Object-oriented technology for enhancing activity-based modeling functionality

Computer simulation is a powerful tool for analyzing and optimizing real-world systems with a wide range of successful applications. However, construction engineers have difficulty in mastering such techniques, particularly in modeling a construction process because existing simulation modeling methods require the user to manipulate many modeling elements in order to construct a simulation model for the process. The activity-based construction (ABC) modeling method provides an easy-to-use approach with one single element, e.g., activity, for modeling a construction process. This paper discusses the integration of object-oriented technology with ABC. The object-oriented technology allows each activity contain six classes of attributes describing the characteristics of the activity including duration, logical sequence, resource requirement, etc. These attributes are relevant to individual activities, and can be easily understood by an engineer who is familiar with the process. After incorporating these attributes, powerful modeling and simulation functions are realized. The integration greatly enhances the capability of ABC so that the enhanced ABC system has achieved both flexibility and ease-of-use essential for a construction simulation system.

[1]  Michael Pidd,et al.  Computer Simulation in Management Science (3rd Edition) , 1998 .

[2]  Simaan M. AbouRizk,et al.  Resource-based modeling for construction simulation , 1997 .

[3]  K. D. Tocher,et al.  The art of simulation , 1967 .

[4]  M. Pidd COMPUTER SIMULATION FOR OPERATIONAL RESEARCH IN 1984 , 1984 .

[5]  K. C. Er,et al.  Special purpose simulation template for utility tunnel construction , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).

[6]  D.W. Halpin,et al.  Real world applications of construction process simulation , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).

[7]  Ray J. Paul Activity cycle diagrams and the three-phase method , 1993, WSC '93.

[8]  Ray J. Paul Recent Developments in Simulation Modelling , 1991 .

[9]  Iris D. Tommelein,et al.  Knowledge-based assembly of simulation networks using construction designs, plans, and methods , 1994, Proceedings of Winter Simulation Conference.

[10]  Photios G. Ioannou,et al.  General-purpose systems for effective construction simulation , 1999 .

[11]  Jingsheng Shi,et al.  An Automated Modeling System for Simulating Earthmoving Operations , 1998 .

[12]  Victor E. Middleton,et al.  Proceedings of the 1993 Winter Simulation Conference , 1993 .

[13]  A. Alan B. Pritsker,et al.  Introduction to simulation and SLAM II , 1979 .

[14]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[15]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .

[16]  Jonathan Jingsheng Shi,et al.  ACTIVITY-BASED CONSTRUCTION (ABC) MODELING AND SIMULATION METHOD , 1999 .

[17]  Photios G. Ioannou,et al.  Graphical object-oriented discrete-event simulation system , 1992, WSC '92.

[18]  Jonathan Jingsheng Shi Activity Based Construction (ABC) Simulation Modeling vs. Critical Path Method (CPM) , 2000 .

[19]  R. D. Smet Simulation modeling and analysis (2nd edition): Averill M. Law and W. David Kelton McGraw-Hill, Inc., New York, 1991, xxii + 759 pages, £31.05, ISBN 0 07 036698 5 , 1993 .

[20]  Boyd C. Paulson Interactive Graphics for Simulating Construction Operations , 1978 .

[21]  A. Alan B. Pritsker Introduction to simulation and SLAM II (2nd ed.) , 1984 .

[22]  Simaan M. AbouRizk,et al.  Simphony: an environment for building special purpose construction simulation tools , 1999, WSC '99.

[23]  Daniel W. Halpin,et al.  Simulation of cable-stayed bridges using DISCO , 1994, Proceedings of Winter Simulation Conference.

[24]  Daniel W. Halpin,et al.  Process-based research to meet the international challenge , 1993 .