C Reactor overbore test facility review
暂无分享,去创建一个
In 1961, large-size, smooth-bore, Zircaloy process tubes were installed in C-Reactor graphite channels that had been enlarged to 2.275 inches. These tubes were installed to provide a test and demonstration facility for the concept of overboring as a means of securing significant improvement in the production capability of the reactors, After two years of facility operation, it is now appropriate to consider the extent to which original objectives have been achieved, to re-examine the original objectives, and to consider the best future use of this unique facility. This report presents the general results of such a review and re-examination in more detail.