A risk identification procedure for construction contracts—a case study of power station projects in Egypt
暂无分享,去创建一个
[1] Steve Scott,et al. United Kingdom Construction Claims: Views of Professionals , 2004 .
[2] C. Charoenngam,et al. Contractual risk and liability sharing in hydropower construction , 1999 .
[3] Steve Simister,et al. Usage and benefits of project risk analysis and management , 1994 .
[4] Dongping Fang,et al. Risk Assessment Model of Tendering for Chinese Building Projects , 2004 .
[5] Thomas E. Uher,et al. Risk management in the conceptual phase of a project , 1999 .
[6] A. Akintoye,et al. Risk analysis and management in construction , 1997 .
[7] Alfredo del Caño,et al. Integrated Methodology for Project Risk Management , 2002 .
[8] Liang Y Liu,et al. ANALYTICAL MODEL FOR ANALYZING CONSTRUCTION CLAIMS AND OPPORTUNISTIC BIDDING , 2004 .
[9] Francis T. Hartman,et al. Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .
[10] Francis T. Hartman,et al. Contractors' Construction‐Claims Avoidance , 1994 .
[11] Ross. W Hayes. Risk management in engineering construction : implications for project managers : a report of research supported by the SERC specially promoted programme in construction management and prepared by the Project Management Group, UMIST , 1987 .
[12] V. M. Rao Tummala,et al. Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project , 1999 .
[13] Chris Chapman,et al. Project risk analysis and management - PRAM the generic process , 1997 .