Improving construction supply chain collaboration and performance: a lean construction pilot project

Improving construction supply chain collaboration and performance is central for achieving short-term business objectives as well as long-term competitive advantage. Lean thinking is an approach th ...

[1]  Andi,et al.  Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .

[2]  M. Naim,et al.  An innovative supply chain strategy for customized housing , 2003 .

[3]  Per Erik Eriksson,et al.  Procurement Effects on Coopetition in Client-Contractor Relationships , 2008 .

[4]  Iris D. Tommelein,et al.  Consequences of competitive bidding in project-based production , 2005 .

[5]  Akintola Akintoye,et al.  Just-in-Time application and implementation for building material management , 1995 .

[6]  M. Pratt From the Editors: For the Lack of a Boilerplate: Tips on Writing Up (and Reviewing) Qualitative Research , 2009 .

[7]  Anders Segerstedt Escape from the unnecessary : some guidelines for production management , 1999 .

[8]  H. Wee,et al.  Lean supply chain and its effect on product cost and quality: a case study on Ford Motor Company , 2009 .

[9]  M. J. Riley,et al.  COMPARISON OF CULTURES IN CONSTRUCTION AND MANUFACTURING INDUSTRIES , 2001 .

[10]  Stuart D. Green,et al.  Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’ , 2005 .

[11]  Stephen Emmitt,et al.  Lost in transition: the transfer of lean manufacturing to construction , 2008 .

[12]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[13]  S. Disney,et al.  Speeding up the progress curve towards effective supply chain management , 2000 .

[14]  Ossama Salem,et al.  Lean Construction: From Theory to Implementation , 2006 .

[15]  Per Erik Eriksson,et al.  Partnering the Construction of a Swedish Pharmaceutical Plant: Case Study , 2008 .

[16]  Stuart D. Green The missing arguments of lean construction , 1999 .

[17]  Angappa Gunasekaran,et al.  Measuring performance within the supply chain of a large scale project , 2007 .

[18]  Lars Stehn,et al.  Applicability of lean principles and practices in industrialized housing production , 2008 .

[19]  William Swan,et al.  Building trust in construction projects , 2007 .

[20]  Xueqing Zhang,et al.  Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques , 2008 .

[21]  Stephen Emmitt,et al.  Investigating the integration of design and construction from a “lean” perspective , 2009 .

[22]  Paul Humphreys,et al.  Pre‐construction project partnering: from adversarial to collaborative relationships , 2003 .

[23]  Iris D. Tommelein,et al.  Theoretical comparison of alternative delivery systems for projects in unpredictable environments , 2004 .

[24]  Brychan Thomas,et al.  HARMONIZATION BETWEEN MAIN CONTRACTORS AND SUBCONTRACTORS: A PREREQUISITE FOR LEAN CONSTRUCTION? , 2002 .

[25]  Ossi Pesämaa,et al.  Modelling procurement effects on cooperation , 2007 .

[26]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[27]  Yasser Mohamed,et al.  Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance , 2009 .

[28]  David Gann,et al.  Putting academic ideas into practice: technological progress and the absorptive capacity of construction organizations , 2001 .

[29]  Per Erik Eriksson,et al.  Procurement effects on trust and control in client-contractor relationships , 2007 .

[30]  William F. Maloney Construction Product/Service and Customer Satisfaction , 2002 .

[31]  Nicolaj Siggelkow Persuasion with case studies , 2007 .

[32]  Glenn Ballard,et al.  Learning to see work flow: an application of lean concepts to precast concrete fabrication , 2003 .

[33]  Per Erik Eriksson,et al.  The influence of partnering and procurement on subcontractor involvement and innovation , 2007 .

[34]  Alexander Styhre,et al.  Learning capabilities in organizational networks: case studies of six construction projects , 2004 .

[35]  Irtishad Ahmad,et al.  Action Research as a Proactive Research Method for Construction Engineering and Management , 2010 .

[36]  James T. O'Connor,et al.  Project Performance versus Use of Technologies at Project and Phase Levels , 2004 .

[37]  Graham Winch,et al.  Towards a theory of construction as production by projects , 2006 .

[38]  Thomas Olofsson,et al.  Credibility and applicability of virtual reality models in design and construction , 2008, Adv. Eng. Informatics.

[39]  Stuart D. Green THE HUMAN RESOURCE MANAGEMENT IMPLICATIONS OF LEAN CONSTRUCTION: CRITICAL PERSPECTIVES AND CONCEPTUAL CHASMS , 2002 .

[40]  A. Edmondson,et al.  METHODOLOGICAL FIT IN MANAGEMENT FIELD RESEARCH. , 2007 .

[41]  Luis F. Alarcón,et al.  Achieving Lean Design Process: Improvement Methodology , 2002 .

[42]  Lars-Erik Gadde,et al.  Supply strategy and network effects — purchasing behaviour in the construction industry , 2000 .

[43]  Gregory A. Howell,et al.  Lean project management , 2003 .

[44]  A. Fearne,et al.  Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation , 2006 .

[45]  R. Yin Case Study Research: Design and Methods , 1984 .

[46]  Low Sui Pheng,et al.  Modern‐day lean construction principles , 2005 .