트램 운행을 위한 차상장치와 관제실간 인터페이스 시험항목 개발

Korea’s first wireless tram is on the practical steps now and the test line is under construction at Osong depot. After the test line is finished, system function test should be carried out and it should be verified if the system operates safely and correctly to ensure the safety of Tram operation through tests for each items of equipment. Therefore each item of tests is needed to be defined. This study examines test items required for the interface test between On-board system and Control center and defines test items for Tram operation.