Optimal operator assignment and cell loading in labor-intensive manufacturing cells
暂无分享,去创建一个
In this paper, a two-phase hierarchical methodology is proposed to find the optimal manpower assignment and cell loads simultaneously. Mixed integer and integer programming formulations are proposed (1) to generate alternative operator levels and (2) to achieve the optimal operator and product assignment to the cells. The methodology is illustrated with an example problem drawn from a real manufacturing company. The methodology remains valid for most labor-intensive manufacturing cells. The paper concludes with comments in regard to the implementation of the proposed methodology.
[1] F. Robert Jacobs,et al. A simulation comparison of group technology with traditional job shop manufacturing , 1986 .
[2] F. Robert Jacobs,et al. Applications and Implementation: AN EXPERIMENTAL COMPARISON OF CELLULAR (GROUP TECHNOLOGY) LAYOUT WITH PROCESS LAYOUT , 1987 .
[3] Gürsel A. Süer,et al. Manufacturing cell loading rules and algorithms for connected cells , 1995 .