A note on a model for quay crane scheduling with non-crossing constraints
暂无分享,去创建一个
Alberto Santini | Stefan Ropke | Henrik Alsing Friberg | Henrik A. Friberg | S. Røpke | Alberto Santini
[1] Lixin Miao,et al. Quay crane scheduling with non-interference constraints in port container terminals , 2008 .
[2] Alberto Delgado,et al. Fast Generation of Near-Optimal Plans for Eco-Efficient Stowage of Large Container Vessels , 2011, ICCL.
[3] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[4] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[5] Stefan Voß,et al. Container terminal operation and operations research - a classification and literature review , 2004, OR Spectr..
[6] Der-Horng Lee,et al. An improved approach for quay crane scheduling with non-crossing constraints , 2010 .