A non-results-based effectiveness index for construction site managers
暂无分享,去创建一个
[1] H. J. Bernardin,et al. Predicting (and preventing) differences between self and supervisory appraisals. , 1985, Personnel Administration.
[2] William F. Maloney,et al. Influence of foremen on performance , 1987 .
[3] Richard L. Tucker,et al. Productive foremen in industrial construction , 1986 .
[4] D. Mcclelland. Testing for competence rather than for "intelligence". , 1973, The American psychologist.
[5] Walter C. Borman,et al. Exploring upper limits of reliability and validity in job performance ratings. , 1978 .
[6] W. J. Heisler. Management Development: Context and Strategies , 1980 .
[7] Peter Lansley,et al. Organisation structure, management style and company performance , 1974 .
[8] J. Hunter,et al. Validity and Utility of Alternative Predictors of Job Performance , 1984 .
[9] Manuel London,et al. RATINGS OF MANAGERIAL CHARACTERISTICS: EVALUATION DIFFICULTY, CO‐WORKER AGREEMENT, AND SELF‐AWARENESS , 1989 .
[10] Glenn M. McEvoy,et al. Assessment centers and subordinate appraisals of managers: A seven-year examination of predictive validity. , 1989 .
[11] Richard E. Boyatzis,et al. The Competent Manager: A Model for Effective Performance , 1982 .
[12] Gary P. Latham,et al. Increasing productivity through performance appraisal , 1981 .
[13] Carl Michael Egan. An evaluation of the effectiveness of the Mankato State University Construction Management Program , 1989 .
[14] Stephen G. West,et al. Validity of self-evaluation of ability: A review and meta-analysis , 1982 .
[15] R. Albanese. Competency‐based Management Education , 1989 .