Cruise speed reduction for ground delay programs: A case study for San Francisco International Airport arrivals

Ground Delay Programs (GDP) are sometimes cancelled before their initial planned duration and for this reason aircraft are delayed when it is no longer needed. Recovering this delay usually leads to extra fuel consumption, since the aircraft will typically depart after having absorbed on ground their assigned delay and, therefore, they will need to cruise at more fuel consuming speeds. Past research has proposed speed reduction strategy aiming at splitting the GDP-assigned delay between ground and airborne delay, while using the same fuel as in nominal conditions. Being airborne earlier, an aircraft can speed up to nominal cruise speed and recover part of the GDP delay without incurring extra fuel consumption if the GDP is cancelled earlier than planned. In this paper, all GDP initiatives that occurred in San Francisco International Airport during 2006 are studied and characterised by a K-means algorithm into three different clusters. The centroids for these three clusters have been used to simulate three different GDPs at the airport by using a realistic set of inbound traffic and the Future Air Traffic Management Concepts Evaluation Tool (FACET). The amount of delay that can be recovered using this cruise speed reduction technique, as a function of the GDP cancellation time, has been computed and compared with the delay recovered with the current concept of operations. Simulations have been conducted in calm wind situation and without considering a radius of exemption. Results indicate that when aircraft depart early and fly at the slower speed they can recover additional delays, compared to current operations where all delays are absorbed prior to take-off, in the event the GDP cancels early. There is a variability of extra delay recovered, being more significant, in relative terms, for those GDPs with a relatively low amount of demand exceeding the airport capacity.

[1]  Michael O. Ball,et al.  Ground Delay Program Planning under Uncertainty Based on the Ration-by-Distance Principle , 2007, Transp. Sci..

[2]  Sandrine Carlier,et al.  ENVIRONMENTAL IMPACT OF AIR TRAFFIC FLOW MANAGEMENT DELAYS , 2007 .

[3]  Marcus B. Lowther,et al.  En route speed optimization for continuous descent arrival , 2008 .

[4]  Milan Janic,et al.  Modelling the capacity of closely-spaced parallel runways using innovative approach procedures , 2008 .

[5]  Amedeo R. Odoni,et al.  Dynamic solution to the ground-holding problem in air traffic control , 1994 .

[6]  J. MacQueen Some methods for classification and analysis of multivariate observations , 1967 .

[7]  Xavier Prats,et al.  Effect of Wind on Operating-Cost-Based Cruise Speed Reduction for Delay Absorption , 2013, IEEE Transactions on Intelligent Transportation Systems.

[8]  Balázs Kotnyek,et al.  Equitable Models for the Stochastic Ground-Holding Problem Under Collaborative Decision Making , 2006, Transp. Sci..

[9]  Rajeev Kapila,et al.  Annual Report 2007-2008 , 2008 .

[10]  John Lygeros,et al.  A simulation based study of subliminal control for air traffic management , 2010 .

[11]  Dimitris Bertsimas,et al.  The Air Traffic Flow Management Problem with Enroute Capacities , 1998, Oper. Res..

[12]  Xavier Prats,et al.  En Route Speed Reduction Concept for Absorbing Air Traffic Flow Management Delays , 2012 .

[13]  Kapil Sheth,et al.  FACET: Future ATM Concepts Evaluation Tool , 2001 .

[14]  Liling Ren,et al.  En Route Speed Change Optimization for Spacing Continuous Descent Arrivals , 2008 .

[15]  Robert Hoffman,et al.  Air Traffic Management , 2011 .

[16]  John Gulding,et al.  Estimating ATM Efficiency Pools in the Descent Phase of Flight Potential Savings in both Time and Fuel , 2011 .

[17]  Michael O. Ball,et al.  ESTIMATING ONE-PARAMETER AIRPORT ARRIVAL CAPACITY DISTRIBUTIONS FOR AIR TRAFFIC FLOW MANAGEMENT , 2004 .

[18]  Andrew J. Cook,et al.  Dynamic cost indexing – Managing airline delay costs , 2009 .

[19]  Lara Cook,et al.  A Model for Determining Ground Delay Program Parameters Using a Probabilistic Forecast of Stratus Clearing , 2010 .

[20]  Mark Hansen,et al.  Ground delay program planning under uncertainty in airport capacity , 2009 .

[21]  Xavier Prats,et al.  Simulation of airborne ATFM delay and delay recovery by cruise speed reduction , 2011 .

[22]  Michael O. Ball,et al.  Ground Delay Programs: Optimizing over the Included Flight Set Based on Distance , 2004 .

[23]  Mark Hansen,et al.  Scenario-based air traffic flow management: From theory to practice , 2008 .

[24]  Dimitris Bertsimas,et al.  The Traffic Flow Management Rerouting Problem in Air Traffic Control: A Dynamic Network Flow Approach , 2000, Transp. Sci..

[25]  Cynthia Barnhart,et al.  Quantitative problem solving methods in the airline industry : a modeling methodology handbook , 2012 .