Testing an AHP model for aircraft spare parts

Abstract This research aims to develop and test a practical and precise multi-criteria classification of aircraft spare part inventory management, using the Analytical Hierarchy Process (AHP), in order to maintain aircraft operational availability and to reduce unnecessary downtime. In this study, a multi-criteria model is developed within a large-scale aircraft maintenance and repair firm in Indonesia. Spare parts data were extracted from the inventory system and analysed to triangulate the model outcome, demonstrate its validity and compare the results against the mathematical results generated by the system’s algorithm. The findings suggest that AHP can lead to a transparent, rapid and systematic classification model, this is highly accurate and precise with an outcome comparable to traditional methods. The conclusion proposes that the AHP classification model is more effective and transparent than the currently available mathematical methods. This research contributes to the development of the multi-criteria inventory classification literature in the context of the aviation industry.

[1]  Ruhul A. Sarker,et al.  Optimization of maintenance and spare provisioning policy using simulation , 2000 .

[2]  Dirk Cattrysse,et al.  Multi-item spare parts systems with lateral transshipments and waiting time constraints , 2006, Eur. J. Oper. Res..

[3]  Liliane Pintelon,et al.  Criticality classification of spare parts: A case study , 2012 .

[4]  Massimiliano M. Schiraldi,et al.  A logistics provider evaluation and selection methodology based on AHP, DEA and linear programming integration , 2011 .

[5]  Frank H. King,et al.  Aviation Maintenance Management , 1985 .

[6]  Prasanta Kumar Dey,et al.  Strategic sourcing in the UK bioenergy industry , 2013 .

[7]  D. Clay Whybark,et al.  Implementing multiple criteria ABC analysis , 1989 .

[8]  aircraftmaintenance AIRCRAFT MAINTENANCE PLANNING , 2016 .

[9]  Juuso Töyli,et al.  Cooperative strategies for the availability service of repairable aircraft components , 2009 .

[10]  María Carmen Carnero,et al.  Selection of a Computerised Maintenance Management System: a case study in a regional health service , 2011 .

[11]  Ludo Gelders,et al.  A swift response framework for measuring the strategic fit for a horizontal collaborative initiative , 2009 .

[12]  Peng Zhou,et al.  A note on multi-criteria ABC inventory classification using weighted linear optimization , 2007, Eur. J. Oper. Res..

[13]  Mandyam M. Srinivasan Lean Maintenance Repair and Overhaul , 2014 .

[14]  J. Stoll,et al.  Criticality analysis of spare parts management: a multi-criteria classification regarding a cross-plant central warehouse strategy , 2015, Prod. Eng..

[15]  Luca Fumagalli,et al.  A review of multi-criteria classification of spare parts : From literature analysis to industrial evidences , 2014 .

[16]  Sushil Kumar,et al.  Analytic hierarchy process: An overview of applications , 2006, Eur. J. Oper. Res..

[17]  H. Haapasalo,et al.  Productisation: A review and research agenda , 2015 .

[18]  Hongfu Zuo,et al.  Multi-echelon inventory optimal model of civil aircraft spare parts , 2010, 2010 Chinese Control and Decision Conference.

[19]  Darli Rodrigues Vieira,et al.  Maintenance, Repair and Overhaul (MRO) Fundamentals and Strategies: An Aeronautical Industry Overview , 2016 .

[20]  T. Rad,et al.  Classification of critical spares for aircraft maintenance , 2011, ICSSSM11.

[21]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[22]  Murugan Anandarajan,et al.  Classifying inventory using an artificial neural network approach , 2002 .

[23]  Karen B. Marais,et al.  Analysis of trends in aviation maintenance risk: An empirical approach , 2012, Reliab. Eng. Syst. Saf..

[24]  Rob J. I. Basten,et al.  Pooling of spare parts between multiple users: How to share the benefits? , 2014, Eur. J. Oper. Res..

[25]  Janne Huiskonen,et al.  Maintenance spare parts logistics: Special characteristics and strategic choices , 2001 .

[26]  Murat Erkoc,et al.  Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacity , 2016, Comput. Ind. Eng..

[27]  A. Bacchetti,et al.  Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice , 2012 .

[28]  Ramakrishnan Ramanathan,et al.  ABC inventory classification with multiple-criteria using weighted linear optimization , 2006, Comput. Oper. Res..

[29]  N. King Doing Template Analysis , 2012 .

[30]  Mauro Gamberi,et al.  An innovative method to optimize the maintenance policies in an aircraft: General framework and case study , 2015 .

[31]  Robert de Souza,et al.  A proposed framework for managing service parts in automotive and aerospace industries , 2011 .

[32]  Detlof von Winterfeldt,et al.  Structuring decision problems: A case study and reflections for practitioners , 2009, Eur. J. Oper. Res..

[33]  Marcello Braglia,et al.  Multi‐attribute classification method for spare parts inventory management , 2004 .

