A new ductile moment-resisting connection for precast concrete frames in seismic regions: An experimental investigation
暂无分享,去创建一个
Reza Ramezani | Iman Hajirasouliha | Hossein Parastesh | I. Hajirasouliha | H. Parastesh | R. Ramezani
[1] Thomas T. C. Hsu,et al. DESIGN FOR TORSION AND SHEAR IN PRESTRESSED CONCRETE FLEXURAL MEMBERS , 2004 .
[2] N. Null. Seismic Rehabilitation of Existing Buildings , 2007 .
[3] Robert Tremblay,et al. Damage to concrete structures due to the 1994 Northridge earthquake , 1995 .
[4] Robert Park,et al. Seismic design and construction of precast concrete buildings in New Zealand , 2002 .
[5] H. S. Lew,et al. Model Precast Concrete Beam-to-Column Connections Subject to Cyclic Loading , 1993 .
[6] Oguzhan Bayrak,et al. Effect of Stirrup Anchorage on Shear Strength of Reinforced Concrete Beams , 2011 .
[7] Teruaki Yamaguchi,et al. SEISMIC PERFORMANCE OF PRECAST CONCRETE BEAM-COLUMN JOINTS , 1994 .
[8] Sudhakar A. Kulkarni,et al. FINITE ELEMENT ANALYSIS OF PRECAST HYBRID-STEEL CONCRETE CONNECTIONS UNDER CYCLIC LOADING , 2008 .
[9] Tuğrul Tankut,et al. Performance of a precast concrete beam-to-beam connection subject to reversed cyclic loading , 2005 .
[10] Akthem Al-Manaseer,et al. Structural Concrete: Theory and Design , 1998 .
[11] Ali R. Khaloo,et al. CYCLIC LOADING OF DUCTILE PRECAST CONCRETE BEAM-COLUMN CONNECTION , 2003 .
[12] D. Sree Rama Chandra Murty,et al. Influence of stirrup spacing on shear resistance of reinforced concrete beams , 2013 .
[13] Huang Li-feng. Experimental study on seismic behavior of middle joints of SCOPE system , 2012 .
[14] Kim S. Elliott,et al. Precast Concrete Structures , 2002 .
[15] N. Null. Minimum Design Loads for Buildings and Other Structures , 2003 .
[16] M. J. N. Priestley,et al. Seismic tests of precast beam-to-column joint subassemblages with unbonded tendons , 1996 .
[17] J. Stanton,et al. Performance of Hybrid Moment-Resisting Precast Beam-Column Concrete Connections Subjected to Cyclic Loading , 1995 .
[18] Weichen Xue,et al. SEISMIC TESTS OF PRECAST CONCRETE, MOMENT RESISTING FRAMES AND CONNECTIONS , 2010 .
[19] Robert Park,et al. Seismic Resistance of Frames Incorporating Precast Prestressed Concrete Beam Shells , 1986 .
[20] Ali R. Khaloo,et al. CYCLIC LOADING RESPONSE OF SIMPLE MOMENT-RESISTING PRECAST CONCRETE BEAM-COLUMN CONNECTION , 2003 .
[21] James L Noland,et al. Computer-Aided Structural Engineering (CASE) Project: Decision Logic Table Formulation of ACI (American Concrete Institute) 318-77 Building Code Requirements for Reinforced Concrete for Automated Constraint Processing. Volume 1. , 1986 .
[22] Michael Hafner,et al. Connections between Precast ElementsFailure Outside Connection Region , 1989 .
[23] G. Cheok,et al. Performance of Precast Concrete Beam-to-Column Connections Subject to Cyclic Loading , 1991 .
[24] Turan Özturan,et al. Ductile Connections in Precast Concrete Moment Resisting Frames , 2006 .
[25] Michael Hafner,et al. Connections Between Precast Elements—Failure Within Connection Region , 1989 .
[26] K. P. Jaya,et al. BEHAVIOUR OF PRECAST BEAM-COLUMN MECHANICAL CONNECTIONS UNDER CYCLIC LOADING , 2012 .