ROADELS: discrete information objects for production planning and control of road construction
暂无分享,去创建一个
[1] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[2] R. F.,et al. Statistical Method from the Viewpoint of Quality Control , 1940, Nature.
[3] J. Amann,et al. Extension of the upcoming IFC alignment standard with cross sections for road design , 2015 .
[4] Rafael Sacks,et al. Construction flow index: a metric of production flow quality in construction , 2017 .
[5] Denise Gravitt. Location‐Based Management for Construction: Planning, Scheduling and Control , 2011 .
[6] W. Edwards Deming,et al. Out of the Crisis , 1982 .
[7] Danijel Rebolj,et al. Development and application of a road product model , 2008 .
[8] Leo Sveikauskas,et al. Measuring Productivity Growth in Construction , 2018 .
[9] Charles M. Eastman,et al. BIM Handbook , 2018 .
[10] Bo-Christer Björk. A conceptual model of spaces, space boundaries and enclosing structures , 1992 .
[11] S. Vilgertshofer,et al. IfcTunnel - A proposal for a multi-scale extension of the IFC data model for shield tunnels under consideration of downward compatibility aspects , 2016 .
[12] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[13] Roger W. Schmenner. Production/Operations Management: From the Inside Out , 1993 .
[14] 新郷 重夫,et al. A study of the Toyota production system from an industrial engineering viewpoint , 1989 .