Available transfer capability enhancement with FACTS using Cat Swarm Optimization
暂无分享,去创建一个
[1] Harinder Sawhney,et al. Application of unified power flow controller for available transfer capability enhancement , 2004 .
[2] G. MadhusudhanaRao,et al. Optimal location of TCSC and SVC for enhancement of ATC in a de-regulated environment using RGA , 2010, 2010 IEEE International Conference on Computational Intelligence and Computing Research.
[3] Venkataramana Ajjarapu,et al. The continuation power flow: a tool for steady state voltage stability analysis , 1991 .
[4] Jeng-Shyang Pan,et al. Ant colony system with communication strategies , 2004, Inf. Sci..
[5] Jeng-Shyang Pan,et al. Cat swarm optimization , 2006 .
[6] Y. H. Song,et al. Available transfer capability enhancement using FACTS devices , 2003 .
[7] Naresh Acharya,et al. Locating series FACTS devices for congestion management in deregulated electricity markets , 2007 .
[8] G. B. Shrestha,et al. Allocation of TCSC devices to optimize total transmission capacity in a competitive power market , 2001, 2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194).
[9] S. Gerbex,et al. Optimal Location of Multi-Type FACTS Devices in a Power System by Means of Genetic Algorithms , 2001, IEEE Power Engineering Review.
[10] Ramesh C. Bansal,et al. Technology of VAr compensators for induction generator applications in wind energy conversion systems , 2006 .
[11] James Kennedy,et al. Particle swarm optimization , 2002, Proceedings of ICNN'95 - International Conference on Neural Networks.
[12] S. Sivanagaraju,et al. Multi-objective optimization in the presence of practical constraints using non-dominated sorting hybrid cuckoo search algorithm , 2015 .
[13] K. L. Thakre,et al. Computation of TCSC reactance and suggesting criterion of its location for ATC improvement , 2009 .
[14] T. Nireekshana,et al. Enhancement of ATC with FACTS devices using Real-code Genetic Algorithm , 2012 .