Economic Process Control

A simple method is developed how to determine a nearly optimal economic sampling design tor current process control. A comparison between Shewhart and non Shewhart techniques reveals that under the assumptions of a normally distributed quality characteristic and an exponentially distributed time of production in the state of control the superiority of non Shewhart techniques is in general of no importance.