One- and two-phase heuristics for workforce scheduling
暂无分享,去创建一个
[1] George B. Dantzig,et al. Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..
[2] M. Segal,et al. The Operator-Scheduling Problem: A Network-Flow Approach , 1974, Oper. Res..
[3] William L. Berry,et al. Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis , 1976 .
[4] Leslie C. Edie,et al. Traffic Delays at Toll Booths , 1954, Oper. Res..
[5] R. Tibrewala,et al. Optimal Scheduiing of Two Consecutive Idle Periods , 1972 .
[6] Kenneth R. Baker,et al. An Optimal Procedure for Allocating Manpower with Cyclic Requirements , 1973 .
[7] W. L. Berry,et al. DETERMINING OPTIMAL SHIFT SCHEDULES FOR TELEPHONE TRAFFIC EXCHANGE OPERATORS , 1977 .
[8] B. T. Bennett,et al. Rotating Roster for a Transit System , 1968 .
[9] Kenneth R. Baker,et al. Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements , 1974 .