[34]  MORRIS A. COHEN,et al.  Service parts logistics: a benchmark analysis , 1997 .

[35]  Roland W. Scholz,et al.  Linking stakeholder visions with resource allocation scenarios and multi-criteria assessment , 2012, Eur. J. Oper. Res..

[36]  Tim Baines,et al.  State-of-the-art of ‘Lean’ in the aviation maintenance, repair, and overhaul industry , 2011 .

[37]  Rita Gamberini,et al.  New AHP-based approaches for multi-criteria inventory classification , 2014 .

[38]  W. J. Kennedy,et al.  An overview of recent literature on spare parts inventories , 2002 .

[39]  David Bamford,et al.  Development, test and comparison of two Multiple Criteria Decision Analysis (MCDA) models: A case of healthcare infrastructure location , 2015, Expert Syst. Appl..

[40]  S. Rahman,et al.  An investigation into critical service determinants of customer to business (C2B) type product returns in retail firms , 2016 .

[41]  Premaratne Samaranayake,et al.  Aircraft maintenance planning and scheduling : an integrated framework , 2012 .

[42]  Darli Rodrigues,et al.  Maintenance, Repair and Overhaul (MRO) Fundamentals and Strategies: An Aeronautical Industry Overview , 2016 .

[43]  Jani Kilpi,et al.  Pooling of spare components between airlines , 2004 .

[44]  Wan Lung Ng,et al.  Production , Manufacturing and Logistics A simple classifier for multiple criteria ABC analysis , 2006 .

[45]  R. Dekker,et al.  A spare parts stocking policy based on equipment criticality , 1998 .

[46]  John A. Muckstadt,et al.  Analysis and Algorithms for Service Parts Supply Chains , 2008 .

[47]  M. Z. Babai,et al.  ABC inventory classification : service levels and inventory costs , 2009 .

[48]  Massoud Bazargan,et al.  An optimization approach to aircraft dispatching strategy with maintenance cost – A case study , 2015 .

[49]  Philip E. T. Lewis,et al.  Research Methods for Business Students , 2006 .

[50]  J. Winch,et al.  Supply Chain Management: Strategy, Planning, and Operation , 2003 .

[51]  Kevin W. Li,et al.  Efficient aircraft spare parts inventory management under demand uncertainty , 2015 .

[52]  Marco Macchi,et al.  A decision-making framework for managing maintenance spare parts , 2008 .

[53]  Bob Huisman,et al.  Maintenance spare parts planning and control: a framework for control and agenda for future research , 2014 .

[54]  A case study into the management of racial diversity within an NHS teaching hospital , 2007 .

[55]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[56]  Shuai Yue,et al.  An inventory pooling model for spare units of critical systems that serve multi-companies , 2015 .

[57]  Nicola Saccani,et al.  Managing the after-sales logistic network–a simulation study , 2009 .

[58]  Adil Baykasoglu,et al.  A new fuzzy linear assignment method for multi-attribute decision making with an application to spare parts inventory classification , 2016, Appl. Soft Comput..

[59]  Efraim Turban,et al.  Decision Support and Business Intelligence Systems (8th Edition) , 2006 .

[60]  Ozan Çakir,et al.  A web-based decision support system for multi-criteria inventory classification using fuzzy AHP methodology , 2008, Expert Syst. Appl..

[61]  P. Duchessi,et al.  A Conceptual Approach for Managing of Spare Parts , 1988 .

[62]  Robert M.H. Knotts,et al.  Civil aircraft maintenance and support Fault diagnosis from a business perspective , 1999 .

[63]  Chandrasekharan Rajendran,et al.  Criticality analysis of spare parts using the analytic hierarchy process , 1994 .

[64]  Jafar Rezaei,et al.  A rule-based multi-criteria approach to inventory classification , 2010 .

[65]  Tim Baines,et al.  Towards the strategic adoption of Lean in aviation Maintenance Repair and Overhaul (MRO) industry: an empirical study into the industry's Lean status , 2016 .

[66]  M. Z. Babai,et al.  Demand categorisation in a European spare parts logistics network , 2009 .

[67]  Jonathan Burton,et al.  Using the Analytic Hierarchy Process for ABC Analysis , 1993 .

[68]  Christopher A. Voss,et al.  Case research in operations management , 2002 .

[69]  Jati K. Sengupta,et al.  Decision Analysis for Management , 1985 .

[70]  Mohamed Mohamed Naim,et al.  An outsourcing decision model for airlines' MRO activities , 2007 .

[71]  Abdollah Hadi-Vencheh,et al.  A fuzzy AHP-DEA approach for multiple criteria ABC inventory classification , 2011, Expert Syst. Appl..

[72]  Thomas L. Saaty,et al.  DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .

[73]  Zakkula Govindarajulu,et al.  Decision Analysis for Management Judgement. , 1993 .

[74]  Nachiappan Subramanian,et al.  A review of applications of Analytic Hierarchy Process in operations management , 2012 .