Assessing the impact of RFIs in electrical and instrumentation engineering contracts

Using a case study, errors, omissions and information redundancy contained in the electrical and instrumentation (E&I) ‘As-built’ drawings for a Stacker Conveyor were examined. A total of 449 errors and omissions were identified within 42 documents. In addition, 231 cables and components appeared once among the 42 documents; 86 cables and components appeared twice and 12 cables and components appeared thrice. As a result of the errors, omissions and redundancy, requests for information (RFIs) were required. Retrospective analysis indicates that the indirect cost of raising the RFIs to the contractor was estimated to be approximately 9% of the cost of the E&I contract. To address the problems of errors, omissions and redundancy, it is suggested that there is a need to adopt an object orientated system information model (SIM) for E&I engineering design and documentation. It is demonstrated in the case study that the use of a SIM could bring significant improvements in productivity and reduce the cost of engineering design.

[1]  Peter E.D. Love,et al.  Rework in Civil Infrastructure Projects: Determination of Cost Predictors , 2010 .

[2]  Sherif Ali Mohtady Mohamed,et al.  INDICATORS OF DESIGN AND DOCUMENTATION DEFICIENCY , 1997 .

[3]  Rajkumar Roy,et al.  Design Rework Prediction in Concurrent Design Environment: Current Trends and Future Research Directions , 2009 .

[4]  G. Susman,et al.  An Assessment of the Scientific Merits of Action Research. , 1978 .

[5]  Andi,et al.  Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .

[6]  Peter E.D. Love,et al.  Documentation errors in instrumentation and electrical systems: Toward productivity improvement using System Information Modeling , 2013 .

[7]  Peter E.D. Love,et al.  Design Error Costs in Construction Projects , 2012 .

[8]  Christoph H. Loch,et al.  Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..

[9]  Awad S. Hanna,et al.  Request for Information: Benchmarks and Metrics for Major Highway Projects , 2012 .

[10]  John F. McGeorge DESIGN PRODUCTIVITY: A QUALITY PROBLEM , 1988 .

[11]  P. Love,et al.  Rework: a symptom of a dysfunctional supply-chain , 1999 .

[12]  Richard L. Baskerville,et al.  Distinguishing action research from participative case studies , 1997 .

[13]  Viviane M. J. Robinson,et al.  The Origins and Status of Action Research , 1984 .

[14]  Peter E.D. Love,et al.  Concurrent Engineering in the Construction Industry , 1997 .

[15]  N. Denzin The research act: A theoretical introduction to sociological methods , 1977 .

[16]  Laura Smith,et al.  Between idealism and reality: Meeting the challenges of participatory action research , 2010 .

[17]  Steven J. Taylor Introduction to qualitative research methods , 1975 .

[18]  Paul A. Tilley Lean Design Management: A New Paradigm for Managing the Design and Documentation Process to Improve Quality? , 2005 .

[19]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[20]  Colin Robson,et al.  Real World Research: A Resource for Social Scientists and Practitioner-Researchers , 1993 .

[21]  P. Love,et al.  Contract Documentation and the Incidence of Rework in Projects , 2005 .

[22]  David J. Edwards,et al.  Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework , 2008, IEEE Transactions on Engineering Management.

[23]  M. Kumaraswamy Conflicts, claims and disputes in construction , 1997 .

[24]  Andrew S. Chang Reasons for cost and schedule increase for engineering design projects , 2002 .

[25]  R. M. Eastman Engineering information release prior to final design freeze , 1980, IEEE Transactions on Engineering Management.

[26]  J. Donalek,et al.  An introduction to qualitative research methods. , 2004, Urologic nursing.

[27]  Peter E. D. Love,et al.  A system dynamics model for assessing the impacts of design errors in construction projects , 2013, Math. Comput. Model..

[28]  Awad S. Hanna,et al.  Best Practices from WisDOT Mega and ARRA Projects - Request for Information: Benchmarks and Metrics , 2012 .

[29]  Marjan Sarshar,et al.  Engineering, Construction and Architectural Management , 2000 .