Sustainability in the supply chain through synchronization of demand and supply in ETO-companies
暂无分享,去创建一个
[1] Erwin Rauch,et al. Increasing productivity in ETO construction projects through a lean methodology for demand predictability , 2015, 2015 International Conference on Industrial Engineering and Operations Management (IEOM).
[2] Daisuke Hirotani,et al. Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains , 2005 .
[3] D. T. Matt,et al. Adaptation of the value stream mapping approach to the design of lean engineer-to-order production systems: A case study , 2014 .
[4] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[5] Theopisti C. Papadopoulou,et al. Application of lean scheduling and production control in non-repetitive manufacturing systems using intelligent agent decision support , 2013 .
[6] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[7] Boaz Golany,et al. Managing multi-project environments through constant work-in-process , 2003 .
[8] Mary Kathryn Thompson,et al. Proceedings of the 2nd International Workshop on Design in Civil and Environmental Engineering , 2013 .
[9] Taiichi Ohno,et al. Toyota Production System : Beyond Large-Scale Production , 1988 .