A bi-objective MILP model for blocking hybrid flexible flow shop scheduling problem: robust possibilistic programming approach

ABSTRACT One of the important issues in scheduling due to the frequent use of it in manufacturing industries and factories is the hybrid flow shop (HFS) scheduling problem. In this paper, a bi-objective mixed integer linear programming (MILP) model for the problem is presented in which blocking constraint is also considered. The first objective function tries to minimize the makespan and the second one tries to minimize the total costs of machine allocation at each stage. In fact, in this model, the number and the type of machines at each stage are determined by the model according to the processing and setup times and cost of machines. Because most issues in the real world are uncertain, in this study, processing times, sequence-dependent setup times, and costs are considered as uncertain parameters. The robust possibilistic programming (RPP) approach is used to cope with the uncertainty. In this paper, the realistic and the hard worst-case robust approaches are used. The realistic and the soft worst-case robust models became the same because we are only concerned about the robustness of the makespan. Comparing the results between fuzzy and robust fuzzy models shows that the realistic model is more suitable than fuzzy and hard worst-case models in terms of mean and standard deviation.

[1]  Mostafa Zandieh,et al.  An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking , 2009 .

[2]  Melvyn Sim,et al.  Robust discrete optimization and network flows , 2003, Math. Program..

[3]  Melvyn Sim,et al.  The Price of Robustness , 2004, Oper. Res..

[4]  Jatinder N. D. Gupta,et al.  Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .

[5]  Giuseppe Bruno,et al.  Flow Shop Scheduling , 2018, Principles of Sequencing and Scheduling.

[6]  Ling-Huey Su,et al.  Scheduling parallel machines with resource-dependent processing times , 2009 .

[7]  H. Mokhtari,et al.  A multi-objective flow shop scheduling with resource-dependent processing times: trade-off between makespan and cost of resources , 2011 .

[8]  Tamer Eren,et al.  A bicriteria m-machine flowshop scheduling with sequence-dependent setup times , 2010 .

[9]  Mir Saman Pishvaee,et al.  Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty , 2012, Comput. Ind. Eng..

[10]  Cengiz Kahraman,et al.  A New Artificial Immune System Algorithm for Multiobjective Fuzzy Flow Shop , 2009, Int. J. Comput. Intell. Syst..

[11]  Richard F. Hartl,et al.  A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer , 2013 .

[12]  Latifa Dekhici,et al.  Operating Theatre Scheduling Under Constraints , 2010 .

[13]  Masoud Rabbani,et al.  A robust possibilistic programming approach to multiperiod hospital evacuation planning problem under uncertainty , 2018, Int. Trans. Oper. Res..

[14]  Mir Saman Pishvaee,et al.  Robust possibilistic programming for socially responsible supply chain network design: A new approach , 2012, Fuzzy Sets Syst..

[15]  Dong Cao,et al.  Parallel machine selection and job scheduling to minimize machine cost and job tardiness , 2005, Comput. Oper. Res..

[16]  Hideo Tanaka,et al.  Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems , 1994 .

[17]  Chelliah Sriskandarajah,et al.  A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..

[18]  H. Ishibuchi,et al.  Local search algorithms for flow shop scheduling with fuzzy due-dates☆ , 1994 .

[19]  Amelia Bilbao-Terol,et al.  Linear programming with fuzzy parameters: An interactive method resolution , 2007, Eur. J. Oper. Res..

[20]  Peng-Jen Lai,et al.  Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms , 2011, Appl. Soft Comput..

[21]  Mir Saman Pishvaee,et al.  Novel robust fuzzy mathematical programming methods , 2016 .

[22]  Mir Saman Pishvaee,et al.  Multiobjective Robust Possibilistic Programming Approach to Sustainable Bioethanol Supply Chain Design under Multiple Uncertainties , 2016 .

[23]  Xiaoxia Liu,et al.  Study on Hybrid Flow Shop Scheduling Problem with Blocking Based on GASA , 2015 .

[24]  Chieh-Sen Huang,et al.  Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA , 2012, Expert Syst. Appl..

[25]  Richard C. Wilson,et al.  Sequence dependent set-up times and job sequencing , 1977 .

[26]  D. Rippin Design and operation of multiproduct and multipurpose batch chemical plants. — An analysis of problem structure , 1983 .

[27]  George L. Vairaktarakis,et al.  Robust scheduling of a two-machine flow shop with uncertain processing times , 2000 .

[28]  Reza Tavakkoli-Moghaddam,et al.  A New Mathematical Model for Fuzzy Flexible Flow Shop Scheduling of Unrelated Parallel Machines Maximizing the Weighted Satisfaction Level , 2009 .

[29]  Min Liu,et al.  A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry , 2015, Comput. Ind. Eng..

[30]  Donya Rahmani,et al.  Multi-objective flow shop scheduling problem with stochastic parameters: fuzzy goal programming approach , 2014 .

[31]  Rubén Ruiz,et al.  Modeling realistic hybrid flexible flowshop scheduling problems , 2008, Comput. Oper. Res..

[32]  S.M.T. Fatemi Ghomi,et al.  Hybrid flowshop scheduling with machine and resource-dependent processing times , 2011 .

[33]  Mohammad Reza Mohammadi,et al.  A robust possibilistic programming model for a responsive closed loop supply chain network design , 2017 .

[34]  S. Ali Torabi,et al.  A robust possibilistic programming approach for pharmaceutical supply chain network design , 2015, Comput. Chem. Eng..

[35]  Mohammad Bagher Fakhrzad,et al.  Solving flexible flow-shop problem with a hybrid genetic algorithm and data mining: A fuzzy approach , 2011, Expert Syst. Appl..

[36]  Hadi Mokhtari,et al.  A robust modelling and optimisation framework for a batch processing flow shop production system in the presence of uncertainties , 2016, Int. J. Comput. Integr. Manuf..

[37]  Feifeng Zheng,et al.  Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times , 2016 .

[38]  Donya Rahmani,et al.  Robust and stable flow shop scheduling with unexpected arrivals of new jobs and uncertain processing times , 2014 .

[39]  E.Stanley Lee,et al.  Fuzzy job sequencing for a flow shop , 1992 .

[40]  Guohe Huang,et al.  A robust possibilistic mixed-integer programming method for planning municipal electric power systems , 2015 .

[41]  Reza Tavakkoli-Moghaddam,et al.  A robust possibilistic programming approach to multi-period location-allocation of organ transplant centers under uncertainty , 2014, Comput. Ind. Eng..

[42]  Quan-Ke Pan,et al.  Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm , 2015, Inf. Sci..

[43]  Fariborz Jolai,et al.  Robust and Fuzzy Optimisation Models for a Flow shop Scheduling Problem with Sequence Dependent Setup Times: A real case study on a PCB assembly company , 2017, Int. J. Comput. Integr. Manuf..

[44]  R. Tavakkoli-Moghaddam,et al.  Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times , 2013, The International Journal of Advanced Manufacturing Technology.

[45]  M. Mousazadeh,et al.  Health service network design: a robust possibilistic approach , 2018, Int. Trans. Oper. Res..

[46]  Bahman Naderi,et al.  Hybrid flexible flowshop problems: Models and solution methods , 2014 .

[47]  Arkadi Nemirovski,et al.  Robust solutions of Linear Programming problems contaminated with uncertain data , 2000, Math. Program..

[48]  Taïcir Loukil,et al.  A genetic algorithm for robust hybrid flow shop scheduling , 2011, Int. J. Comput. Integr. Manuf..