Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning

Adequate estimation of construction costs is a key factor in construction projects. This paper examines the performance of three cost estimation models. The examinations are based on multiple regression analysis (MRA), neural networks (NNs), and case-based reasoning (CBR) of the data of 530 historical costs. Although the best NN estimating model gave more accurate estimating results than either the MRA or the CBR estimating models, the CBR estimating model performed better than the NN estimating model with respect to long-term use, available information from result, and time versus accuracy tradeoffs.

[1]  Janet L. Kolodner,et al.  An introduction to case-based reasoning , 1992, Artificial Intelligence Review.

[2]  Tarek Hegazy,et al.  Potential applications of neural networks in construction , 1992 .

[3]  Weng Tat Chan,et al.  Case-based reasoning approach in bid decision making , 2001 .

[4]  J. M. Garza,et al.  Neural networks versus parameter-based applications in cost estimating , 1995 .

[5]  Phillip Burrell,et al.  Case-Based Reasoning System and Artificial Neural Networks: A Review , 2001, Neural Computing & Applications.

[6]  Spyros G. Tzafestas,et al.  On the overtraining phenomenon of backpropagation neural networks , 1996 .

[7]  Alice E. Smith,et al.  COST ESTIMATION PREDICTIVE MODELING: REGRESSION VERSUS NEURAL NETWORK , 1997 .

[8]  Hojjat Adeli,et al.  Regularization neural network for construction cost estimation , 1998 .

[9]  Onur Behzat Tokdemir,et al.  Comparison of Case-Based Reasoning and Artificial Neural Networks , 1999 .

[10]  Tarek Hegazy,et al.  Developing Practical Neural Network Applications Using Back‐Propagation , 1994 .

[11]  Christopher K. Riesbeck,et al.  Inside Case-Based Reasoning , 1989 .

[12]  Nie-Jia Yau,et al.  Applying case-based reasoning technique to retaining wall selection , 1998 .

[13]  Vasily Kouskoulas,et al.  Predesign Cost-Estimation Function for Buildings , 1974 .

[14]  Tarek Hegazy,et al.  Neural networks as tools in construction , 1991 .

[15]  Paul Bowen,et al.  Cost modelling and price forecasting: practice and theory in perspective , 1985 .

[16]  Srinath Perera,et al.  Collaborative case-based estimating and design , 1998 .

[17]  Mary Lou Maher,et al.  Multimedia Approach to Case‐Based Structural Design , 1994 .

[18]  George Morcous,et al.  Case-Based Reasoning System for Modeling Infrastructure Deterioration , 2002 .

[19]  R. C. Creese,et al.  Cost estimation of timber bridges using neural networks , 1995 .

[20]  Heng Li,et al.  Neural networks for construction cost estimation , 1995 .

[21]  Joseph H. M. Tah,et al.  Information modellng for case-based construction planning of highway bridge projects , 1999 .

[22]  Miroslaw J. Skibniewski,et al.  Neural Network Method of Estimating Construction Technology Acceptability , 1995 .

[23]  Farzad Khosrowshahi,et al.  Estimation of project total cost and duration for housing projects in the U.K. , 1996 .

[24]  I-Cheng Yeh,et al.  Quantity Estimating of Building with Logarithm-Neuron Networks , 1998 .

[25]  Ann Heylighen,et al.  A case base of Case-Based Design tools for architecture , 2001, Comput. Aided Des..

[26]  Tarek Hegazy,et al.  NEURAL NETWORK MODEL FOR PARAMETRIC COST ESTIMATION OF HIGHWAY PROJECTS , 1998 .

[27]  S. Thomas Ng,et al.  Forecast models for actual construction time and cost , 2003 .

[28]  Hugues Rivard,et al.  SEED-Config: a tool for conceptual structural design in a collaborative building design environment , 2000, Artif. Intell. Eng..

[29]  Jürgen Bode,et al.  Neural networks for cost estimation: Simulations and pilot application , 2000 .

[30]  Qing Wang,et al.  Process cost modelling using neural networks , 2000 .

[31]  Surinder Singh Cost Model for Reinforced Concrete Beam and Slab Structures in Buildings , 1990 .

[32]  A. Halim Boussabaine,et al.  The use of artificial neural networks in construction management: a review , 1996 .

[33]  Andrés Gómez de Silva Garza,et al.  Developing Case-Based Reasoning for Structural Design , 1996, IEEE Expert.

[34]  Martin Skitmore,et al.  Developments in contract price forecasting and bidding techniques , 1990 .

[35]  S Mazouz,et al.  The integration of environmental variables in the process of architectural design: The contribution of expert systems , 2001 .

[36]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[37]  Geoffrey E. Hinton,et al.  Learning internal representations by error propagation , 1986 .

[38]  Yacine Rezgui,et al.  A case-based approach to construction process activity specification , 1997, Proceedings Intelligent Information Systems. IIS'97.

[39]  Martin Skitmore The effect of project information on the accuracy of building price forecasts , 1987 .

[40]  C. M. Tam,et al.  Comparative Cost Analysis of Using High-Performance Concrete in Tall Building Construction by Artificial Neural Networks , 1999 .