Soil improvement at Stockholm-Arlanda Airport
暂无分享,去创建一个
At Stockholm-Arlanda Airport a new, third runway is under construction. The project comprises a 2500 m long runway, new taxiways, areas for de-icing and surface water treatment, new public roads, bridges, a new traffic control tower, etc. The conditions at the site of the airport are difficult from a geotechnical standpoint and have necessitated different types of soil improvement techniques. Amongst these, vertical drainage in combination with preloading, consisting of 14–20 m of fill, has been used along the runway/taxiway over an area of 250 000 m2 containing clay and organic deposits. In this paper, a description and theoretical analysis of the vertical-drain project are presented. The load of the fill has caused a relative compression of 22–29%, corresponding to total settlements of 1·6–2·6 m. Une nouvelle et troisieme piste d'atterrissage est en construction a l'aeroport de Stockholm. Le projet comprend une piste d'atterrissage d'une longueur de 2500 m, des nouvelles voies d'acces, des zones de degi...
[1] 赤木 俊允,et al. Effect of displacement type sand drains on strength and compressibility of soft clays , 1977 .
[2] Dennes T. Bergado,et al. Closure of "Smear Effects of Vertical Drains on Soft Bangkok Clay" , 1991 .
[3] A. Skempton. THE PORE-PRESSURE COEFFICIENTS A AND B , 1954 .
[4] S. Hansbo,et al. Aspects of vertical drain design: Darcian or non-Darcian flow , 1997 .