A Bayesian approach to demand forecasting for new equipment programs

Abstract Demand forecasting is a fundamental component in a range of industrial problems (e.g., inventory management, equipment maintenance). Forecasts are crucial to accurately estimating spare or replacement part demand to determine inventory stock levels. Estimating demand becomes challenging when parts experience intermittent demand/failures versus demand at more regular intervals or high quantities. In this paper, we develop a demand forecasting approach that utilizes Bayes’ rule to improve the forecast accuracy of parts from new equipment programs where established demand patterns have not had sufficient time to develop. In these instances, the best information available tends to be “engineering estimates” based on like /similar parts or engineering projections. A case study is performed to validate the forecasting methodology. The validation compared the performance of the proposed Bayesian method and traditional forecasting methods for both forecast accuracy and overall inventory fill rate performance. The analysis showed that for specific situations the Bayesian-based forecasting approach more accurately predicts part demand, impacting part availability (fill rate) and inventory cost. This improved forecasting ability will enable managers to make better inventory investment decisions for new equipment programs.

[1]  Federico Adrodegari,et al.  Spare parts inventory management. A literature review and directions for future research , 2011 .

[2]  J. D. Croston Forecasting and Stock Control for Intermittent Demands , 1972 .

[3]  Paul Goodwin,et al.  Integrating management judgment and statistical methods to improve short-term forecasts , 2002 .

[4]  William Remus,et al.  Neural Network Models for Time Series Forecasts , 1996 .

[5]  Steven E. Saylor,et al.  Advanced logistics analysis capabilities environment , 2010, Proceedings of the 2010 Winter Simulation Conference.

[6]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .

[7]  A. Bacchetti,et al.  Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice , 2012 .

[8]  H. Scarf Bayes Solutions of the Statistical Inventory Problem , 1959 .

[9]  Rommert Dekker,et al.  Inventory control of spare parts using a Bayesian approach: A case study , 1999, Eur. J. Oper. Res..

[10]  T. Willemain,et al.  A new approach to forecasting intermittent demand for service parts inventories , 2004 .

[11]  Robert D. Klassen,et al.  Forecasting practices of Canadian firms: Survey results and comparisons , 2001 .

[12]  Stephen M. Disney,et al.  Forecasting for inventory planning: a 50-year review , 2009, J. Oper. Res. Soc..

[13]  Stephan M. Wagner,et al.  A case study-based analysis of spare parts management in the engineering industry , 2008 .

[14]  Bhaba R. Sarker,et al.  A Bayesian approach to forecast intermittent demand for seasonal products , 2012 .