Three-Phase Method for the Capacitated Lot-Sizing Problem with Sequence Dependent Setups

[1]  John M. Wilson,et al.  The capacitated lot sizing problem: a review of models and algorithms , 2003 .

[2]  Diego Klabjan,et al.  Modeling lotsizing and scheduling problems with sequence dependent setups , 2014, Eur. J. Oper. Res..

[3]  Heinrich Kuhn,et al.  Capacitated lot-sizing with extensions: a review , 2008, 4OR.

[4]  Stéphane Dauzère-Pérès,et al.  Integration of lotsizing and scheduling decisions in a job-shop , 1994 .

[5]  Geraldo Robson Mateus,et al.  Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration , 2010, J. Sched..

[6]  Ross J. W. James,et al.  Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics , 2011, Comput. Oper. Res..

[7]  Stéphane Dauzère-Pérès,et al.  A Two-Phase Iterative Heuristic Approach for the Production Routing Problem , 2015, Transp. Sci..

[8]  Reinaldo Morabito,et al.  Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching , 2010, J. Sched..

[9]  Patrizia Beraldi,et al.  Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..

[10]  Safia Kedad-Sidhoum,et al.  The multi-item capacitated lot-sizing problem with setup times and shortage costs , 2008, Eur. J. Oper. Res..

[11]  Waldemar Kaczmarczyk Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines , 2013 .