[1] Andi,et al. Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .
[2] M. Naim,et al. An innovative supply chain strategy for customized housing , 2003 .
[3] Per Erik Eriksson,et al. Procurement Effects on Coopetition in Client-Contractor Relationships , 2008 .
[4] Iris D. Tommelein,et al. Consequences of competitive bidding in project-based production , 2005 .
[5] Akintola Akintoye,et al. Just-in-Time application and implementation for building material management , 1995 .
[6] M. Pratt. From the Editors: For the Lack of a Boilerplate: Tips on Writing Up (and Reviewing) Qualitative Research , 2009 .
[7] Anders Segerstedt. Escape from the unnecessary : some guidelines for production management , 1999 .
[8] H. Wee,et al. Lean supply chain and its effect on product cost and quality: a case study on Ford Motor Company , 2009 .
[9] M. J. Riley,et al. COMPARISON OF CULTURES IN CONSTRUCTION AND MANUFACTURING INDUSTRIES , 2001 .
[10] Stuart D. Green,et al. Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’ , 2005 .
[11] Stephen Emmitt,et al. Lost in transition: the transfer of lean manufacturing to construction , 2008 .
[12] Danny Berry,et al. Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .
[13] S. Disney,et al. Speeding up the progress curve towards effective supply chain management , 2000 .
[14] Ossama Salem,et al. Lean Construction: From Theory to Implementation , 2006 .
[15] Per Erik Eriksson,et al. Partnering the Construction of a Swedish Pharmaceutical Plant: Case Study , 2008 .
[16] Stuart D. Green. The missing arguments of lean construction , 1999 .
[17] Angappa Gunasekaran,et al. Measuring performance within the supply chain of a large scale project , 2007 .
[18] Lars Stehn,et al. Applicability of lean principles and practices in industrialized housing production , 2008 .
[19] William Swan,et al. Building trust in construction projects , 2007 .
[20] Xueqing Zhang,et al. Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques , 2008 .
[21] Stephen Emmitt,et al. Investigating the integration of design and construction from a “lean” perspective , 2009 .
[22] Paul Humphreys,et al. Pre‐construction project partnering: from adversarial to collaborative relationships , 2003 .
[23] Iris D. Tommelein,et al. Theoretical comparison of alternative delivery systems for projects in unpredictable environments , 2004 .
[24] Brychan Thomas,et al. HARMONIZATION BETWEEN MAIN CONTRACTORS AND SUBCONTRACTORS: A PREREQUISITE FOR LEAN CONSTRUCTION? , 2002 .
[25] Ossi Pesämaa,et al. Modelling procurement effects on cooperation , 2007 .
[26] Daniel T. Jones,et al. The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .
[27] Yasser Mohamed,et al. Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance , 2009 .
[28] David Gann,et al. Putting academic ideas into practice: technological progress and the absorptive capacity of construction organizations , 2001 .
[29] Per Erik Eriksson,et al. Procurement effects on trust and control in client-contractor relationships , 2007 .
[30] William F. Maloney. Construction Product/Service and Customer Satisfaction , 2002 .
[31] Nicolaj Siggelkow. Persuasion with case studies , 2007 .
[32] Glenn Ballard,et al. Learning to see work flow: an application of lean concepts to precast concrete fabrication , 2003 .
[33] Per Erik Eriksson,et al. The influence of partnering and procurement on subcontractor involvement and innovation , 2007 .
[34] Alexander Styhre,et al. Learning capabilities in organizational networks: case studies of six construction projects , 2004 .
[35] Irtishad Ahmad,et al. Action Research as a Proactive Research Method for Construction Engineering and Management , 2010 .
[36] James T. O'Connor,et al. Project Performance versus Use of Technologies at Project and Phase Levels , 2004 .
[37] Graham Winch,et al. Towards a theory of construction as production by projects , 2006 .
[38] Thomas Olofsson,et al. Credibility and applicability of virtual reality models in design and construction , 2008, Adv. Eng. Informatics.
[39] Stuart D. Green. THE HUMAN RESOURCE MANAGEMENT IMPLICATIONS OF LEAN CONSTRUCTION: CRITICAL PERSPECTIVES AND CONCEPTUAL CHASMS , 2002 .
[40] A. Edmondson,et al. METHODOLOGICAL FIT IN MANAGEMENT FIELD RESEARCH. , 2007 .
[41] Luis F. Alarcón,et al. Achieving Lean Design Process: Improvement Methodology , 2002 .
[42] Lars-Erik Gadde,et al. Supply strategy and network effects — purchasing behaviour in the construction industry , 2000 .
[43] Gregory A. Howell,et al. Lean project management , 2003 .
[44] A. Fearne,et al. Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation , 2006 .
[45] R. Yin. Case Study Research: Design and Methods , 1984 .
[46] Low Sui Pheng,et al. Modern‐day lean construction principles , 2005 .