The Effects of Temporary Tower Cranes on the Construction Process and Seismic Behavior of Reinforced Concrete Buildings

When space is limited on project site to install a tower crane for the construction of high and mid-rise buildings, project managers have to deal with the challenge of assembling such crane somewhere in the middle of the building, leaving an opening in the floor slabs. Nevertheless, there is limited evidence about the effects of this type of temporary structure on the seismic behavior of buildings. The study analyzes the effect of having temporary openings in slabs of reinforced concrete buildings, when tower cranes need to be mounted inside a building. A structural intervention on the buildings’ slabs was simulated to resemble the temporary openings required to install a tower crane. Results indicated that seismic deformations were almost the same with and without the slab opening, which enables the installation of tower cranes through the slabs of reinforced concrete buildings, without affecting serviceability levels and seismic behavior of buildings.

[1]  Vitelmo V. Bertero,et al.  Earthquake Engineering: From Engineering Seismology To Performance-Based Engineering , 2020 .

[2]  Angelo D'Ambrisi,et al.  Use of Pushover Analysis for Predicting Seismic Response of Irregular Buildings: A Case Study , 2009 .

[3]  John W. Wallace,et al.  Collapse Assessment of the Alto Rio Building in the 2010 Chile Earthquake , 2015 .

[4]  Farzad Naeim,et al.  Performance of tall buildings in Concepción during the 27 February 2010 moment magnitude 8.8 offshore Maule, Chile earthquake , 2011 .

[5]  José E. Barradas Hernández,et al.  PROCEDIMIENTO DE DISEÑO SISMICO MULTINIVEL BASADO EN DESPLAZAMIENTO PARA ESTRUCTURAS A BASE DE MARCOS DE CONCRETO REFORZADO , 2014 .

[6]  Jack P. Moehle,et al.  Damage and Implications for Seismic Design of RC Structural Wall Buildings , 2012 .

[7]  T. Krauthammer,et al.  Dynamic response and behavior of reinforced concrete slabs under impact loading , 2007 .

[8]  Francisco Orozco,et al.  Study of structural capacity and serviceability affecting the obstruction of residential door , 2014 .

[9]  J. A. Inaudi,et al.  Response of Reinforced Concrete Buildings in Concepción during the Maule Earthquake , 2012 .

[10]  Mario De Stefano,et al.  A review of research on seismic behaviour of irregular building structures since 2002 , 2008 .

[11]  Khaled Mohamed Shawki,et al.  GA optimization model for solving tower crane location problem in construction sites , 2015 .

[12]  Zulay Giménez Palavicini,et al.  Diagnóstico de la gestión de la construcción e implementación de la constructabilidad en empresas de obras civiles , 2008 .

[13]  Eduardo Kausel,et al.  A statistical analysis of reinforced concrete wall buildings damaged during the 2010, Chile earthquake , 2015 .

[14]  Chi Ming Tam,et al.  Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming , 2011 .

[15]  Felipe Leyton,et al.  Reevaluación del peligro sísmico probabilístico en Chile central , 2010 .

[16]  A. Elnashai,et al.  Fundamentals of earthquake engineering , 2008 .

[17]  Ozge Karslioglu,et al.  Effects of infill walls on base responses and roof drift of reinforced concrete buildings under time‐history loading , 2011 .

[18]  Nader Panahshahi,et al.  Effect of openings on in-plane structural behavior of reinforced concrete floor slabs , 2016 .

[19]  Colin S. Gray,et al.  A systematic approach to the selection of an appropriate crane for a construction site , 1985 .

[20]  Katrin Beyer,et al.  Application of a recently proposed displacement-based assessment procedure for asymmetric-plan RC wall buildings , 2017 .

[21]  R. Park,et al.  Reinforced Concrete Slabs , 1981 .

[22]  Sangyong Kim,et al.  Sequential dependency structure matrix based framework for leveling of a tower crane lifting plan , 2018 .

[23]  Mohamed Abdel-Raheem,et al.  Single Tower Crane Allocation Using Ant Colony Optimization , 2017 .

[24]  Jochen Teizer,et al.  Status quo and open challenges in vision-based sensing and tracking of temporary resources on infrastructure construction sites , 2015, Adv. Eng. Informatics.

[25]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[26]  John W. Wallace,et al.  Behavior, design, and modeling of structural walls and coupling beams — Lessons from recent laboratory tests and earthquakes , 2012, International Journal of Concrete Structures and Materials.

[27]  Mauricio Loyola,et al.  Constructividad y Arquitectura , 2010 .

[28]  In Jae Shin,et al.  Factors That Affect Safety of Tower Crane Installation/Dismantling in Construction Industry , 2015, International Journal for Research in Applied Science and Engineering Technology.

[29]  Rodrigo Cienfuegos,et al.  Data collection after the 2010 Maule earthquake in Chile , 2017, Bulletin of Earthquake Engineering.

[30]  Ali Kocak,et al.  Estimation of the Fundamental Vibration Period of Existing RC Buildings in Turkey Utilizing Ambient Vibration Records , 2008 .

[31]  Adnan Enshassi,et al.  Trends in productivity improvement in construction projects in Palestine , 2013 .

[32]  José L. Almazán,et al.  Torsional balance of asymmetric structures by means of tuned mass dampers , 2012 .

[33]  Mohamed Marzouk,et al.  Tower cranes layout planning using agent-based simulation considering activity conflicts , 2018, Automation in Construction.

[34]  Geoffrey Qiping Shen,et al.  Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects , 2016 .

[35]  Mario De Stefano,et al.  The Effect of Common Irregularities on the Seismic Performance of Existing RC Framed Buildings , 2013 .

[36]  G. Housner AN HISTORICAL VIEW OF EARTHQUAKE ENGINEERING , 1984 .

[37]  Rui Pinho,et al.  PERIOD-HEIGHT RELATIONSHIP FOR EXISTING EUROPEAN REINFORCED CONCRETE BUILDINGS , 2004 .

[38]  Cosmin Popescu,et al.  Tests on reinforced concrete slabs with cut-out openings strengthened with fibre-reinforced polymers , 2014 .

[39]  Dimitrios Vamvatsikos,et al.  Yield Frequency Spectra and seismic design of code-compatible RC structures: an illustrative example , 2017 .

[40]  Bowen Wu,et al.  VERTICAL DELIVERY CHALLENGES FOR HIGH-RISE BUILDING CONSTRUCTION , 2015 .

[42]  Mohamed Marzouk,et al.  Decision support for tower crane selection with building information models and genetic algorithms , 2016 .

[43]  G. Montalva,et al.  Site Effects and Building Damage Characterization in Concepción after the Mw 8.8 Maule Earthquake , 2016 .