Process Modelling in Civil Engineering
暂无分享,去创建一个
[1] Iris D. Tommelein,et al. Boiler Erection Scheduling Using Product Models and Case-Based Reasoning , 1997 .
[2] Jan Tulke,et al. 4D construction sequence planning – new process and data model , 2007 .
[3] Raymond E. Levitt,et al. An integrated project planning environment , 1993 .
[4] Wolfgang Huhnt,et al. Can algorithms support the specification of construction schedules? , 2006, J. Inf. Technol. Constr..
[5] Wil M. P. van der Aalst,et al. An Alternative Way to Analyze Workflow Graphs , 2002, CAiSE.
[6] Martin Fischer,et al. Challenges and benefits of implementing virtual design and construction technologies for coordination of mechanical, electrical, and plumbing systems on a large healthcare project , 2007 .
[7] Bonsang Koo,et al. Feasibility study of 4D CAD in commercial construction , 2002 .
[8] Graham Winstanley. A planning system for large-scale industrial projects , 1995 .
[9] Robert D. Logcher,et al. GHOST: Project Network Generator , 1988 .
[10] Iris D. Tommelein,et al. Using Product Models to Plan Construction , 1993 .
[11] Nathaniel Palmer,et al. Workflow Management , 2009, Encyclopedia of Database Systems.
[12] W. Huhnt. Generating Sequences of Construction Tasks , 2005 .
[13] Boyd C. Paulson,et al. Professional Construction Management , 1978 .
[14] Florian Aalami,et al. Scheduling with Computer-Interpretable Construction Method Models , 1996 .
[15] Chris Hendrickson,et al. An Expert System for Construction Planning , 1987 .
[16] Peter Jan Pahl,et al. Mathematical Foundations of Computational Engineering , 2001 .
[17] Wolfgang Huhnt. COMPUTING INTERDEPENDENCIES BETWEEN PLANNING AND CONSTRUCTION ACTIVITIES , 2006 .