Periodic replacement policies with shortage and excess costs

It has been proposed that if replacement time is planned too early prior to failure, a waste of operation cost, i.e., excess costs, would incur because the system might run for an additional period of time to complete critical operations, and if replacement time is too late after failure, a great failure cost, i.e., shortage cost, is incurred due to the delay in time of the carelessly scheduled replacement. In order to make the preventive replacement policies perform in a more general way, the above two variable types of costs are taken into considerations for periodic replacement policies in this paper. We firstly take up a standard model in which the unit is replaced preventively at periodic times. Secondly, the modeling approaches of whichever occurs first and last are applied into periodic and random models, and replacement first and last policies are discussed to find optimum periodic replacement times for a random working time. Furthermore, optimum working numbers are obtained for the extended models. We give analytical discussions of the above replacement policies, and finally, numerical examples are illustrated.

[1]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[2]  Toshio Nakagawa,et al.  Age replacement models: A summary with new perspectives and methods , 2017, Reliab. Eng. Syst. Saf..

[3]  Toshio Nakagawa Random Maintenance Policies , 2014 .

[4]  Yu-Hung Chien,et al.  Optimal periodic replacement policy for a GPP repairable product under the free-repair warranty , 2019 .

[5]  Toshio Nakagawa,et al.  Advanced Maintenance Policies for Shock and Damage Models , 2017 .

[6]  A. Blanc,et al.  Total Productive Maintenance , 1993, International Symposium on Semiconductor Manufacturing.

[7]  Hamid Reza Golmakani,et al.  Periodic inspection optimization model for a two-component repairable system with failure interaction , 2012, Comput. Ind. Eng..

[8]  Toshio Nakagawa,et al.  Replacement policies with general models , 2019, Ann. Oper. Res..

[9]  Toshio Nakagawa,et al.  Maintenance Overtime Policies in Reliability Theory , 2015 .

[10]  Dong Ho Park,et al.  Optimal maintenance level for second-hand product with periodic inspection schedule , 2015 .

[11]  Toshio Nakagawa,et al.  Replacement policies for a parallel system with shortage and excess costs , 2013, Reliab. Eng. Syst. Saf..

[12]  Yen-Luan Chen Optimal scheduling replacement policies for a system with multiple random works , 2019 .

[13]  Toshio Nakagawa,et al.  OPTIMAL AGE REPLACEMENT AND INSPECTION POLICIES WITH RANDOM FAILURE AND REPLACEMENT TIMES , 2011 .

[14]  Minjae Park,et al.  Cost models for age replacement policies and block replacement policies under warranty , 2016 .

[15]  Nizar Mannai,et al.  Optimal design of k-out-of-n system under first and last replacement in reliability theory , 2020, Oper. Res..

[16]  Toshio Nakagawa,et al.  Optimization problems of replacement first or last in reliability theory , 2012, Eur. J. Oper. Res..

[17]  Toshio Nakagawa Advanced Reliability Models and Maintenance Policies , 2008 .

[18]  Shey-Huei Sheu,et al.  The generalized age maintenance policies with random working times , 2018, Reliab. Eng. Syst. Saf..

[19]  Toshio Nakagawa,et al.  Where does "whichever occurs first" hold for preventive maintenance modelings? , 2015, Reliab. Eng. Syst. Saf..

[20]  Toshio Nakagawa,et al.  First and Last Triggering Event Approaches for Replacement With Minimal Repairs , 2016, IEEE Transactions on Reliability.

[21]  Mingchih Chen,et al.  A Failure-rate-reduction Periodic Preventive Maintenance Model with Delayed Initial Time in a Finite Time Period , 2014 .

[22]  Toshio Nakagawa,et al.  Replacement policies for age and working numbers with random life cycle , 2017 .

[23]  Toshio Nakagawa,et al.  Comparisons of replacement policies with periodic times and repair numbers , 2017, Reliab. Eng. Syst. Saf..

[24]  Ferenc Szidarovszky,et al.  New one cycle criteria for optimizing preventive replacement policies , 2016, Reliab. Eng. Syst. Saf..

[25]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[26]  Chin-Chih Chang,et al.  Optimization of continuous and discrete scheduled times for a cumulative damage system with age-dependent maintenance , 2018, Communications in Statistics - Theory and Methods.

[27]  Shey-Huei Sheu,et al.  Extended optimal preventive replacement policies with random working cycle , 2019, Reliab. Eng. Syst. Saf..

[28]  T. Dohi,et al.  Moment-based approach for some age-based replacement problems , 2017 .

[29]  Joachim Arts,et al.  Design of multi-component periodic maintenance programs with single-component models , 2018 .