Assessing the transient impact of lot sizing rules following MRP implementation
暂无分享,去创建一个
[1] Gwilym M. Jenkins,et al. Time series analysis, forecasting and control , 1972 .
[2] Joseph Randall Biggs. An analysis of heuristic lot sizing and sequencing rules on the performance of a hierarchical multiproduct, multistage production-inventory system utilizing material requirements planning techniques , 1975 .
[3] J. DeMatteisJ.. An economic lot-sizing technique , 1968 .
[4] H. Albert Napier,et al. Optimal Multi-Level Lot Sizing for Requirements Planning Systems , 1980 .
[5] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[6] Oliver W. Wight,et al. Production and inventory management in the computer age , 1974 .
[7] John J. DeMatteis. An Economic Lot-Sizing Technique I: The Part-Period Algorithm , 1968, IBM Syst. J..
[8] George E. P. Box,et al. Intervention Analysis with Applications to Economic and Environmental Problems , 1975 .
[9] D. Collier. A comparison of MRP lot sizing methods considering capacity change costs , 1980 .
[10] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[11] Stephen F. Love. A Facilities in Series Inventory Model with Nested Schedules , 1972 .
[12] Joseph R. Biggs. HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .
[13] Alan J. Mayne,et al. Introduction to Simulation and SLAM , 1979 .
[14] M. H. Wagner,et al. Dynamic Lot Size Models for Multi-Stage Assembly Systems , 1973 .
[15] Joseph D. Blackburn,et al. Improved heuristics for multistage requirements planning systems , 1982 .