Assessing the impact of RFIs in electrical and instrumentation engineering contracts
暂无分享,去创建一个
Peter E.D. Love | Jingyang Zhou | Jeong Tai Kim | Chun-pong Sing | P. Love | C. Sing | Jingyang Zhou
[1] Peter E.D. Love,et al. Rework in Civil Infrastructure Projects: Determination of Cost Predictors , 2010 .
[2] Sherif Ali Mohtady Mohamed,et al. INDICATORS OF DESIGN AND DOCUMENTATION DEFICIENCY , 1997 .
[3] Rajkumar Roy,et al. Design Rework Prediction in Concurrent Design Environment: Current Trends and Future Research Directions , 2009 .
[4] G. Susman,et al. An Assessment of the Scientific Merits of Action Research. , 1978 .
[5] Andi,et al. Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .
[6] Peter E.D. Love,et al. Documentation errors in instrumentation and electrical systems: Toward productivity improvement using System Information Modeling , 2013 .
[7] Peter E.D. Love,et al. Design Error Costs in Construction Projects , 2012 .
[8] Christoph H. Loch,et al. Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..
[9] Awad S. Hanna,et al. Request for Information: Benchmarks and Metrics for Major Highway Projects , 2012 .
[10] John F. McGeorge. DESIGN PRODUCTIVITY: A QUALITY PROBLEM , 1988 .
[11] P. Love,et al. Rework: a symptom of a dysfunctional supply-chain , 1999 .
[12] Richard L. Baskerville,et al. Distinguishing action research from participative case studies , 1997 .
[13] Viviane M. J. Robinson,et al. The Origins and Status of Action Research , 1984 .
[14] Peter E.D. Love,et al. Concurrent Engineering in the Construction Industry , 1997 .
[15] N. Denzin. The research act: A theoretical introduction to sociological methods , 1977 .
[16] Laura Smith,et al. Between idealism and reality: Meeting the challenges of participatory action research , 2010 .
[17] Steven J. Taylor. Introduction to qualitative research methods , 1975 .
[18] Paul A. Tilley. Lean Design Management: A New Paradigm for Managing the Design and Documentation Process to Improve Quality? , 2005 .
[19] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[20] Colin Robson,et al. Real World Research: A Resource for Social Scientists and Practitioner-Researchers , 1993 .
[21] P. Love,et al. Contract Documentation and the Incidence of Rework in Projects , 2005 .
[22] David J. Edwards,et al. Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework , 2008, IEEE Transactions on Engineering Management.
[23] M. Kumaraswamy. Conflicts, claims and disputes in construction , 1997 .
[24] Andrew S. Chang. Reasons for cost and schedule increase for engineering design projects , 2002 .
[25] R. M. Eastman. Engineering information release prior to final design freeze , 1980, IEEE Transactions on Engineering Management.
[26] J. Donalek,et al. An introduction to qualitative research methods. , 2004, Urologic nursing.
[27] Peter E. D. Love,et al. A system dynamics model for assessing the impacts of design errors in construction projects , 2013, Math. Comput. Model..
[28] Awad S. Hanna,et al. Best Practices from WisDOT Mega and ARRA Projects - Request for Information: Benchmarks and Metrics , 2012 .
[29] Marjan Sarshar,et al. Engineering, Construction and Architectural Management , 2000 .