Reserve Requirements to Efficiently Manage Intra-Zonal Congestion

The security-constrained unit commitment problem schedules power generators to minimize cost subject to operating constraints. Reserve requirements ensure that reserve is available to re-balance the system following a contingency but do not guarantee reliability in congested systems where reserve activation is limited by transmission constraints. Operators improve reserve deliverability by limiting power flows and controlling the location of reserves. Zones are used to address inter-zonal congestion but operators lack efficient ways to handle intra-zonal congestion. We propose dynamically relating minimum reserve levels to transmission stress in a computationally efficient approach that complements existing reserve models from the literature. Analysis on the IEEE RTS 96 test case demonstrates the approach can mitigate intra-zonal congestion more economically than traditional reserve policies.

[1]  Hui Wu,et al.  Optimal scheduling of spinning reserve with ramp constraints , 1999, IEEE Power Engineering Society. 1999 Winter Meeting (Cat. No.99CH36233).

[2]  Z. Alaywan,et al.  Transitioning the California market from a zonal to a nodal framework: an operational perspective , 2004, IEEE PES Power Systems Conference and Exposition, 2004..

[3]  Tongxin Zheng,et al.  Contingency-Based Zonal Reserve Modeling and Pricing in a Co-Optimized Energy and Reserve Market , 2008, IEEE Transactions on Power Systems.

[4]  François Bouffard,et al.  Scheduling and Pricing of Coupled Energy and Primary, Secondary, and Tertiary Reserves , 2005, Proceedings of the IEEE.

[5]  B. Fox,et al.  Power system economic loading with flexible emergency reserve provision , 1991 .

[6]  A. Conejo,et al.  Network-Constrained Multiperiod Auction for a Pool-Based Electricity Market , 2002, IEEE Power Engineering Review.

[7]  Shmuel S. Oren,et al.  Price-based adaptive spinning reserve requirements in power system scheduling 1 The authors remain solely responsible for the errors in this paper. This paper does not represent the views of PG&E or its members. 1 , 1999 .

[8]  M. Ortega-Vazquez,et al.  Optimizing the Spinning Reserve Requirements Using a Cost/Benefit Analysis , 2007, IEEE Transactions on Power Systems.

[9]  A. Conejo,et al.  Market-clearing with stochastic security-part I: formulation , 2005, IEEE Transactions on Power Systems.

[10]  H. Daneshi,et al.  ERCOT electricity market: Transition from zonal to nodal market operation , 2011, 2011 IEEE Power and Energy Society General Meeting.

[11]  J. Arroyo,et al.  Energy and reserve pricing in security and network-constrained electricity markets , 2005, IEEE Transactions on Power Systems.

[12]  Mark O'Malley,et al.  A new methodology for the provision of reserve in an isolated power system , 1999 .

[13]  Ross Baldick,et al.  Unit commitment with probabilistic reserve , 2002, 2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309).

[14]  Michael Ferris,et al.  Co-optimization of generation unit commitment and transmission switching with N-1 reliability , 2010, IEEE PES General Meeting.

[15]  B. Venkatesh,et al.  A probabilistic reserve market incorporating interruptible load , 2006, IEEE Transactions on Power Systems.

[16]  Constantine Caramanis,et al.  Theory and Applications of Robust Optimization , 2010, SIAM Rev..

[17]  M. Shahidehpour,et al.  Unit Commitment With Probabilistic Spinning Reserve and Interruptible Load Considerations , 2009, IEEE Transactions on Power Systems.

[18]  M. O'Malley,et al.  Reliability and Reserve in Competitive Electricity Market Scheduling , 2001, IEEE Power Engineering Review.

[19]  M. Shahidehpour,et al.  Stochastic Security-Constrained Unit Commitment , 2007, IEEE Transactions on Power Systems.

[20]  J. M. Arroyo,et al.  Contingency-Constrained Unit Commitment With $n - K$ Security Criterion: A Robust Optimization Approach , 2011, IEEE Transactions on Power Systems.

[21]  M. Abedi,et al.  Differential Evolution Algorithm for Security-Constrained Energy and Reserve Optimization Considering Credible Contingencies , 2011, IEEE Transactions on Power Systems.

[22]  Fengyu Wang,et al.  Reserve zone determination based on statistical clustering methods , 2012, 2012 North American Power Symposium (NAPS).

[23]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .

[24]  L. Bertling,et al.  Probabilistic security assessment for power system operations , 2004, IEEE Power Engineering Society General Meeting, 2004..

[25]  Yongpei Guan,et al.  Two-stage robust optimization for N-k contingency-constrained unit commitment , 2012, IEEE Transactions on Power Systems.

[26]  R. Sioshansi,et al.  Economic Consequences of Alternative Solution Methods for Centralized Unit Commitment in Day-Ahead Electricity Markets , 2008, IEEE Transactions on Power Systems.

[27]  D. Kirschen,et al.  Optimal scheduling of spinning reserve , 1999 .

[28]  G. Gross,et al.  Role of distribution factors in congestion revenue rights applications , 2004, IEEE Transactions on Power Systems.

[29]  Tao Li,et al.  Cost of Reliability Analysis Based on Stochastic Unit Commitment , 2008, IEEE Transactions on Power Systems.

[30]  J.D. McCalley,et al.  Power System Risk Assessment and Control in a Multiobjective Framework , 2009, IEEE Transactions on Power Systems.

[31]  K. W. Edwin,et al.  Integer Programming Approach to the Problem of Optimal Unit Commitment with Probabilistic Reserve Determination , 1978, IEEE Transactions on Power Apparatus and Systems.

[32]  L. Törnqvist,et al.  How Should Relative Changes be Measured , 1985 .

[33]  Peter B. Luh,et al.  Power system scheduling with fuzzy reserve requirements , 1996 .

[34]  L. M. Xia,et al.  A probabilistic reserve with zero-sum settlement scheme , 2005 .