The Effects of Temporary Tower Cranes on the Construction Process and Seismic Behavior of Reinforced Concrete Buildings
暂无分享,去创建一个
Eric Forcael | Alexander Opazo | Carlos Rodríguez | Guillermo Young | Arnaldo Bayona | A. Opazo | C. Rodriguez | E. Forcael | Guillermo Young | Arnaldo Bayona
[1] Vitelmo V. Bertero,et al. Earthquake Engineering: From Engineering Seismology To Performance-Based Engineering , 2020 .
[2] Angelo D'Ambrisi,et al. Use of Pushover Analysis for Predicting Seismic Response of Irregular Buildings: A Case Study , 2009 .
[3] John W. Wallace,et al. Collapse Assessment of the Alto Rio Building in the 2010 Chile Earthquake , 2015 .
[4] Farzad Naeim,et al. Performance of tall buildings in Concepción during the 27 February 2010 moment magnitude 8.8 offshore Maule, Chile earthquake , 2011 .
[5] José E. Barradas Hernández,et al. PROCEDIMIENTO DE DISEÑO SISMICO MULTINIVEL BASADO EN DESPLAZAMIENTO PARA ESTRUCTURAS A BASE DE MARCOS DE CONCRETO REFORZADO , 2014 .
[6] Jack P. Moehle,et al. Damage and Implications for Seismic Design of RC Structural Wall Buildings , 2012 .
[7] T. Krauthammer,et al. Dynamic response and behavior of reinforced concrete slabs under impact loading , 2007 .
[8] Francisco Orozco,et al. Study of structural capacity and serviceability affecting the obstruction of residential door , 2014 .
[9] J. A. Inaudi,et al. Response of Reinforced Concrete Buildings in Concepción during the Maule Earthquake , 2012 .
[10] Mario De Stefano,et al. A review of research on seismic behaviour of irregular building structures since 2002 , 2008 .
[11] Khaled Mohamed Shawki,et al. GA optimization model for solving tower crane location problem in construction sites , 2015 .
[12] Zulay Giménez Palavicini,et al. Diagnóstico de la gestión de la construcción e implementación de la constructabilidad en empresas de obras civiles , 2008 .
[13] Eduardo Kausel,et al. A statistical analysis of reinforced concrete wall buildings damaged during the 2010, Chile earthquake , 2015 .
[14] Chi Ming Tam,et al. Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming , 2011 .
[15] Felipe Leyton,et al. Reevaluación del peligro sísmico probabilístico en Chile central , 2010 .
[16] A. Elnashai,et al. Fundamentals of earthquake engineering , 2008 .
[17] Ozge Karslioglu,et al. Effects of infill walls on base responses and roof drift of reinforced concrete buildings under time‐history loading , 2011 .
[18] Nader Panahshahi,et al. Effect of openings on in-plane structural behavior of reinforced concrete floor slabs , 2016 .
[19] Colin S. Gray,et al. A systematic approach to the selection of an appropriate crane for a construction site , 1985 .
[20] Katrin Beyer,et al. Application of a recently proposed displacement-based assessment procedure for asymmetric-plan RC wall buildings , 2017 .
[21] R. Park,et al. Reinforced Concrete Slabs , 1981 .
[22] Sangyong Kim,et al. Sequential dependency structure matrix based framework for leveling of a tower crane lifting plan , 2018 .
[23] Mohamed Abdel-Raheem,et al. Single Tower Crane Allocation Using Ant Colony Optimization , 2017 .
[24] Jochen Teizer,et al. Status quo and open challenges in vision-based sensing and tracking of temporary resources on infrastructure construction sites , 2015, Adv. Eng. Informatics.
[25] Stephen O. Ogunlana,et al. Problems causing delays in major construction projects in Thailand , 2008 .
[26] John W. Wallace,et al. Behavior, design, and modeling of structural walls and coupling beams — Lessons from recent laboratory tests and earthquakes , 2012, International Journal of Concrete Structures and Materials.
[27] Mauricio Loyola,et al. Constructividad y Arquitectura , 2010 .
[28] In Jae Shin,et al. Factors That Affect Safety of Tower Crane Installation/Dismantling in Construction Industry , 2015, International Journal for Research in Applied Science and Engineering Technology.
[29] Rodrigo Cienfuegos,et al. Data collection after the 2010 Maule earthquake in Chile , 2017, Bulletin of Earthquake Engineering.
[30] Ali Kocak,et al. Estimation of the Fundamental Vibration Period of Existing RC Buildings in Turkey Utilizing Ambient Vibration Records , 2008 .
[31] Adnan Enshassi,et al. Trends in productivity improvement in construction projects in Palestine , 2013 .
[32] José L. Almazán,et al. Torsional balance of asymmetric structures by means of tuned mass dampers , 2012 .
[33] Mohamed Marzouk,et al. Tower cranes layout planning using agent-based simulation considering activity conflicts , 2018, Automation in Construction.
[34] Geoffrey Qiping Shen,et al. Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects , 2016 .
[35] Mario De Stefano,et al. The Effect of Common Irregularities on the Seismic Performance of Existing RC Framed Buildings , 2013 .
[36] G. Housner. AN HISTORICAL VIEW OF EARTHQUAKE ENGINEERING , 1984 .
[37] Rui Pinho,et al. PERIOD-HEIGHT RELATIONSHIP FOR EXISTING EUROPEAN REINFORCED CONCRETE BUILDINGS , 2004 .
[38] Cosmin Popescu,et al. Tests on reinforced concrete slabs with cut-out openings strengthened with fibre-reinforced polymers , 2014 .
[39] Dimitrios Vamvatsikos,et al. Yield Frequency Spectra and seismic design of code-compatible RC structures: an illustrative example , 2017 .
[40] Bowen Wu,et al. VERTICAL DELIVERY CHALLENGES FOR HIGH-RISE BUILDING CONSTRUCTION , 2015 .
[42] Mohamed Marzouk,et al. Decision support for tower crane selection with building information models and genetic algorithms , 2016 .
[43] G. Montalva,et al. Site Effects and Building Damage Characterization in Concepción after the Mw 8.8 Maule Earthquake , 2016 .