Real-time batch sequencing using arrival time control algorithm

This paper proposes a new feedback control method for batch sequencing in process industries where meeting customer due-date is important. Specifically, short-term batch sequencing for Just-In-Time is solved using an arrival time control approach. An integral controller embedded in each order adjusts the arrival time in real-time using the feedback obtained from a fast-mode simulation of the batch processing system. The applicability of the proposed batch sequencing method for the Penn State University Creamery is studied. Comparison of due-date performance with commonly used dispatching rules is presented. The proposed method has also been tested for general batch processing systems and has been found to produce good, feasible schedules with significantly better performance than the dispatching rules in terms of due-date deviation minimization.

[1]  Efstratios N. Pistikopoulos,et al.  Design of multiproduct batch plants with uncertain demands , 1995 .

[2]  I. Grossmann,et al.  Mixed-integer linear programming reformulations for batch process design with discrete equipment sizes , 1992 .

[3]  Neil A. Duffie,et al.  Real-time distributed scheduling of heterarchical manufacturing systems , 1994 .

[4]  G. Reklaitis,et al.  HEURISTIC ALGORITHM FOR SCHEDULING BATCH AND SEMI-CONTINUOUS PLANTS WITH PRODUCTION DEADLINES, INTERMEDIATE STORAGE LIMITATIONS AND EQUIPMENT CHANGEOVER COSTS , 1994 .

[5]  Richard A. Wysk,et al.  A hybrid shop-floor control system for food manufacturing , 2001 .

[6]  Vittaldas V. Prabhu Performance of real-time distributed arrival time control in heterarchical manufacturing systems , 2000 .

[7]  G. Reklaitis,et al.  Multiproduct plant scheduling studies using BOSS , 1987 .

[8]  David M. Dilts,et al.  The evolution of control architectures for automated manufacturing systems , 1991 .

[9]  VITTALDAS V. PRABHU Performance of real-time distributed arrival time control in heterarchical manufacturing systems , 2000 .

[10]  I. Grossmann,et al.  MINLP model for cyclic multiproduct scheduling on continuous parallel lines , 1991 .

[11]  G. Reklaitis,et al.  Scheduling of multipurpose batch chemical plants with resource constraints , 1993 .

[12]  Neil A. Duffie,et al.  Distributed simulation approach for enabling cooperation between entities in heterarchical manufacturing systems , 1995, Optics East.

[13]  Gintaras V. Reklaitis Scheduling approaches for the batch process industries , 1995 .

[14]  R. Sargent,et al.  A general algorithm for short-term scheduling of batch operations */I , 1993 .

[15]  Gintaras V. Reklaitis,et al.  GASP IV and the Simulation of Batch/Semicontinuous Operations: Single Train Process , 1978 .

[16]  Serge Domenech,et al.  A discrete-event simulation approach for scheduling batch processes , 1995 .

[17]  Vittaldas V. Prabhu,et al.  Nonlinear dynamics in distributed arrival time control of heterarchical manufacturing systems , 1999, IEEE Trans. Control. Syst. Technol..

[18]  Neil A. Duffie,et al.  Non Hierarchical Control of a Flexible Manufacturing Cell , 1987 .

[19]  Neil A. Duffie,et al.  Modelling and Analysis of Nonlinear Dynamics in Autonomous Heterarchical Manufacturing Systems Control , 1995 .