Truck routing and scheduling for cross-docking in the supply chain: model and solution method

Among various distribution networks, the idea behind the cross-docking for cost reduction is to decrease/eliminate inventory to the extent possible. In classical cross-dock, it is assumed that there is one truck for each supplier and customer. Yet, one truck for each supplier and customer can be very costly and consequently ineffective. Each truck likely can serve more than one supplier/customer in its pickup/delivery process. Therefore, to more actualize the cross-dock problem, it can be extended with the truck routing problem, i . e ., the truck scheduling in the cross-docking system and truck routing in the pickup/delivery process. Hence, this paper considers the integrated truck routing and scheduling problem. First, the problem is formulated as a mixed integer linear programming model. Using this model, we solve small-sized instances to optimality. Moreover, two metaheuristics, a reactive tabu search with path relinking and a generational genetic algorithm with a local search and restart phase, are proposed to solve large instances. The parameters of the proposed algorithms are tuned. Finally, the performance of the proposed algorithms is evaluated.

[1]  Seyed Jafar Sadjadi,et al.  Scheduling Trucks In Cross-Docking Systems: A Robust Meta-Heuristics Approach , 2010 .

[2]  Mostafa Zandieh,et al.  Scheduling the truck holdover recurrent dock cross-dock problem using robust meta-heuristics , 2010 .

[3]  Rajesh Piplani,et al.  Vehicle scheduling and routing at a cross docking center for food supply chains , 2014 .

[4]  John W. Fowler,et al.  Crossdocking— Just in Time scheduling: an alternative solution approach , 2009, J. Oper. Res. Soc..

[5]  F. Glover HEURISTICS FOR INTEGER PROGRAMMING USING SURROGATE CONSTRAINTS , 1977 .

[6]  Mostafa Zandieh,et al.  Scheduling trucks in cross-docking systems: Robust meta-heuristics , 2010, Comput. Ind. Eng..

[7]  Mostafa Zandieh,et al.  An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems , 2010 .

[8]  Madjid Tavana,et al.  A novel multi-objective meta-heuristic model for solving cross-docking scheduling problems , 2015, Appl. Soft Comput..

[9]  Nils Boysen,et al.  Truck scheduling at zero-inventory cross docking terminals , 2010, Comput. Oper. Res..

[10]  Arun Kumar,et al.  Vehicle Routing with Cross Docks, Split Deliveries, and Multiple Use of Vehicles , 2011 .

[11]  Nils Boysen,et al.  Cross dock scheduling: Classification, literature review and research agenda , 2010 .

[12]  Mostafa Zandieh,et al.  Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage , 2011, Expert Syst. Appl..

[13]  M. Zandieh,et al.  A multi-criteria cross-docking scheduling with just-in-time approach , 2010 .

[14]  Y. Li,et al.  Crossdocking—JIT scheduling with time windows , 2004, J. Oper. Res. Soc..

[15]  Young Hae Lee,et al.  Vehicle routing scheduling for cross-docking in the supply chain , 2006, Comput. Ind. Eng..

[16]  Seyyed M. T. Fatemi Ghomi,et al.  Vehicle routing scheduling problem with cross docking and split deliveries , 2014, Comput. Chem. Eng..

[17]  Reza Tavakkoli-Moghaddam,et al.  Vehicle routing scheduling using an enhanced hybrid optimization approach , 2010, Journal of Intelligent Manufacturing.

[18]  Manuel Laguna,et al.  Tabu Search , 1997 .

[19]  Ching-Jong Liao,et al.  Vehicle routing with cross-docking in the supply chain , 2010, Expert Syst. Appl..

[20]  Bernard Penz,et al.  A bounded dynamic programming approach to schedule operations in a cross docking platform , 2011, Comput. Ind. Eng..

[21]  Alexandre Salles da Cunha,et al.  A Branch-and-price algorithm for a Vehicle Routing Problem with Cross-Docking , 2011, Electron. Notes Discret. Math..

[22]  Pius J. Egbelu,et al.  Scheduling of inbound and outbound trucks in cross docking systems with temporary storage , 2008, Eur. J. Oper. Res..

[23]  Mostafa Zandieh,et al.  Multi-objective genetic-based algorithms for a cross-docking scheduling problem , 2011, Appl. Soft Comput..

[24]  Feng Chen,et al.  Minimizing makespan in two-stage hybrid cross docking scheduling problem , 2009, Comput. Oper. Res..

[25]  M. Zandieh,et al.  A cross-docking scheduling problem with sub-population multi-objective algorithms , 2012 .

[26]  Wooyeon Yu,et al.  Operational strategies for cross docking systems , 2002 .