems , 1998, Ann. Oper. Res..

[9]  Jose M. Pinto,et al.  A PLANNING MODEL FOR REFINERY DIESEL PRODUCTION , 1998 .

[10]  C. E. Bodington,et al.  Optimize the supply chain , 1996 .

[11]  Nilay Shah,et al.  Mathematical programming techniques for crude oil scheduling , 1996 .

[12]  Gifford H. Symonds,et al.  Linear programming : the solution of refinery problems , 1955 .

[13]  Leon S. Lasdon,et al.  The Evolution of Texaco's Blending Systems: From OMEGA to StarBlend , 1995 .

[14]  Christodoulos A. Floudas,et al.  Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous Processes , 1998 .

[15]  I. Grossmann,et al.  A combined penalty function and outer-approximation method for MINLP optimization : applications to distillation column design , 1989 .

[16]  T. Westerlund,et al.  Convexification of different classes of non-convex MINLP problems , 1999 .

[17]  I. Grossmann,et al.  MINLP model for cyclic multiproduct scheduling on continuous parallel lines , 1991 .

[18]  Gintaras V. Reklaitis,et al.  Overview of Scheduling and Planning of Batch Process Operations , 1996 .

[19]  E. Kondili,et al.  A General Algorithm for Scheduling Batch Operations , 1988 .

[20]  R. Pelham,et al.  Refinery operations and control: A future vision , 1996 .

[21]  Ronald E. Coxhead Integrated planning and scheduling systems for the refining industry , 1994 .

[22]  C. Edward Bodington,et al.  Planning, Scheduling, and Control Integration in the Process Industries , 1995 .

[23]  David A. Kendrick,et al.  GAMS : a user's guide, Release 2.25 , 1992 .