Study on execution time of ladder diagram in programmable controller

In this paper, we propose the simple experimental method to realize the execution time of ladder diagram (LD) in programmable controllers (PCs). Characteristics of the execution time of a LD are examined experimentally by using the fundamental LD with repetition. Moreover, we establish the estimation method of the execution time of LD. Thus, the relationship between the execution time and the number of vertical rungs, logical AND and OR operations is examined by adding some contacts to the proposed fundamental LD. The experimental results are analyzed statistically. As a result, the increase of the execution time for the number of rungs is remarkable as compared with that of AND and OR operations.

[1]  R. W. Lewis,et al.  Programming Industrial Control Systems Using IEC 1131-3 , 1995 .

[2]  Wook Hyun Kwon,et al.  Predicting execution time of relay ladder logic for programmable logic controllers , 1996, Proceedings 1996 IEEE Conference on Emerging Technologies and Factory Automation. ETFA '96.

[3]  Alan C. Shaw,et al.  Reasoning About Time in Higher-Level Language Software , 1989, IEEE Trans. Software Eng..

[4]  Takashi Sekiguchi,et al.  Estimation of time delay of relay ladder in sequential control systems , 1997, 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings, EFTA '97.