System reliability for a multi-state manufacturing network with joint buffer stations

Abstract This paper studies system reliability for a multi-state manufacturing network with multiple production lines (MSMN-MPL) considering joint buffer station. Joint buffer stations with finite volumes are set into the MSMN-MPL to temporally store blocked outputs from upstream workstations. The usage volume of each joint buffer station is therefore affected by the capacity states of workstations. An adjustment term, defined as the probability that all buffer stations are not blocked, is proposed to analyze volume usage and corresponding probability for joint buffer stations. The system reliability with finite buffer volume is evaluated accurately in terms of the adjustment term. In particular, the relationship between system reliabilities with infinite and finite buffer volumes can be formulated by multiplying the adjustment term. A practical case of footwear manufacturing system is utilized to demonstrate system reliability evaluation with both infinite and finite buffer volumes. The suggested production policy for the case is to produce 144 and 96 products by two production lines because this policy can result a higher reliability. Moreover, experimental results show that the system reliabilities with infinite and finite buffer volume are 87.190% and 83.099%, respectively. This indicates that the assumption of infinite buffer volume overestimates the system reliability in the footwear manufacturing system.

[1]  Deniz Türsel Eliiyi,et al.  The state of the art on buffer allocation problem: a comprehensive survey , 2014, J. Intell. Manuf..

[2]  Yi-Kuei Lin,et al.  Reliability Evaluation of a Hybrid Flow-Shop With Stochastic Capacity Within a Time Constraint , 2016, IEEE Transactions on Reliability.

[3]  Adil Baykasoğlu,et al.  A case-oriented approach to a lead/acid battery closed-loop supply chain network design under risk and uncertainty , 2015 .

[4]  M. Valipour Comparison of Surface Irrigation Simulation Models: Full Hydrodynamic, Zero Inertia, Kinematic Wave , 2012 .

[5]  Z. Kevin Weng,et al.  Risk-pooling over demand uncertainty in the presence of product modularity , 1999 .

[6]  Stanley B. Gershwin,et al.  Improvement of the evaluation of closed-loop production systems with unreliable machines and finite buffers , 2014, Comput. Ind. Eng..

[7]  Ping-Chen Chang,et al.  On quality improvement of a multistate production network with service level consideration , 2017 .

[8]  Hong-Zhong Huang,et al.  An efficient method for reliability evaluation of multistate networks given all minimal path vectors , 2007 .

[9]  Mohammad Valipour,et al.  Simulation of open- and closed-end border irrigation systems using SIRMOD , 2015 .

[10]  M. Valipour,et al.  Comparison of the ARMA, ARIMA, and the autoregressive artificial neural network models in forecasting the monthly inflow of Dez dam reservoir , 2013 .

[11]  Yael Perlman,et al.  Dynamic repair priority for a transfer line with a finite buffer , 2014 .

[12]  Wei-Chang Yeh,et al.  A Sequential Decomposition Method for Estimating Flow in a Multi-Commodity, Multistate Network , 2011, IEEE Transactions on Reliability.

[13]  Rakesh Nagi,et al.  A review of agile manufacturing systems , 2001 .

[14]  Lance Fiondella,et al.  Optimal redundancy allocation to maximize multi-state computer network reliability subject to correlated failures , 2017, Reliab. Eng. Syst. Saf..

[15]  Robert Pellerin,et al.  Joint assignment of buffer sizes and inspection points in unreliable transfer lines with scrapping of defective parts , 2013 .

[16]  Zhao Xiaobo,et al.  Analysis of a production system in a general configuration , 2001 .

[17]  Shin-Guang Chen Optimal double-resource assignment for a distributed multistate network , 2015 .

[18]  Yi-Kuei Lin,et al.  Two-commodity reliability evaluation of a stochastic-flow network with varying capacity weight in terms of minimal paths , 2009, Comput. Oper. Res..

[19]  Indra Gunawan,et al.  A value-driven approach for optimizing reliability-redundancy allocation problem in multi-state weighted k-out-of-n system , 2016 .

[20]  M. Valipour,et al.  Analysis of potential evapotranspiration using 11 modified temperature-based models , 2014 .

[21]  Jsen-Shung Lin,et al.  Reliability evaluation of capacitated-flow networks with budget constraints , 1998 .

[22]  Elsayed A. Elsayed,et al.  Reliability analysis of production systems with buffer storage , 1979 .

[23]  Armin Scholl,et al.  A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..

[24]  Yi-Kuei Lin,et al.  Reliability-based performance indicator for a manufacturing network with multiple production lines in parallel , 2013 .

[25]  Jeonghan Ko,et al.  Robust manufacturing line design with controlled moderate robustness in bottleneck buffer time to manage stochastic inter-task times , 2013 .

[26]  Mohammad Valipour,et al.  Sprinkle and Trickle Irrigation System Design Using Tapered Pipes for Pressure Loss Adjusting , 2012 .

[27]  Yi-Kuei Lin,et al.  System Performance and Reliability Modeling of a Stochastic-Flow Production Network: A Confidence-Based Approach , 2015, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[28]  D. R. Fulkerson,et al.  Flows in Networks. , 1964 .

[29]  William J. Stevenson,et al.  Operations Management , 2011 .

[30]  Wei-Chang Yeh,et al.  A simple minimal path method for estimating the weighted multi-commodity multistate unreliable networks reliability , 2008, Reliab. Eng. Syst. Saf..

[31]  Chin-Chia Jane,et al.  Evaluating cost and reliability integrated performance of stochastic logistics systems , 2012 .

[32]  Yi-Kuei Lin,et al.  A fuzzy-based assessment procedure for a clothing factory with waste-prevention consideration , 2015 .

[33]  Emad Roghanian,et al.  An optimization model for reverse logistics network under stochastic environment by using genetic algorithm , 2014 .

[34]  Yi-Kuei Lin,et al.  Reliability evaluation for a waste-reduction parallel-line manufacturing system , 2012 .

[35]  U. C. Gupta,et al.  Analysis of finite-buffer discrete-time batch-service queue with batch-size-dependent service , 2014, Comput. Ind. Eng..

[36]  Chin-Chia Jane,et al.  On reliability evaluation of a capacitated-flow network in terms of minimal pathsets , 1995, Networks.

[37]  Wei-Chang Yeh,et al.  Optimal Routing for Multi-Commodity in Multistate Flow Network with Time Constraints , 2013 .